WisDOT contract 20250610010 bid tabulation
Appleton - De Pere; Salt Storage Facility (NON HWY, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on June 10, 2025, Outagamie. 3 bids received; low bid $4,251,180 by Michels Road & Stone, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 42
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Michels Road & Stone, Inc. | $4,251,180 | Low |
| 2 | Vinton Construction Company | $4,411,516 | +4.0% |
| 3 | Hoffman Construction Company | $4,649,055 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Michels Road & Stone, Inc. | 2. Vinton Construction Company | 3. Hoffman Construction Company |
|---|---|---|---|---|---|---|
| 1 | Excavation common (205.0100) | CY | 66,607 | $8.30 | $13.69 | $20.00 |
| 2 | Finishing roadway (project) 01. 1130-65-88 (213.0100) | EACH | 1 | $5,500.00 | $5,000.00 | $100.00 |
| 3 | Base aggregate dense 3/4-inch (305.0110) | TON | 98 | $61.00 | $60.00 | $50.00 |
| 4 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 7,886 | $12.00 | $17.21 | $0.05 |
| 5 | Select crushed material (312.0110) | TON | 8,886 | $12.00 | $16.64 | $0.05 |
| 6 | Tack coat (455.0605) | GAL | 192 | $12.50 | $12.50 | $12.50 |
| 7 | Asphaltic surface (465.0105) | TON | 1,070 | $109.60 | $109.60 | $109.60 |
| 8 | Riprap light (606.0100) | CY | 2.10 | $275.00 | $250.00 | $500.00 |
| 9 | Storm sewer pipe composite 8-inch (608.6008) | LF | 285 | $103.00 | $67.14 | $60.00 |
| 10 | Storm sewer pipe composite 10- inch (608.6010) | LF | 254 | $102.00 | $89.27 | $60.00 |
| 11 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 153 | $38.70 | $31.80 | $20.00 |
| 12 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 462 | $27.80 | $13.81 | $10.00 |
| 13 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 3 | $750.00 | $498.54 | $500.00 |
| 14 | Maintenance and repair of haul roads (project) 01. 1130-65-88 (618.0100) | EACH | 1 | $1.00 | $0.01 | $100.00 |
| 15 | Mobilization (619.1000) | EACH | 1 | $215,392 | $237,500 | $290,753 |
| 16 | Water (624.0100) | MGAL | 76 | $65.00 | $30.00 | $100.00 |
| 17 | Salvaged topsoil (625.0500) | SY | 7,890 | $1.60 | $0.01 | $2.00 |
| 18 | Silt fence (628.1504) | LF | 375 | $4.00 | $4.00 | $4.00 |
| 19 | Silt fence maintenance (628.1520) | LF | 750 | $0.01 | $0.01 | $0.01 |
| 20 | Mobilizations erosion control (628.1905) | EACH | 2 | $250.00 | $250.00 | $250.00 |
| 21 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $1.00 | $1.00 | $1.00 |
| 22 | Erosion mat class I type B (628.2004) | SY | 13,255 | $1.25 | $1.25 | $1.25 |
| 23 | Temporary ditch checks (628.7504) | LF | 111 | $6.15 | $6.15 | $6.15 |
| 24 | Tracking pads (628.7560) | EACH | 1 | $1,200.00 | $2,500.00 | $100.00 |
| 25 | Rock bags (628.7570) | EACH | 15 | $25.00 | $25.00 | $25.00 |
| 26 | Fertilizer type B (629.0210) | CWT | 6 | $150.00 | $150.00 | $150.00 |
| 27 | Seeding mixture no. 30 (630.0130) | LB | 415 | $10.00 | $10.00 | $10.00 |
| 28 | Seeding temporary (630.0200) | LB | 471 | $2.00 | $2.00 | $2.00 |
| 29 | Seeding borrow pit (630.0300) | LB | 325 | $2.00 | $2.00 | $2.00 |
| 30 | Seed water (630.0500) | MGAL | 388 | $1.00 | $1.00 | $1.00 |
| 31 | Traffic control signs (643.0900) | DAY | 1,782 | $1.00 | $1.00 | $1.00 |
| 32 | Traffic control (643.5000) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 33 | Geotextile type R (645.0130) | SY | 21 | $10.00 | $10.00 | $30.00 |
| 34 | Sawing asphalt (690.0150) | LF | 375 | $2.25 | $4.00 | $2.20 |
| 35 | Special 01. drainage blanket (SPV.0035) | CY | 3,750 | $24.50 | $36.88 | $35.00 |
| 36 | Special 01. construction staking survey project 1130-65-88 (SPV.0060) | EACH | 1 | $16,401 | $16,401 | $16,401 |
| 37 | Special 02. precast concrete salt storage building (SPV.0060) | EACH | 1 | $2,491,193 | $2,362,000 | $2,423,808 |
| 38 | Special 03. settlement gauges (SPV.0060) | EACH | 5 | $4,043.00 | $4,500.00 | $3,680.00 |
| 39 | Special 04. vibrating wire piezometer instrumentation system (SPV.0060) | EACH | 1 | $12,781 | $15,000 | $11,000 |
| 40 | Special 01. fence temporary 6-foot (SPV.0090) | LF | 300 | $24.00 | $24.00 | $24.00 |
| 41 | Special 02. prefabricated vertical drains (SPV.0090) | LF | 53,000 | $0.20 | $0.68 | $0.68 |
| 42 | Special 03. prebored prefabricated vertical drains (SPV.0090) | LF | 159,000 | $2.35 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.