WisDOT contract 20250610009 bid tabulation
Menominee Co Culvert Replacement; STH 55 Countywide (STH 055, Menominee County Menominee Co Culvert Replacements). Let by Wisconsin DOT on June 10, 2025, Menominee. 3 bids received; low bid $652,127 by Relyco Plus, LLC.
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 61
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Relyco Plus, LLC | $652,127 | Low |
| 2 | Highway Landscapers, Inc. | $688,937 | +6.0% |
| 3 | James Peterson Sons, Inc. | $748,305 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Relyco Plus, LLC | 2. Highway Landscapers, Inc. | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 3 | $500.00 | $500.00 | $927.00 |
| 2 | Grubbing (201.0220) | ID | 12 | $50.00 | $40.00 | $57.92 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 9 | $763.95 | $600.00 | $400.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 3,080 | $3.70 | $3.70 | $3.70 |
| 5 | Removing (item description) 01. silt fence (204.9090.S) | LF | 2,295 | $1.50 | $1.50 | $1.50 |
| 6 | Excavation common (205.0100) | CY | 870 | $42.12 | $22.99 | $26.36 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 1009-43-68 (211.0101) | EACH | 1 | $34,780 | $34,780 | $34,780 |
| 8 | Finishing roadway (project) 01. 1009-43-68 (213.0100) | EACH | 1 | $1,500.00 | $500.00 | $1,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 740 | $48.21 | $32.00 | $30.87 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,575 | $25.55 | $22.00 | $24.67 |
| 11 | Tack coat (455.0605) | GAL | 380 | $15.20 | $15.20 | $15.20 |
| 12 | Asphaltic surface (465.0105) | TON | 1,065 | $129.70 | $129.70 | $129.70 |
| 13 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 64 | $205.60 | $504.00 | $535.45 |
| 14 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 32 | $280.57 | $555.00 | $582.15 |
| 15 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $2,047.46 | $2,450.00 | $1,393.06 |
| 16 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,550.13 | $2,700.00 | $1,703.75 |
| 17 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 144 | $232.77 | $557.00 | $590.66 |
| 18 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 8 | $3,197.88 | $2,600.00 | $1,631.63 |
| 19 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643) | EACH | 2 | $5,584.79 | $5,900.00 | $5,803.49 |
| 20 | Riprap medium (606.0200) | CY | 37 | $172.69 | $120.00 | $153.52 |
| 21 | Maintenance and repair of haul roads (project) 01. 1009-43-68 (618.0100) | EACH | 1 | $0.01 | $500.00 | $1.00 |
| 22 | Mobilization (619.1000) | EACH | 1 | $73,500 | $64,480 | $120,804 |
| 23 | Water (624.0100) | MGAL | 70 | $40.00 | $1.00 | $50.00 |
| 24 | Topsoil (625.0100) | SY | 2,500 | $4.50 | $8.00 | $8.33 |
| 25 | Silt fence (628.1504) | LF | 115 | $8.00 | $8.00 | $5.00 |
| 26 | Silt fence maintenance (628.1520) | LF | 4,820 | $0.01 | $0.01 | $0.25 |
| 27 | Mobilizations erosion control (628.1905) | EACH | 4 | $250.00 | $250.00 | $400.00 |
| 28 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 | $400.00 |
| 29 | Erosion mat class I type B (628.2004) | SY | 1,300 | $2.50 | $2.50 | $2.25 |
| 30 | Erosion mat urban class I type A (628.2006) | SY | 1,200 | $3.50 | $3.50 | $2.25 |
| 31 | Culvert pipe checks (628.7555) | EACH | 105 | $14.00 | $14.00 | $15.00 |
| 32 | Rock bags (628.7570) | EACH | 90 | $14.00 | $14.00 | $15.00 |
| 33 | Fertilizer type B (629.0210) | CWT | 2 | $200.00 | $200.00 | $100.00 |
| 34 | Seeding mixture no. 70 (630.0170) | LB | 13 | $250.00 | $250.00 | $300.00 |
| 35 | Seeding temporary (630.0200) | LB | 69 | $4.00 | $4.00 | $10.00 |
| 36 | Seed water (630.0500) | MGAL | 213 | $1.00 | $1.00 | $40.00 |
| 37 | Markers culvert end (633.5200) | EACH | 16 | $85.00 | $85.00 | $75.00 |
| 38 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 3 | $150.00 | $150.00 | $150.00 |
| 39 | Moving signs type II (638.2102) | EACH | 5 | $200.00 | $200.00 | $200.00 |
| 40 | Moving small sign supports (638.4000) | EACH | 5 | $100.00 | $100.00 | $100.00 |
| 41 | Field office type D (642.5401) | EACH | 1 | $10,000 | $6,500.00 | $5,100.00 |
| 42 | Traffic control drums (643.0300) | DAY | 480 | $1.00 | $1.00 | $1.00 |
| 43 | Traffic control barricades type III (643.0420) | DAY | 555 | $2.50 | $2.50 | $2.50 |
| 44 | Traffic control warning lights type A (643.0705) | DAY | 1,110 | $0.25 | $0.25 | $0.25 |
| 45 | Traffic control signs (643.0900) | DAY | 3,340 | $2.85 | $2.85 | $2.85 |
| 46 | Traffic control signs fixed message (643.1000) | SF | 36 | $11.10 | $11.10 | $11.10 |
| 47 | Traffic control (643.5000) | EACH | 1 | $3,300.00 | $3,300.00 | $3,300.00 |
| 48 | Geotextile type HR (645.0120) | SY | 162 | $5.00 | $8.00 | $11.35 |
| 49 | Marking line epoxy 6-inch (646.2020) | LF | 8,240 | $1.50 | $1.50 | $1.50 |
| 50 | Construction staking subgrade (650.4500) | LF | 896 | $0.01 | $0.01 | $0.01 |
| 51 | Construction staking base (650.5000) | LF | 896 | $1.25 | $1.25 | $1.25 |
| 52 | Construction staking pipe culverts (650.6000) | EACH | 8 | $550.00 | $550.00 | $550.00 |
| 53 | Construction staking resurfacing reference (650.8000) | LF | 1,209 | $1.25 | $1.25 | $1.25 |
| 54 | Construction staking supplemental control (project) 01. 1009-43-38 (650.9911) | EACH | 1 | $2,750.00 | $2,750.00 | $2,750.00 |
| 55 | Construction staking slope stakes (650.9920) | LF | 896 | $1.60 | $1.60 | $1.60 |
| 56 | Sawing asphalt (690.0150) | LF | 370 | $2.00 | $4.85 | $2.00 |
| 57 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 58 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 59 | Special 01. sand bags (SPV.0060) | EACH | 100 | $16.00 | $16.00 | $25.00 |
| 60 | Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 43X68-in (SPV.0090) | LF | 32 | $638.53 | $836.00 | $752.28 |
| 61 | Special 02. grading and shaping ditch (SPV.0090) | LF | 920 | $14.62 | $20.00 | $8.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.