WisDOT contract 20251014001 bid tabulation

Sw Region Pavement Marking; Stn Locations Per Annual Plan (VAR HWY, Southwest Region Wide SW Region Pavement Marking). Let by Wisconsin DOT on October 14, 2025, Southwest Region Wide. 2 bids received.

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
18
Data through
10 NOV 2026

1 of the 2 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
2Century Traffic, LLC$3,454,030+10%
WisDOT contract 20251014001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Century Traffic, LLC
1Mobilization (619.1000)EACH1$15,115
2Marking line epoxy 6-inch (646.2020)LF5,036,448$0.47
3Marking line epoxy 10-inch (646.4020)LF262,299$0.87
4Marking arrow epoxy (646.5020)EACH732$260.00
5Marking word epoxy (646.5120)EACH295$270.00
6Marking symbol epoxy (646.5220)EACH13$250.00
7Marking railroad crossing epoxy (646.5320)EACH6$2,465.00
8Marking aerial enforcement bar epoxy (646.5420)EACH20$127.00
9Marking stop line epoxy 18-inch (646.6120)LF10,794$16.00
10Marking dotted extension epoxy 18-inch (646.6320)LF1,744$19.15
11Marking diagonal epoxy 12-inch (646.7120)LF1,518$8.50
12Marking crosswalk epoxy transverse line 6-inch (646.7420)LF9,942$10.30
13Marking crosswalk epoxy block style 24-inch (646.7520)LF1,668$30.50
14Marking curb epoxy (646.8120)LF425$10.00
15Marking parking stall epoxy (646.8320)LF16,106$2.85
16Marking removal line wide (646.9200)LF16$3.00
17Special 01. traffic control (SPV.0060)EACH1$15,000
18Special 01. marking line black epoxy 6-in (SPV.0090)LF256,784$0.45
WisDOT contract 20251014001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy