WisDOT contract 20251014013 bid tabulation
STH 153 - STH 29; STH 153 to CTH P (CTH E, Marathon County STH 153 - STH 29). Let by Wisconsin DOT on October 14, 2025, Marathon. 1 bid received; low bid $943,510 by American Asphalt of Wisconsin.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 34
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Asphalt of Wisconsin | $943,510 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Asphalt of Wisconsin |
|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 500 | $9.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 490 | $22.77 |
| 3 | Prepare foundation for cir base layer (project) 01. 6668-00-70 (211.0700.S) | EACH | 1 | $1,828.25 |
| 4 | Base repair for cir layer (211.0800.S) | CY | 500 | $130.50 |
| 5 | Finishing roadway (project) 01. 6668-00-70 (213.0100) | EACH | 1 | $4,933.05 |
| 6 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,300 | $20.65 |
| 7 | Shaping shoulders (305.0500) | STA | 314 | $11.76 |
| 8 | Cir asphaltic base layer (327.1000.S) | SY | 41,760 | $3.59 |
| 9 | Tack coat (455.0605) | GAL | 2,200 | $4.42 |
| 10 | Asphalt stabilizing agent (455.0770.S) | TON | 140 | $350.00 |
| 11 | Incentive density HMA pavement (460.2000) | DOL | 3,270 | $1.00 |
| 12 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 5,100 | $87.46 |
| 13 | Asphaltic surface driveways and field entrances (465.0120) | TON | 50 | $237.28 |
| 14 | Maintenance and repair of haul roads (project) 01. 6668-00-70 (618.0100) | EACH | 1 | $10.00 |
| 15 | Mobilization (619.1000) | EACH | 1 | $77,075 |
| 16 | Landmark reference monuments (621.0100) | EACH | 12 | $5.00 |
| 17 | Water (624.0100) | MGAL | 35 | $50.00 |
| 18 | Fertilizer type B (629.0210) | CWT | 2.50 | $110.00 |
| 19 | Seeding mixture no. 20 (630.0120) | LB | 100 | $8.75 |
| 20 | Seed water (630.0500) | MGAL | 80 | $25.00 |
| 21 | Field office type B (642.5001) | EACH | 1 | $10,000 |
| 22 | Traffic control signs (643.0900) | DAY | 2,000 | $0.15 |
| 23 | Temporary marking line paint 6- inch (643.3165) | LF | 3,920 | $1.01 |
| 24 | Traffic control (643.5000) | EACH | 1 | $5,479.25 |
| 25 | Marking line epoxy 6-inch (646.2020) | LF | 31,300 | $0.57 |
| 26 | Marking line same day epoxy 6- inch (646.4720) | LF | 6,500 | $1.68 |
| 27 | Locating no-passing zones (648.0100) | MI | 2.97 | $628.06 |
| 28 | Construction staking resurfacing reference (650.8000) | LF | 15,660 | $0.15 |
| 29 | Construction staking supplemental control (project) 01. 6668-00-70 (650.9911) | EACH | 1 | $600.00 |
| 30 | Sawing asphalt (690.0150) | LF | 200 | $6.88 |
| 31 | Incentive iri ride (740.0440) | DOL | 11,846 | $1.00 |
| 32 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 |
| 33 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 |
| 34 | Special 01. reestablish section corner monument (SPV.0060) | EACH | 3 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.