WisDOT contract 20251014028 bid tabulation

Stetsonville - STH 64; CTH O to STH 64 (CTH Q, Taylor County Stetsonville - STH 64). Let by Wisconsin DOT on October 14, 2025, Taylor. 1 bid received; low bid $1,318,392 by American Asphalt of Wisconsin.

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
40
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Asphalt of Wisconsin$1,318,392Low
WisDOT contract 20251014028: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Asphalt of Wisconsin
1Removing asphaltic surface (204.0110)SY240$4.60
2Removing asphaltic surface milling (204.0120)SY20,745$3.11
3Excavation common (205.0100)CY4,470$19.00
4Prepare foundation for asphaltic paving (project) 01. 8990-00-74 (211.0101)EACH1$16,710
5Finishing roadway (project) 01. 8990-00-74 (213.0100)EACH1$4,000.00
6Base aggregate dense 3/4-inch (305.0110)TON2,090$25.50
7Base aggregate dense 1 1/4-inch (305.0120)TON7,620$22.50
8Tack coat (455.0605)GAL1,225$5.28
9Incentive density HMA pavement (460.2000)DOL5,120$1.00
10HMA pavement 3 LT 58-28 S (460.5223)TON4,920$84.13
11HMA pavement 4 LT 58-34 S (460.5244)TON3,095$91.91
12Asphaltic surface driveways and field entrances (465.0120)TON40$199.38
13Asphaltic rumble strips, transverse (465.0580)SY150$135.51
14Maintenance and repair of haul roads (project) 01. 8890-00-74 (618.0100)EACH1$5.00
15Mobilization (619.1000)EACH1$116,507
16Water (624.0100)MGAL154$50.00
17Silt fence (628.1504)LF100$5.00
18Silt fence maintenance (628.1520)LF100$0.01
19Mobilizations erosion control (628.1905)EACH2$100.00
20Mobilizations emergency erosion control (628.1910)EACH1$100.00
21Fertilizer type B (629.0210)CWT4.20$120.00
22Seeding mixture no. 20 (630.0120)LB308$8.50
23Seed water (630.0500)MGAL154$0.01
24Field office type B (642.5001)EACH1$12,000
25Traffic control drums (643.0300)DAY5,900$0.15
26Traffic control warning lights type C (643.0715)DAY5,900$0.15
27Traffic control signs (643.0900)DAY2,242$0.30
28Traffic control signs PCMS (643.1050)DAY14$35.35
29Temporary marking line paint 6- inch (643.3165)LF2,972$0.46
30Traffic control (643.5000)EACH1$12,302
31Marking line epoxy 6-inch (646.2020)LF19,383$0.56
32Marking stop line epoxy 12-inch (646.6020)LF30$18.69
33Locating no-passing zones (648.0100)MI1.50$631.25
34Construction staking resurfacing reference (650.8000)LF7,659$0.15
35Construction staking supplemental control (project) 01. 8890-00-74 (650.9911)EACH1$1,850.00
36Sawing asphalt (690.0150)LF350$7.45
37Incentive iri ride (740.0440)DOL5,804$1.00
38On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00
39On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00
40Special 01. landmark reference monuments (SPV.0060)EACH2$300.00
WisDOT contract 20251014028: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy