WisDOT contract 20250909015 bid tabulation
Ser Tree Clearing Project; Various Ser Counties (VAR HWY, SE Wide SER Tree Clearing). Let by Wisconsin DOT on September 9, 2025, Southeast Region Wide. 4 bids received; low bid $999,010 by Interstate Tree Landscaping.
- Owner
- Wisconsin DOT
- Letting
- 09 SEP 2025
- Pay items
- 21
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Interstate Tree Landscaping | $999,010 | Low |
| 2 | Highway Landscapers, Inc. | $1,096,447 | +10% |
| 3 | Graber Construction & Excavation Inc | $1,171,840 | +17% |
| 4 | Homer Tree Service, Inc. | $1,186,547 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Interstate Tree Landscaping | 2. Highway Landscapers, Inc. | 3. Graber Construction & Excavation Inc | 4. Homer Tree Service, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 454 | $1,572.00 | $1,375.00 | $1,795.00 | $1,799.00 |
| 2 | Clearing (201.0120) | ID | 655 | $77.00 | $110.00 | $60.00 | $55.00 |
| 3 | Finishing roadway (project) 01. 3742-03-70 (213.0100) | EACH | 1 | $1.00 | $500.00 | $4,000.00 | $500.00 |
| 4 | Maintenance and repair of haul roads (project) 01. 3742-03-70 (618.0100) | EACH | 1 | $1.00 | $250.00 | $990.00 | $1.00 |
| 5 | Silt fence (628.1504) | LF | 400 | $3.00 | $4.00 | $3.30 | $3.00 |
| 6 | Silt fence maintenance (628.1520) | LF | 400 | $1.00 | $0.01 | $0.50 | $0.50 |
| 7 | Mobilizations erosion control (628.1905) | EACH | 15 | $300.00 | $500.00 | $440.00 | $350.00 |
| 8 | Mobilizations emergency erosion control (628.1910) | EACH | 15 | $500.00 | $1.00 | $160.00 | $500.00 |
| 9 | Temporary ditch checks (628.7504) | LF | 300 | $3.41 | $7.00 | $5.50 | $5.00 |
| 10 | Traffic control signs PCMS (643.1050) | DAY | 200 | $45.00 | $150.00 | $49.50 | $40.00 |
| 11 | Special 01. traffic control - lane closure (SPV.0045) | DAY | 16 | $1,150.00 | $2,900.00 | $2,500.00 | $2,900.00 |
| 12 | Special 02. traffic control - shoulder closure (SPV.0045) | DAY | 78 | $775.00 | $400.00 | $1,100.00 | $1,100.00 |
| 13 | Special 03. traffic control - pedestrian accommodation (SPV.0045) | DAY | 12 | $550.00 | $5,000.00 | $700.00 | $1,050.00 |
| 14 | Special 04. traffic control - no parking signs (SPV.0045) | DAY | 14 | $110.00 | $150.00 | $50.00 | $975.00 |
| 15 | Special 05. traffic control - trail closure (SPV.0045) | DAY | 3 | $924.00 | $976.00 | $50.00 | $975.00 |
| 16 | Special 01. frozen ground erosion control (SPV.0060) | EACH | 6 | $250.00 | $250.00 | $4,500.00 | $4,500.00 |
| 17 | Special 02. semi-frozen ground erosion control (SPV.0060) | EACH | 7 | $250.00 | $250.00 | $2,500.00 | $4,250.00 |
| 18 | Special 03. thawed ground erosion control (SPV.0060) | EACH | 7 | $1,750.00 | $250.00 | $2,500.00 | $4,000.00 |
| 19 | Special 04. semi-permanent restoration (SPV.0060) | EACH | 10 | $4,500.00 | $250.00 | $2,500.00 | $4,000.00 |
| 20 | Special 05. site mobilization (SPV.0060) | EACH | 15 | $4,000.00 | $13,750 | $4,500.00 | $1,500.00 |
| 21 | Special 01. staked wattles (SPV.0090) | LF | 200 | $5.00 | $9.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.