| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $800.00 | $815.00 |
| 2 | Removing structure (structure) 01. sta 242+40 - cattle pass (203.0220) | EACH | 1 | $837.50 | $850.00 |
| 3 | Removing structure (structure) 02. sta 245+42 - cattle pass (203.0220) | EACH | 1 | $880.00 | $900.00 |
| 4 | Removing structure (structure) 03. sta 260+82 - cattle pass (203.0220) | EACH | 1 | $875.00 | $900.00 |
| 5 | Removing structure (structure) 04. sta 270+10 - cattle pass (203.0220) | EACH | 1 | $875.00 | $900.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 895 | $2.00 | $2.10 |
| 7 | Removing asphaltic surface (204.0110) | SY | 225 | $2.00 | $2.10 |
| 8 | Removing asphaltic surface butt joints (204.0115) | SY | 230 | $27.90 | $9.50 |
| 9 | Removing asphaltic surface milling (204.0120) | SY | 88,000 | $1.95 | $1.91 |
| 10 | Excavation common (205.0100) | CY | 2,550 | $17.60 | $17.80 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 4085-67-71 (211.0101) | EACH | 1 | $15,945 | $8,900.00 |
| 12 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 431 | $59.90 | $55.25 |
| 13 | Finishing roadway (project) 01. 4085-67-71 (213.0100) | EACH | 1 | $2,950.00 | $4,860.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,180 | $23.30 | $28.50 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,050 | $16.25 | $16.45 |
| 16 | HMA cold weather paving (450.4000) | TON | 5,000 | $0.01 | $0.01 |
| 17 | Tack coat (455.0605) | GAL | 11,610 | $3.10 | $2.40 |
| 18 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,810.00 | $3,441.00 |
| 19 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,420.00 | $2,668.00 |
| 20 | Incentive density PWL HMA pavement (460.2005) | DOL | 12,650 | $1.00 | $1.00 |
| 21 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 9,650 | $1.00 | $1.00 |
| 22 | Incentive air voids HMA pavement (460.2010) | DOL | 20,000 | $1.00 | $1.00 |
| 23 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 20,000 | $68.40 | $81.20 |
| 24 | Asphaltic surface (465.0105) | TON | 410 | $119.40 | $212.10 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 63 | $194.50 | $212.10 |
| 26 | Asphaltic rumble strips, shoulder (465.0520) | LF | 38,180 | $0.32 | $0.30 |
| 27 | Asphaltic rumble strips, centerline (465.0560) | LF | 20,400 | $0.30 | $0.30 |
| 28 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 160 | $145.15 | $147.00 |
| 29 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 80 | $197.24 | $200.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $2,064.96 | $2,090.00 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,650.25 | $2,700.00 |
| 32 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $4,437.16 | $4,500.00 |
| 33 | Maintenance and repair of haul roads (project) 01. 4085-67-71 (618.0100) | EACH | 1 | $10.00 | $1.00 |
| 34 | Mobilization (619.1000) | EACH | 1 | $89,250 | $63,000 |
| 35 | Water (624.0100) | MGAL | 59 | $50.00 | $100.00 |
| 36 | Salvaged topsoil (625.0500) | SY | 2,195 | $3.40 | $3.50 |
| 37 | Silt fence (628.1504) | LF | 115 | $4.29 | $3.50 |
| 38 | Silt fence maintenance (628.1520) | LF | 115 | $0.01 | $0.10 |
| 39 | Mobilizations erosion control (628.1905) | EACH | 3 | $410.00 | $200.00 |
| 40 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $10.00 | $300.00 |
| 41 | Erosion mat urban class I type A (628.2006) | SY | 2,195 | $2.45 | $2.50 |
| 42 | Culvert pipe checks (628.7555) | EACH | 35 | $19.00 | $17.00 |
| 43 | Rock bags (628.7570) | EACH | 115 | $11.00 | $15.00 |
| 44 | Fertilizer type B (629.0210) | CWT | 1.40 | $105.00 | $150.00 |
| 45 | Seeding mixture no. 20 (630.0120) | LB | 100 | $8.35 | $9.00 |
| 46 | Seed water (630.0500) | MGAL | 49 | $9.10 | $30.00 |
| 47 | Markers culvert end (633.5200) | EACH | 8 | $60.00 | $75.00 |
| 48 | Field office type B (642.5001) | EACH | 1 | $2,450.00 | $12,438 |
| 49 | Traffic control drums (643.0300) | DAY | 70 | $2.26 | $2.30 |
| 50 | Traffic control barricades type III (643.0420) | DAY | 158 | $2.26 | $2.30 |
| 51 | Traffic control warning lights type A (643.0705) | DAY | 276 | $0.62 | $0.65 |
| 52 | Traffic control signs (643.0900) | DAY | 2,704 | $0.97 | $1.00 |
| 53 | Traffic control covering signs type II (643.0920) | EACH | 6 | $150.95 | $152.45 |
| 54 | Traffic control signs fixed message (643.1000) | SF | 48.50 | $38.17 | $38.55 |
| 55 | Traffic control signs PCMS (643.1050) | DAY | 28 | $76.58 | $77.35 |
| 56 | Temporary marking line paint 6- inch (643.3165) | LF | 179,700 | $0.24 | $0.25 |
| 57 | Traffic control (643.5000) | EACH | 1 | $11,173 | $11,300 |
| 58 | Marking line epoxy 4-inch (646.1020) | LF | 1,070 | $0.50 | $0.50 |
| 59 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 64,150 | $1.30 | $1.33 |
| 60 | Marking stop line epoxy 18-inch (646.6120) | LF | 77 | $18.25 | $18.45 |
| 61 | Cold weather marking epoxy 6-inch (646.6466) | LF | 16,310 | $0.01 | $0.45 |
| 62 | Marking diagonal epoxy 12-inch (646.7120) | LF | 76 | $12.50 | $12.65 |
| 63 | Construction staking pipe culverts (650.6000) | EACH | 4 | $200.00 | $125.00 |
| 64 | Construction staking resurfacing reference (650.8000) | LF | 24,113 | $0.08 | $0.15 |
| 65 | Construction staking supplemental control (project) 01. 4085-67-71 (650.9911) | EACH | 1 | $10.00 | $2,400.00 |
| 66 | Construction staking slope stakes (650.9920) | LF | 153 | $1.70 | $3.00 |
| 67 | Sawing asphalt (690.0150) | LF | 60 | $2.50 | $2.50 |
| 68 | Sawing concrete (690.0250) | LF | 240 | $2.95 | $2.95 |
| 69 | Incentive iri ride (740.0440) | DOL | 36,544 | $1.00 | $1.00 |
| 70 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 71 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 |
| 72 | Special 01. foundation backfill (SPV.0035) | CY | 1,780 | $29.60 | $29.90 |
| 73 | Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 38X60-in (SPV.0090) | LF | 72 | $413.91 | $419.00 |