WisDOT contract 20250909017 bid tabulation

Peshtigo - Marinette; Maple Street - CTH T (CTH B, Marinette County Peshtigo - Marinette). Let by Wisconsin DOT on September 9, 2025, Marinette. 1 bid received; low bid $593,523 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
09 SEP 2025
Pay items
27
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$593,523Low
WisDOT contract 20250909017: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc
1Removing asphaltic surface (204.0110)SY325$26.40
2Prepare foundation for asphaltic shoulders (211.0400)STA59$177.00
3Finishing roadway (project) 01. 9259-00-70 (213.0100)EACH1$2,000.00
4Base aggregate dense 3/4-inch (305.0110)TON50$37.00
5Shaping shoulders (305.0500)STA59$387.50
6Tack coat (455.0605)GAL120$12.20
7Asphaltic surface (465.0105)TON500$133.70
8Asphaltic rumble strips, edge line (465.0540)LF4,130$2.95
9Asphaltic rumble strips, centerline sinusoidal (465.0565)LF2,050$0.75
10Mobilization (619.1000)EACH1$253,670
11Posts wood 4X6-inch X 16-FT (634.0616)EACH44$86.00
12Posts wood 4X6-inch X 18-FT (634.0618)EACH42$89.00
13Signs type II reflective F (637.2230)SF512.34$23.95
14Removing signs type II (638.2602)EACH30$40.00
15Removing small sign supports (638.3000)EACH28$40.00
16Field office type B (642.5001)EACH1$6,130.00
17Traffic control drums (643.0300)DAY70$2.50
18Traffic control signs (643.0900)DAY1,360$0.75
19Traffic control signs PCMS (643.1050)DAY14$25.00
20Traffic control (643.5000)EACH1$6,250.00
21Marking line grooved wet ref epoxy 6-inch (646.2040)LF128,210$1.26
22Locating no-passing zones (648.0100)MI7.39$472.76
23Construction staking resurfacing reference (650.8000)LF39,038$0.06
24Construction staking supplemental control (project) 01. 9259-00-70 (650.9911)EACH1$1.00
25Sawing asphalt (690.0150)LF5,830$1.10
26On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS150$5.00
27On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00
WisDOT contract 20250909017: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy