| 1 | Clearing (201.0105) | STA | 3 | $757.58 | $1,477.00 |
| 2 | Clearing (201.0120) | ID | 38 | $50.51 | $26.38 |
| 3 | Grubbing (201.0205) | STA | 3 | $227.27 | $422.00 |
| 4 | Grubbing (201.0220) | ID | 38 | $22.73 | $5.28 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 2 | $250.00 | $250.00 |
| 6 | Removing structure (structure) 01. R-51-80 (203.0220) | EACH | 1 | $4,200.00 | $4,200.00 |
| 7 | Removing structure (structure) 02. R-51-81 (203.0220) | EACH | 1 | $3,200.00 | $3,200.00 |
| 8 | Removing asphaltic surface (204.0110) | SY | 540 | $6.50 | $6.50 |
| 9 | Removing asphaltic surface butt joints (204.0115) | SY | 860 | $0.01 | $1.20 |
| 10 | Removing asphaltic surface milling (204.0120) | SY | 55,400 | $1.00 | $1.20 |
| 11 | Removing curb & gutter (204.0150) | LF | 958 | $6.50 | $6.50 |
| 12 | Removing concrete sidewalk (204.0155) | SY | 98 | $6.50 | $6.50 |
| 13 | Removing fence (204.0170) | LF | 210 | $2.95 | $2.95 |
| 14 | Removing (item description) 01. removing apron endwall for culvert pipe reinforced concrete 18-inch (204.9060.S) | EACH | 1 | $250.00 | $250.00 |
| 15 | Excavation common (205.0100) | CY | 2,266 | $31.00 | $31.00 |
| 16 | Backfill granular grade 2 (209.2100) | CY | 40 | $32.50 | $32.50 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 2430-07-70 (211.0101) | EACH | 1 | $5,765.00 | $11,500 |
| 18 | Finishing roadway (project) 01. 2430-07-70 (213.0100) | EACH | 1 | $2,400.00 | $2,500.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,960 | $20.73 | $26.35 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 540 | $43.00 | $43.00 |
| 21 | Drilled tie bars (416.0610) | EACH | 17 | $8.65 | $40.00 |
| 22 | Tack coat (455.0605) | GAL | 6,320 | $2.80 | $2.85 |
| 23 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $550.00 | $3,500.00 |
| 24 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $17,000 | $5,000.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 8,730 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 2,900 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 10,260 | $1.00 | $1.00 |
| 28 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 10,260 | $68.75 | $75.10 |
| 29 | Asphaltic surface (465.0105) | TON | 210 | $81.75 | $130.00 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 158 | $118.00 | $130.00 |
| 31 | Asphaltic flumes (465.0315) | SY | 20 | $26.50 | $35.00 |
| 32 | Asphaltic rumble strips, shoulder (465.0520) | LF | 22,200 | $0.18 | $0.36 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 11,100 | $0.38 | $0.36 |
| 34 | Cleaning culvert pipes (520.8700) | EACH | 1 | $1,400.00 | $1,800.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,400.00 | $1,400.00 |
| 36 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 87 | $170.00 | $170.00 |
| 37 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 60 | $265.00 | $265.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 4 | $1,750.00 | $1,750.00 |
| 39 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $2,700.00 | $2,700.00 |
| 40 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 10 | $52.81 | $120.00 |
| 41 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 10 | $57.66 | $120.00 |
| 42 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 934 | $25.60 | $28.75 |
| 43 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 100 | $60.92 | $56.00 |
| 44 | Concrete sidewalk 5-inch (602.0410) | SF | 877 | $14.88 | $11.25 |
| 45 | Curb ramp detectable warning field yellow (602.0505) | SF | 30 | $35.17 | $55.00 |
| 46 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 14 | $52.75 | $65.00 |
| 47 | Riprap medium (606.0200) | CY | 12 | $230.00 | $230.00 |
| 48 | Riprap heavy (606.0300) | CY | 57 | $230.00 | $230.00 |
| 49 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 651 | $103.00 | $103.00 |
| 50 | Inlet covers type C (611.0612) | EACH | 1 | $1,175.00 | $1,175.00 |
| 51 | Inlet covers type H (611.0624) | EACH | 6 | $1,650.00 | $1,650.00 |
| 52 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $3,200.00 | $3,200.00 |
| 53 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,200.00 | $3,200.00 |
| 54 | Inlets 2X3-FT (611.3230) | EACH | 5 | $2,850.00 | $2,850.00 |
| 55 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 150 | $15.00 | $15.00 |
| 56 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 150 | $16.00 | $16.00 |
| 57 | Pipe underdrain unperforated 8- inch (612.0208) | LF | 150 | $17.00 | $17.00 |
| 58 | Drain tile exploration (612.0700) | LF | 1,500 | $4.00 | $4.00 |
| 59 | Fence safety (616.0700.S) | LF | 630 | $3.43 | $3.43 |
| 60 | Maintenance and repair of haul roads (project) 01. 2430-07-70 (618.0100) | EACH | 1 | $0.01 | $500.00 |
| 61 | Mobilization (619.1000) | EACH | 1 | $24,000 | $79,833 |
| 62 | Water (624.0100) | MGAL | 26 | $1.00 | $55.00 |
| 63 | Topsoil (625.0100) | SY | 1,160 | $10.50 | $10.50 |
| 64 | Salvaged topsoil (625.0500) | SY | 7,860 | $3.25 | $3.25 |
| 65 | Silt fence (628.1504) | LF | 3,500 | $1.71 | $1.71 |
| 66 | Silt fence maintenance (628.1520) | LF | 3,500 | $0.05 | $0.05 |
| 67 | Silt fence heavy duty (628.1530.S) | LF | 25 | $16.75 | $16.75 |
| 68 | Silt fence heavy duty maintenance (628.1535.S) | LF | 25 | $5.00 | $5.00 |
| 69 | Mobilizations erosion control (628.1905) | EACH | 5 | $20.00 | $20.00 |
| 70 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $20.00 | $20.00 |
| 71 | Erosion mat urban class I type A (628.2006) | SY | 9,000 | $1.65 | $1.65 |
| 72 | Inlet protection type D (628.7020) | EACH | 6 | $115.00 | $115.00 |
| 73 | Temporary ditch checks (628.7504) | LF | 168 | $6.45 | $6.45 |
| 74 | Culvert pipe checks (628.7555) | EACH | 30 | $60.00 | $60.00 |
| 75 | Tracking pads (628.7560) | EACH | 3 | $1,200.00 | $1.00 |
| 76 | Fertilizer type B (629.0210) | CWT | 6.20 | $115.00 | $115.00 |
| 77 | Seeding mixture no. 30 (630.0130) | LB | 414 | $9.15 | $9.15 |
| 78 | Seeding temporary (630.0200) | LB | 248 | $5.00 | $5.00 |
| 79 | Seed water (630.0500) | MGAL | 208 | $15.00 | $15.00 |
| 80 | Markers culvert end (633.5200) | EACH | 7 | $75.00 | $75.00 |
| 81 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 26 | $155.00 | $155.00 |
| 82 | Posts wood 4X6-inch X 22-FT (634.0622) | EACH | 3 | $180.00 | $180.00 |
| 83 | Signs type II reflective H (637.2210) | SF | 141 | $19.15 | $19.15 |
| 84 | Signs type II reflective F (637.2230) | SF | 110.75 | $19.15 | $19.15 |
| 85 | Removing signs type II (638.2602) | EACH | 26 | $30.00 | $30.00 |
| 86 | Removing small sign supports (638.3000) | EACH | 26 | $30.00 | $30.00 |
| 87 | Field office type B (642.5001) | EACH | 1 | $7,000.00 | $3,999.00 |
| 88 | Traffic control drums (643.0300) | DAY | 2,330 | $0.40 | $0.20 |
| 89 | Traffic control barricades type III (643.0420) | DAY | 598 | $0.88 | $1.00 |
| 90 | Traffic control warning lights type A (643.0705) | DAY | 1,196 | $0.19 | $0.15 |
| 91 | Traffic control signs (643.0900) | DAY | 7,784 | $0.50 | $0.52 |
| 92 | Traffic control covering signs type II (643.0920) | EACH | 4 | $66.00 | $50.00 |
| 93 | Traffic control signs fixed message (643.1000) | SF | 216 | $19.00 | $18.00 |
| 94 | Traffic control signs PCMS (643.1050) | DAY | 14 | $40.00 | $35.00 |
| 95 | Temporary marking raised pavement marker type II (643.3770) | EACH | 577 | $9.00 | $7.00 |
| 96 | Traffic control (643.5000) | EACH | 1 | $9,850.00 | $9,797.97 |
| 97 | Geotextile type HR (645.0120) | SY | 67 | $13.00 | $13.00 |
| 98 | Marking line epoxy 4-inch (646.1020) | LF | 100 | $5.05 | $5.00 |
| 99 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 44,000 | $1.25 | $1.24 |
| 100 | Marking arrow epoxy (646.5020) | EACH | 1 | $353.54 | $350.00 |
| 101 | Marking stop line epoxy 18-inch (646.6120) | LF | 97 | $14.14 | $14.00 |
| 102 | Locating no-passing zones (648.0100) | MI | 2.73 | $505.05 | $500.00 |
| 103 | Construction staking storm sewer (650.4000) | EACH | 8 | $120.00 | $120.00 |
| 104 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 954 | $2.50 | $2.50 |
| 105 | Construction staking pipe culverts (650.6000) | EACH | 3 | $130.00 | $130.00 |
| 106 | Construction staking resurfacing reference (650.8000) | LF | 14,399 | $0.25 | $0.25 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 4 | $200.00 | $200.00 |
| 108 | Construction staking supplemental control (project) 01. 2430-07-70 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 |
| 109 | Construction staking slope stakes (650.9920) | LF | 2,025 | $0.75 | $0.75 |
| 110 | Sawing asphalt (690.0150) | LF | 1,078 | $1.25 | $1.25 |
| 111 | Sawing concrete (690.0250) | LF | 259 | $2.25 | $2.25 |
| 112 | Incentive iri ride (740.0440) | DOL | 5,480 | $1.00 | $1.00 |
| 113 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 250 | $5.00 | $5.00 |
| 114 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 900 | $5.00 | $5.00 |
| 115 | Special 01. utility line opening (ulo) (SPV.0060) | EACH | 5 | $750.00 | $750.00 |
| 116 | Special 01. asphaltic repair (SPV.0195) | TON | 510 | $102.00 | $110.00 |