| 1 | Grubbing (201.0205) | STA | 14 | $338.38 | $550.10 |
| 2 | Grubbing (201.0220) | ID | 6 | $50.51 | $8.87 |
| 3 | Removing concrete pavement butt joints (204.0105) | SY | 3,032 | $25.00 | $15.56 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 3,024 | $40.00 | $14.62 |
| 5 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 44,557 | $4.86 | $2.00 |
| 6 | Borrow (208.0100) | CY | 333 | $10.00 | $43.45 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 1011-01-70 (211.0101) | EACH | 1 | $10,000 | $4,219.00 |
| 8 | Finishing roadway (project) 01. 1011-01-70 (213.0100) | EACH | 1 | $150.00 | $4,214.84 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 6,340 | $23.00 | $21.84 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 214 | $35.00 | $30.09 |
| 11 | Removing pavement for base patching (390.0100) | CY | 1,251 | $218.59 | $216.40 |
| 12 | Base patching concrete shes (390.0405) | CY | 1,251 | $267.42 | $264.75 |
| 13 | Drilled tie bars (416.0610) | EACH | 2,445 | $13.26 | $13.13 |
| 14 | Drilled dowel bars (416.0620) | EACH | 1,914 | $16.76 | $16.59 |
| 15 | Tack coat (455.0605) | GAL | 36,755 | $1.00 | $3.63 |
| 16 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $150.00 | $3,500.00 |
| 17 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $150.00 | $3,500.00 |
| 18 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 2 | $150.00 | $3,500.00 |
| 19 | HMA pavement test strip density (460.0120.S) | EACH | 2 | $150.00 | $3,500.00 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 40,000 | $1.00 | $1.00 |
| 21 | Incentive density PWL HMA pavement (460.2005) | DOL | 20,030 | $1.00 | $1.00 |
| 22 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 17,880 | $1.00 | $1.00 |
| 23 | Incentive air voids HMA pavement (460.2010) | DOL | 31,400 | $1.00 | $1.00 |
| 24 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 32,336 | $74.00 | $85.52 |
| 25 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 34,305 | $100.00 | $95.35 |
| 26 | Material transfer vehicle (460.9000.S) | EACH | 1 | $1.00 | $0.01 |
| 27 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 86,690 | $0.22 | $0.29 |
| 28 | Adjusting inlet covers (611.8115) | EACH | 31 | $225.00 | $267.76 |
| 29 | MGS guardrail 3 (614.2300) | LF | 450 | $29.00 | $29.00 |
| 30 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $4,300.00 | $4,300.00 |
| 31 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $2,750.00 | $2,750.00 |
| 32 | Maintenance and repair of haul roads (project) 01. 1011-01-70 (618.0100) | EACH | 1 | $150.00 | $0.01 |
| 33 | Mobilization (619.1000) | EACH | 1 | $20,000 | $100,000 |
| 34 | Water (624.0100) | MGAL | 98.60 | $0.01 | $0.01 |
| 35 | Salvaged topsoil (625.0500) | SY | 4,144 | $3.60 | $4.89 |
| 36 | Silt fence (628.1504) | LF | 13,566 | $1.90 | $1.90 |
| 37 | Silt fence maintenance (628.1520) | LF | 13,566 | $0.01 | $0.01 |
| 38 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 |
| 39 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $100.00 |
| 40 | Erosion mat class I type A (628.2002) | SY | 8,820 | $1.10 | $1.10 |
| 41 | Inlet protection type B (628.7010) | EACH | 28 | $55.00 | $55.00 |
| 42 | Inlet protection type D (628.7020) | EACH | 7 | $120.00 | $120.00 |
| 43 | Fertilizer type B (629.0210) | CWT | 16.20 | $90.00 | $90.00 |
| 44 | Seeding mixture no. 20 (630.0120) | LB | 449 | $8.95 | $8.95 |
| 45 | Seed water (630.0500) | MGAL | 139.40 | $10.00 | $10.00 |
| 46 | Field office type C (642.5201) | EACH | 1 | $100.00 | $9,750.00 |
| 47 | Traffic control drums (643.0300) | DAY | 83,714 | $0.25 | $0.25 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 6,302 | $0.65 | $0.65 |
| 49 | Traffic control warning lights type A (643.0705) | DAY | 12,604 | $0.14 | $0.14 |
| 50 | Traffic control warning lights type C (643.0715) | DAY | 15,507 | $0.16 | $0.16 |
| 51 | Traffic control arrow boards (643.0800) | DAY | 374 | $11.25 | $11.25 |
| 52 | Traffic control signs (643.0900) | DAY | 8,555 | $0.30 | $0.30 |
| 53 | Traffic control covering signs type II (643.0920) | EACH | 60 | $32.50 | $32.50 |
| 54 | Traffic control signs PCMS (643.1050) | DAY | 230 | $24.25 | $24.25 |
| 55 | Basic traffic queue warning system (643.1205.S) | DAY | 177 | $145.00 | $145.00 |
| 56 | Temporary marking line paint 6- inch (643.3165) | LF | 222,843 | $0.18 | $0.18 |
| 57 | Temporary marking line paint 10- inch (643.3265) | LF | 7,833 | $0.42 | $0.42 |
| 58 | Traffic control (643.5000) | EACH | 1 | $76,800 | $76,800 |
| 59 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 22,279 | $0.80 | $0.80 |
| 60 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 111,422 | $1.24 | $1.24 |
| 61 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,917 | $2.75 | $2.75 |
| 62 | Marking chevron epoxy 24-inch (646.7220) | LF | 287 | $23.40 | $23.40 |
| 63 | Construction staking subgrade (650.4500) | LF | 614 | $0.01 | $0.01 |
| 64 | Construction staking base (650.5000) | LF | 614 | $0.70 | $1.00 |
| 65 | Construction staking resurfacing reference (650.8000) | LF | 44,557 | $0.17 | $0.12 |
| 66 | Construction staking supplemental control (project) 01. 1011-01-70 (650.9911) | EACH | 1 | $900.00 | $1,000.00 |
| 67 | Construction staking slope stakes (650.9920) | LF | 44,557 | $0.25 | $0.44 |
| 68 | Sawing concrete (690.0250) | LF | 10,241 | $2.53 | $2.50 |
| 69 | Incentive iri ride (740.0440) | DOL | 50,660 | $1.00 | $1.00 |
| 70 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 6,480 | $5.00 | $5.00 |
| 71 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 |
| 72 | Special 01. removing barrier wall lip (SPV.0060) | EACH | 2 | $500.00 | $260.29 |
| 73 | Special 02. crash cushion noses cover chevron (SPV.0060) | EACH | 2 | $150.00 | $150.00 |
| 74 | Special 03. verify landmark reference monuments (SPV.0060) | EACH | 2 | $400.00 | $1,000.00 |
| 75 | Special 01. concrete joint and crack cleaning (SPV.0090) | LF | 11,151 | $6.00 | $16.12 |