WisDOT contract 20251014031 bid tabulation

V Menomonee Falls, Campbell Dr; Butler Ditch Bridge P67-0775 (LOC STR, Waukesha County V Menomonee Falls, Campbell Dr). Let by Wisconsin DOT on October 14, 2025, Waukesha. 5 bids received; low bid $1,468,831 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
97
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$1,468,831Low
2Vinton Construction Company$1,708,581+16%
3Super Western, Inc.$1,752,296+19%
4Zignego Company, Inc.$2,368,965+61%
5Mid City Corporation$2,787,264+90%
WisDOT contract 20251014031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. Vinton Construction Company3. Super Western, Inc.4. Zignego Company, Inc.5. Mid City Corporation
1Clearing (201.0105)STA4$1,330.00$1,327.43$1,327.43$1,327.43$1,395.00
2Grubbing (201.0205)STA4$908.00$907.53$907.53$907.53$952.00
3Removing structure (structure) 01. P-67-0775 (203.0220)EACH1$3,470.00$11,500$12,100$30,000$93,000
4Removing curb & gutter (204.0150)LF548$10.50$6.65$7.27$10.00$6.00
5Removing guardrail (204.0165)LF37$15.00$3.00$15.00$3.00$40.00
6Removing inlets (204.0220)EACH2$486.00$492.02$1,215.00$1,250.00$400.00
7Removing storm sewer (size) 01. 12-inch (204.0245)LF5$32.00$60.00$121.00$600.00$20.00
8Removing storm sewer (size) 02. 24-inch (204.0245)LF61$36.00$65.00$19.00$100.00$25.00
9Removing storm sewer (size) 03. 36-inch (204.0245)LF49$36.00$70.00$24.00$100.00$35.00
10Excavation common (205.0100)CY935$19.00$0.01$20.34$0.01$18.00
11Excavation for structures culverts (structure) 01. B-67-0407 (206.2001)EACH1$75,200$90,000$22,834$105,000$182,500
12Borrow (208.0100)CY1,443$0.01$25.40$9.90$35.00$9.75
13Backfill structure type B (210.2500)TON4,300$19.00$28.90$18.00$0.01$20.80
14Finishing roadway (project) 01. 2720-09-71 (213.0100)EACH1$500.00$4,000.00$3,134.89$1,000.00$2,000.00
15Base aggregate dense 1 1/4-inch (305.0120)TON1,311$23.00$21.50$18.85$28.50$18.70
16Breaker run (311.0110)TON500$22.50$27.70$22.29$30.00$18.70
17Tack coat (455.0605)GAL167$3.50$2.30$2.30$2.30$3.67
18Incentive density HMA pavement (460.2000)DOL380$1.00$1.00$1.00$1.00$1.00
19HMA pavement 3 MT 58-28 S (460.6223)TON422$85.00$86.45$86.45$86.45$95.00
20HMA pavement 4 MT 58-28 S (460.6224)TON164$105.00$97.95$97.95$97.95$110.00
21Adhesive anchors 1/2-inch (502.4104)EACH128$21.00$21.00$22.00$21.00$25.00
22Adhesive anchors 5/8-inch (502.4105)EACH67$25.00$25.00$26.00$25.00$26.00
23Concrete masonry culverts (504.0100)CY110$996.00$996.00$1,067.00$996.00$1,650.00
24Bar steel reinforcement HS structures (505.0400)LB3,240$1.40$1.38$1.50$1.38$1.60
25Bar steel reinforcement HS coated structures (505.0600)LB5,145$1.40$1.35$1.45$1.35$1.65
26Rubberized membrane waterproofing (516.0500)SY25$48.00$48.00$51.00$48.00$155.00
27Concrete collars for pipe (520.8000)EACH1$988.00$1,625.00$5,766.00$1,250.00$1,000.00
28Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH1$2,410.00$2,617.45$2,064.00$2,000.00$1,500.00
29Concrete curb & gutter 30-inch type D (601.0411)LF702$29.00$31.00$30.00$75.00$39.40
30Riprap heavy (606.0300)CY345$31.50$116.55$149.87$0.01$108.00
31Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF85$91.50$128.86$127.00$130.00$95.00
32Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF67$88.50$159.82$142.00$130.00$103.00
33Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF81$168.00$217.53$248.00$150.00$245.00
34Manhole covers type J (611.0530)EACH1$890.00$517.78$476.00$850.00$792.00
35Inlet covers type H (611.0624)EACH2$1,030.00$741.44$731.00$1,155.00$993.00
36Inlet covers type H-S (611.0639)EACH4$1,030.00$741.44$731.00$1,155.00$914.00
37Manholes 6-FT diameter (611.2006)EACH1$8,360.00$10,192$12,385$20,000$7,250.00
38Inlets 4-FT diameter (611.3004)EACH4$2,120.00$4,212.66$4,994.00$8,000.00$3,170.00
39Inlets 2X3-FT (611.3230)EACH1$1,560.00$3,315.74$2,158.00$5,000.00$2,480.00
40Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY225$20.00$37.24$19.00$50.00$25.00
41MGS guardrail 3 (614.2300)LF150$34.50$33.00$34.50$33.00$34.15
42MGS guardrail short radius (614.2350)LF44$45.00$40.00$45.00$40.00$39.35
43MGS guardrail terminal eat (614.2610)EACH4$4,600.00$4,200.00$4,600.00$4,200.00$3,780.00
44Maintenance and repair of haul roads (project) 01. 2720-09-71 (618.0100)EACH1$0.01$0.01$0.01$1.00$1,000.00
45Mobilization (619.1000)EACH1$84,300$218,000$73,000$273,000$210,000
46Water (624.0100)MGAL13$0.01$20.00$48.51$200.00$50.00
47Salvaged topsoil (625.0500)SY1,338$0.01$2.40$3.89$10.00$1.50
48Mulching (627.0200)SY1,338$0.38$0.25$0.38$0.25$0.32
49Erosion bales (628.1104)EACH12$15.00$12.00$15.00$12.00$15.75
50Silt fence (628.1504)LF195$5.50$3.00$5.50$3.00$3.15
51Silt fence maintenance (628.1520)LF195$0.10$0.01$0.10$0.01$0.10
52Silt fence heavy duty (628.1530.S)LF365$18.00$12.00$18.10$12.00$14.17
53Silt fence heavy duty maintenance (628.1535.S)LF365$0.40$1.00$0.40$1.00$5.25
54Mobilizations erosion control (628.1905)EACH4$110.00$50.00$110.00$50.00$262.00
55Mobilizations emergency erosion control (628.1910)EACH2$100.00$50.00$100.00$50.00$105.00
56Erosion mat class I type B (628.2004)SY1,245$2.00$1.85$1.95$1.85$1.05
57Inlet protection type A (628.7005)EACH8$90.00$50.00$90.00$50.00$157.50
58Inlet protection type C (628.7015)EACH8$45.00$50.00$45.00$50.00$63.00
59Rock bags (628.7570)EACH78$12.00$10.00$12.10$10.00$18.33
60Fertilizer type B (629.0210)CWT0.90$250.00$75.00$250.00$75.00$105.00
61Seeding mixture no. 30 (630.0130)LB59.90$10.00$8.50$10.00$8.50$15.75
62Seeding temporary (630.0200)LB144$4.80$3.00$4.75$3.00$6.30
63Seed water (630.0500)MGAL30.20$45.00$6.00$45.00$6.00$78.75
64Markers culvert end (633.5200)EACH1$55.00$60.00$55.00$60.00$63.00
65Field office type B (642.5001)EACH1$5,510.00$10,000$20,772$10,000$7,500.00
66Traffic control barricades type III (643.0420)DAY4,505$0.50$0.56$0.81$0.56$0.85
67Traffic control warning lights type A (643.0705)DAY5,670$0.25$0.19$0.24$0.19$0.25
68Traffic control signs (643.0900)DAY3,735$0.50$0.50$0.69$0.50$0.73
69Traffic control (643.5000)EACH1$2,000.00$4,900.00$4,305.20$4,900.00$4,520.00
70Geotextile type C (645.0105)SY705$2.70$3.00$4.00$10.00$3.75
71Geotextile type HR (645.0120)SY539$3.20$3.00$3.37$10.00$3.85
72Construction staking storm sewer (650.4000)EACH8$120.00$120.00$121.21$120.00$158.00
73Construction staking subgrade (650.4500)LF405$0.01$0.01$0.01$0.01$1.63
74Construction staking base (650.5000)LF405$2.50$2.50$2.53$2.50$1.63
75Construction staking curb gutter and curb & gutter (650.5500)LF702$2.00$2.00$2.02$2.00$2.05
76Construction staking structure layout (structure) 01. B-67-0407 (650.6501)EACH1$2,700.00$2,700.00$2,727.27$2,700.00$3,675.00
77Construction staking supplemental control (project) 01. 2720-09-71 (650.9911)EACH1$1,500.00$1,500.00$1,515.15$1,500.00$2,625.00
78Construction staking slope stakes (650.9920)LF405$1.00$1.00$1.01$1.00$1.98
79Sawing asphalt (690.0150)LF159$3.00$5.00$5.27$2.95$3.15
80Sawing concrete (690.0250)LF15$10.00$5.00$16.78$2.95$10.50
81Incentive strength concrete structures (715.0502)DOL660$1.00$1.00$1.00$1.00$1.00
82On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,000$5.00$5.00$5.00$5.00$5.00
83On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,400$5.00$5.00$5.00$5.00$5.00
84Special 01. structural grout (SPV.0035)CY15$550.00$263.33$589.00$550.00$750.00
85Special 01. exploratory excavation (SPV.0060)EACH1$4,630.00$1,705.95$13,785$4,000.00$2,625.00
86Special 02. remove existing gate valve (SPV.0060)EACH3$365.00$302.82$2,948.00$4,500.00$1,500.00
87Special 03. connect to existing water main (SPV.0060)EACH2$1,660.00$4,427.50$5,144.00$8,500.00$8,500.00
88Special 04. butterfly valve and box 12-inch (SPV.0060)EACH2$5,210.00$5,917.87$5,988.00$15,000$5,500.00
89Special 05. temporary water diversion (SPV.0060)EACH1$11,500$34,250$23,482$150,000$50,000
90Special 06. saddle inlet (SPV.0060)EACH1$3,950.00$8,316.87$22,935$15,000$6,500.00
91Special 01. water main HDPE 14- inch (SPV.0090)LF200$141.00$255.55$252.00$298.00$200.00
92Special 02. water main C900 12- inch (SPV.0090)LF12$413.00$456.67$451.00$500.00$200.00
93Special 03. precast concrete box culvert, 8 FT X 6 FT (SPV.0090)LF303$1,160.00$908.24$1,494.00$1,961.00$2,570.00
94Special 04. precast concrete box culvert, 12 FT X 8 FT (SPV.0090)LF151.50$2,290.00$1,766.63$2,440.00$2,756.00$4,325.00
95Special 01. enhanced turbidity barriers (SPV.0180)SY406$18.50$42.00$18.50$42.00$78.75
96Special 02. external joint sealer (SPV.0180)SY355$8.00$150.21$64.00$100.00$45.00
97Special 01. crushed rock for pipe stabilization (SPV.0195)TON50$22.50$64.40$35.00$100.00$40.00
WisDOT contract 20251014031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy