| 1 | Clearing (201.0105) | STA | 15 | $1,221.35 |
| 2 | Grubbing (201.0205) | STA | 15 | $613.17 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 11 | $884.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 510 | $7.33 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 356 | $19.52 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 102,600 | $2.59 |
| 7 | Removing curb & gutter (204.0150) | LF | 260 | $7.50 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 104 | $12.50 |
| 9 | Removing guardrail (204.0165) | LF | 1,831 | $2.15 |
| 10 | Removing inlets (204.0220) | EACH | 2 | $750.00 |
| 11 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 220 | $20.00 |
| 12 | Abandoning inlets (204.0260) | EACH | 2 | $1,500.00 |
| 13 | Sealing pipes (204.0280) | EACH | 1 | $1,250.00 |
| 14 | Abandoning sewer (204.0291.S) | CY | 8 | $475.00 |
| 15 | Excavation common (205.0100) | CY | 250 | $23.01 |
| 16 | Borrow (208.0100) | CY | 1,750 | $24.82 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 8520-00-71 (211.0101) | EACH | 1 | $4,166.85 |
| 18 | Finishing roadway (project) 01. 8520-00-71 (213.0100) | EACH | 1 | $1,998.55 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,130 | $30.45 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 990 | $22.77 |
| 21 | Shaping shoulders (305.0500) | STA | 691 | $24.50 |
| 22 | Concrete pavement 6-inch (415.0060) | SY | 51 | $161.21 |
| 23 | Concrete pavement approach slab (415.0410) | SY | 80 | $310.85 |
| 24 | Tack coat (455.0605) | GAL | 14,370 | $2.44 |
| 25 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $4,626.70 |
| 26 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,220.00 |
| 27 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,530 | $1.00 |
| 28 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 23,940 | $1.00 |
| 29 | Incentive air voids HMA pavement (460.2010) | DOL | 18,690 | $1.00 |
| 30 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 18,690 | $95.28 |
| 31 | Material transfer vehicle (460.9000.S) | EACH | 1 | $43,200 |
| 32 | Asphaltic surface (465.0105) | TON | 478 | $108.86 |
| 33 | Asphaltic surface patching (465.0110) | TON | 150 | $138.63 |
| 34 | Asphaltic rumble strips, centerline (465.0560) | LF | 27,300 | $0.39 |
| 35 | Protective surface treatment (502.3200) | SY | 167 | $10.00 |
| 36 | Pigmented surface sealer reseal (502.3205) | SY | 31 | $50.00 |
| 37 | Pigmented surface sealer (502.3210) | SY | 6 | $20.00 |
| 38 | Preparation decks type 1 (509.0301) | SY | 100 | $150.00 |
| 39 | Preparation decks type 2 (509.0302) | SY | 50 | $150.00 |
| 40 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 163 | $40.00 |
| 41 | Concrete surface repair (509.1500) | SF | 50 | $180.00 |
| 42 | Full-depth deck repair (509.2000) | SY | 2 | $200.00 |
| 43 | Concrete masonry overlay decks (509.2500) | CY | 15 | $2,000.00 |
| 44 | Removing concrete masonry deck overlay (structure) 01. B-02-0009 (509.9005.S) | SY | 163 | $150.00 |
| 45 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 10 | $555.00 |
| 46 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 2 | $885.00 |
| 47 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 2 | $1,191.00 |
| 48 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 272 | $274.72 |
| 49 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 86 | $315.93 |
| 50 | Culvert pipe class III-A non-metal 36-inch (520.3436) | LF | 54 | $386.59 |
| 51 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 36 | $405.73 |
| 52 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 232 | $334.94 |
| 53 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,860.00 |
| 54 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,144.00 |
| 55 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 6 | $2,925.00 |
| 56 | Apron endwalls for culvert pipe aluminum 36-inch (525.0336) | EACH | 1 | $1,127.00 |
| 57 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 257 | $52.39 |
| 58 | Concrete curb pedestrian (601.0600) | LF | 20 | $45.13 |
| 59 | Concrete sidewalk 6-inch (602.0415) | SF | 325 | $15.20 |
| 60 | Curb ramp detectable warning field natural patina (602.0515) | SF | 20 | $60.32 |
| 61 | Concrete barrier temporary precast delivered (603.8000) | LF | 362.50 | $25.00 |
| 62 | Concrete barrier temporary precast installed (603.8125) | LF | 725 | $5.00 |
| 63 | Riprap medium (606.0200) | CY | 5 | $150.00 |
| 64 | Riprap heavy (606.0300) | CY | 7 | $150.00 |
| 65 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 152 | $295.24 |
| 66 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 115 | $253.19 |
| 67 | Catch basins 5-FT diameter (611.1005) | EACH | 2 | $6,500.00 |
| 68 | Salvaged inlet covers (611.9710) | EACH | 2 | $950.00 |
| 69 | Replacing guardrail posts and blocks (614.0950) | EACH | 8 | $100.00 |
| 70 | Replacing guardrail rail and hardware (614.0951) | LF | 12.50 | $75.00 |
| 71 | MGS guardrail 3 (614.2300) | LF | 312 | $29.50 |
| 72 | MGS guardrail 3 K (614.2330) | LF | 100 | $42.00 |
| 73 | MGS thrie beam transition (614.2500) | LF | 196.88 | $99.00 |
| 74 | MGS guardrail terminal eat (614.2610) | EACH | 5 | $4,005.50 |
| 75 | Maintenance and repair of haul roads (project) 01. 8520-00-71 (618.0100) | EACH | 1 | $1.00 |
| 76 | Mobilization (619.1000) | EACH | 1 | $221,220 |
| 77 | Water (624.0100) | MGAL | 11 | $100.73 |
| 78 | Salvaged topsoil (625.0500) | SY | 5,100 | $2.94 |
| 79 | Mulching (627.0200) | SY | 1,860 | $0.75 |
| 80 | Silt fence (628.1504) | LF | 1,380 | $2.75 |
| 81 | Silt fence maintenance (628.1520) | LF | 1,380 | $0.03 |
| 82 | Mobilizations erosion control (628.1905) | EACH | 2 | $501.00 |
| 83 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $502.00 |
| 84 | Erosion mat urban class I type B (628.2008) | SY | 3,250 | $2.85 |
| 85 | Fertilizer type B (629.0210) | CWT | 3 | $150.00 |
| 86 | Seeding mixture no. 10 (630.0110) | LB | 69 | $11.65 |
| 87 | Seed water (630.0500) | MGAL | 110 | $1.00 |
| 88 | Markers culvert end (633.5200) | EACH | 45 | $72.00 |
| 89 | Moving signs type II (638.2102) | EACH | 1 | $185.00 |
| 90 | Moving small sign supports (638.4000) | EACH | 1 | $185.00 |
| 91 | Field office type B (642.5001) | EACH | 1 | $11,636 |
| 92 | Traffic control drums (643.0300) | DAY | 360 | $1.00 |
| 93 | Traffic control barricades type III (643.0420) | DAY | 20 | $2.00 |
| 94 | Traffic control warning lights type C (643.0715) | DAY | 200 | $0.25 |
| 95 | Traffic control signs (643.0900) | DAY | 1,990 | $3.00 |
| 96 | Temporary marking line paint 6- inch (643.3165) | LF | 100,260 | $0.39 |
| 97 | Temporary marking stop line paint 18-inch (643.3805) | LF | 30 | $5.25 |
| 98 | Traffic control (643.5000) | EACH | 1 | $4,000.00 |
| 99 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 96,400 | $1.40 |
| 100 | Marking stop line epoxy 18-inch (646.6120) | LF | 31 | $35.00 |
| 101 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 72 | $15.00 |
| 102 | Marking removal line 4-inch (646.9000) | LF | 620 | $0.85 |
| 103 | Construction staking storm sewer (650.4000) | EACH | 1 | $1,500.00 |
| 104 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 257 | $8.00 |
| 105 | Construction staking pipe culverts (650.6000) | EACH | 11 | $450.00 |
| 106 | Construction staking resurfacing reference (650.8000) | LF | 30,000 | $0.11 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 2 | $650.00 |
| 108 | Construction staking sidewalk (project) 01. 8520-00-71 (650.9500) | EACH | 1 | $1,500.00 |
| 109 | Construction staking supplemental control (project) 01. 8520-00-71 (650.9911) | EACH | 1 | $1.00 |
| 110 | Temporary traffic signals for bridges (structure) 01. B-02-0009 (661.0101) | EACH | 1 | $11,200 |
| 111 | Sawing asphalt (690.0150) | LF | 1,800 | $5.39 |
| 112 | Sawing concrete (690.0250) | LF | 83 | $7.61 |
| 113 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 |
| 114 | Incentive iri ride (740.0440) | DOL | 22,670 | $1.00 |
| 115 | Special 01. MGS guardrail terminal eat TL-2 (SPV.0060) | EACH | 1 | $5,212.50 |
| 116 | Special 01. ditch cleaning (SPV.0090) | LF | 127 | $25.00 |
| 117 | Special 02. MGS guardrail thrie beam transition TL-2 (SPV.0090) | LF | 21.88 | $188.13 |