WisDOT contract 20251111001 bid tabulation
1690-04-62. Let by Wisconsin DOT on November 11, 2025, Green. 2 bids received; low bid $7,781,725 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 215
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $7,781,725 | Low |
| 2 | Payne and Dolan, Inc | $8,238,983 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Payne and Dolan, Inc |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 31 | $260.00 | $260.00 |
| 2 | Grubbing (201.0220) | ID | 8 | $25.00 | $25.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 15 | $1,134.42 | $670.00 |
| 4 | Removing structure over waterway minimal debris (structure) 01. B-23- 023 (203.0260) | EACH | 1 | $60,000 | $60,000 |
| 5 | Removing concrete pavement (204.0100) | SY | 143 | $5.45 | $17.25 |
| 6 | Removing asphaltic surface (204.0110) | SY | 579 | $8.97 | $4.20 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 1,685 | $5.56 | $7.50 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 259,940 | $0.50 | $0.75 |
| 9 | Removing curb (204.0130) | LF | 425 | $6.38 | $10.00 |
| 10 | Removing curb & gutter (204.0150) | LF | 730 | $7.44 | $10.25 |
| 11 | Removing concrete sidewalk (204.0155) | SY | 285 | $9.32 | $35.00 |
| 12 | Removing guardrail (204.0165) | LF | 9,704 | $2.40 | $2.40 |
| 13 | Removing inlets (204.0220) | EACH | 1 | $494.72 | $670.00 |
| 14 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 125 | $14.75 | $26.25 |
| 15 | Excavation common (205.0100) | CY | 26,956 | $13.92 | $10.00 |
| 16 | Excavation for structures bridges (structure) 01. B-23-023 (206.1001) | EACH | 1 | $2,500.00 | $2,500.00 |
| 17 | Borrow (208.0100) | CY | 3,000 | $15.71 | $10.00 |
| 18 | Backfill granular grade 1 (209.1500) | TON | 170 | $22.28 | $26.50 |
| 19 | Backfill granular grade 2 (209.2500) | TON | 3,080 | $16.39 | $15.25 |
| 20 | Prepare foundation for asphaltic paving (project) 01. 1690-04-62 (211.0101) | EACH | 1 | $0.01 | $1,000.00 |
| 21 | Prepare foundation for asphaltic paving (project) 02. 1690-04-73 (211.0101) | EACH | 1 | $0.01 | $1,000.00 |
| 22 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 642 | $11.33 | $45.00 |
| 23 | Finishing roadway (project) 01. 1690-04-62 (213.0100) | EACH | 1 | $5,031.85 | $1,000.00 |
| 24 | Finishing roadway (project) 02. 1690-04-73 (213.0100) | EACH | 1 | $5,031.85 | $1,000.00 |
| 25 | Base aggregate dense 3/4-inch (305.0110) | TON | 8,700 | $18.93 | $20.00 |
| 26 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 19,540 | $12.22 | $15.75 |
| 27 | Select crushed material (312.0110) | TON | 4,780 | $14.53 | $14.50 |
| 28 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 8 | $450.00 | $1,200.00 |
| 29 | Coloring concrete wisdot red (405.0100) | CY | 249 | $110.00 | $130.00 |
| 30 | Concrete pavement 9-inch (415.0090) | SY | 3,120 | $90.00 | $88.00 |
| 31 | Concrete pavement approach slab (415.0410) | SY | 147 | $300.00 | $230.00 |
| 32 | Concrete truck apron 12-inch (415.2010) | SY | 740 | $100.00 | $95.00 |
| 33 | Concrete pavement joint filling (415.4100) | SY | 3,920 | $3.30 | $3.30 |
| 34 | HMA cold weather paving (450.4000) | TON | 500 | $0.01 | $5.00 |
| 35 | HMA pavement 4 MT 58-28 S (450.6224) | TON | 38,347 | $67.08 | $78.00 |
| 36 | Tack coat (455.0605) | GAL | 21,436 | $2.34 | $0.01 |
| 37 | Asphaltic surface (465.0105) | TON | 4,151 | $76.75 | $107.00 |
| 38 | Asphaltic surface driveways and field entrances (465.0120) | TON | 124 | $146.94 | $175.00 |
| 39 | Asphaltic surface temporary (465.0125) | TON | 670 | $70.56 | $68.00 |
| 40 | Asphaltic flumes (465.0315) | SY | 50 | $53.02 | $50.00 |
| 41 | Asphaltic rumble strips, shoulder (465.0520) | LF | 114,656 | $0.13 | $0.13 |
| 42 | Asphaltic rumble strips, centerline (465.0560) | LF | 53,567 | $0.17 | $0.17 |
| 43 | Concrete masonry bridges (502.0100) | CY | 73 | $2,200.00 | $2,200.00 |
| 44 | Protective surface treatment (502.3200) | SY | 230 | $7.00 | $7.00 |
| 45 | Pigmented surface sealer (502.3210) | SY | 48 | $10.00 | $10.00 |
| 46 | Adhesive anchors no. 5 bar (502.4205) | EACH | 140 | $25.00 | $25.00 |
| 47 | Bar steel reinforcement HS coated structures (505.0600) | LB | 17,080 | $1.60 | $1.60 |
| 48 | Concrete surface repair (509.1500) | SF | 100 | $100.00 | $100.00 |
| 49 | Preparation and coating of top flanges (structure) 01. B-23-023 (517.0901.S) | EACH | 1 | $8,640.00 | $8,640.00 |
| 50 | Structure overcoating cleaning and priming (structure) 01. B-23-023 (517.3001.S) | EACH | 1 | $15,200 | $15,200 |
| 51 | Containment and collection of waste materials (structure) 01. B- 23-023 (517.4001.S) | EACH | 1 | $800.00 | $800.00 |
| 52 | Portable decontamination facility (517.6001.S) | EACH | 1 | $2,000.00 | $2,000.00 |
| 53 | Culvert pipe class III-A 18-inch (520.3318) | LF | 136 | $68.08 | $49.00 |
| 54 | Culvert pipe class III-A 24-inch (520.3324) | LF | 76 | $88.42 | $68.00 |
| 55 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518) | EACH | 6 | $1,403.21 | $1,900.00 |
| 56 | Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524) | EACH | 4 | $1,943.23 | $2,500.00 |
| 57 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 376 | $174.61 | $100.00 |
| 58 | Culvert pipe reinforced concrete class III 54-inch (522.0154) | LF | 96 | $323.14 | $310.00 |
| 59 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 540 | $290.52 | $140.00 |
| 60 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 3 | $1,256.74 | $2,100.00 |
| 61 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 8 | $1,502.71 | $2,200.00 |
| 62 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 9 | $1,815.77 | $2,400.00 |
| 63 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 2 | $4,548.36 | $4,000.00 |
| 64 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 300 | $30.00 | $34.00 |
| 65 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,022 | $25.00 | $25.00 |
| 66 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 346 | $25.00 | $25.00 |
| 67 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 1,129 | $26.00 | $27.00 |
| 68 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 1,000 | $26.00 | $27.00 |
| 69 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 410 | $25.00 | $31.50 |
| 70 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 58 | $50.00 | $80.00 |
| 71 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 30 | $50.00 | $80.00 |
| 72 | Concrete sidewalk 4-inch (602.0405) | SF | 7,362 | $6.00 | $6.90 |
| 73 | Curb ramp detectable warning field natural patina (602.0515) | SF | 10 | $50.00 | $50.00 |
| 74 | Concrete driveway 6-inch (602.0810) | SY | 100 | $54.00 | $65.00 |
| 75 | Concrete surface drains (602.3010) | CY | 4 | $700.00 | $660.00 |
| 76 | Concrete barrier temporary precast delivered (603.8000) | LF | 1,225 | $16.06 | $16.22 |
| 77 | Concrete barrier temporary precast installed (603.8125) | LF | 1,225 | $9.20 | $9.29 |
| 78 | Anchoring concrete barrier temporary precast (603.8500) | LF | 1,225 | $8.25 | $8.33 |
| 79 | Riprap medium (606.0200) | CY | 119 | $74.90 | $150.00 |
| 80 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 155 | $81.33 | $80.00 |
| 81 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 465 | $87.98 | $84.00 |
| 82 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 111 | $96.03 | $100.00 |
| 83 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 148 | $118.40 | $150.00 |
| 84 | Inlet covers type H (611.0624) | EACH | 4 | $1,136.15 | $1,400.00 |
| 85 | Inlet covers type HM (611.0627) | EACH | 9 | $1,136.15 | $1,400.00 |
| 86 | Inlet covers type H-S (611.0639) | EACH | 2 | $1,143.76 | $1,400.00 |
| 87 | Inlet covers type MS (611.0642) | EACH | 2 | $712.31 | $1,100.00 |
| 88 | Inlet covers type T (611.0652) | EACH | 3 | $1,468.22 | $1,700.00 |
| 89 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $3,207.09 | $4,200.00 |
| 90 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $4,985.33 | $5,300.00 |
| 91 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $7,305.31 | $8,800.00 |
| 92 | Inlets 4-FT diameter (611.3004) | EACH | 5 | $2,415.39 | $3,100.00 |
| 93 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $2,060.32 | $5,300.00 |
| 94 | Inlets 2X3-FT (611.3230) | EACH | 9 | $2,154.24 | $2,300.00 |
| 95 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,830.82 | $3,400.00 |
| 96 | Barrier system grading shaping finishing (614.0010) | EACH | 18 | $8,188.00 | $9,500.00 |
| 97 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $350.00 | $350.00 |
| 98 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 2,700 | $12.00 | $12.00 |
| 99 | Crash cushions temporary (614.0905) | EACH | 2 | $4,750.00 | $3,447.54 |
| 100 | MGS guardrail 3 (614.2300) | LF | 2,100 | $25.00 | $25.00 |
| 101 | MGS guardrail 3 K (614.2330) | LF | 7,440 | $36.00 | $36.00 |
| 102 | MGS guardrail 3 L (614.2340) | LF | 225 | $26.00 | $26.00 |
| 103 | MGS guardrail short radius (614.2350) | LF | 272.50 | $27.00 | $27.00 |
| 104 | MGS thrie beam transition (614.2500) | LF | 316 | $85.00 | $85.00 |
| 105 | MGS guardrail terminal eat (614.2610) | EACH | 38 | $3,595.00 | $3,595.00 |
| 106 | MGS guardrail short radius terminal (614.2630) | EACH | 6 | $2,450.00 | $2,450.00 |
| 107 | Maintenance and repair of haul roads (project) 01. 1690-04-62 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 108 | Maintenance and repair of haul roads (project) 02. 1690-04-73 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 109 | Mobilization (619.1000) | EACH | 1 | $431,597 | $250,000 |
| 110 | Concrete median sloped nose (620.0300) | SF | 163 | $14.00 | $12.50 |
| 111 | Water (624.0100) | MGAL | 524 | $0.01 | $39.50 |
| 112 | Salvaged topsoil (625.0500) | SY | 42,380 | $0.01 | $1.70 |
| 113 | Mulching (627.0200) | SY | 15,810 | $0.35 | $0.35 |
| 114 | Silt fence (628.1504) | LF | 7,754 | $2.00 | $2.00 |
| 115 | Silt fence maintenance (628.1520) | LF | 7,754 | $0.01 | $0.01 |
| 116 | Mobilizations erosion control (628.1905) | EACH | 15 | $100.00 | $100.00 |
| 117 | Mobilizations emergency erosion control (628.1910) | EACH | 13 | $100.00 | $100.00 |
| 118 | Erosion mat class I type B (628.2004) | SY | 24,260 | $1.00 | $1.00 |
| 119 | Erosion mat urban class I type B (628.2008) | SY | 1,280 | $1.75 | $1.75 |
| 120 | Erosion mat class II type B (628.2023) | SY | 7,000 | $1.70 | $1.70 |
| 121 | Inlet protection type A (628.7005) | EACH | 9 | $100.00 | $100.00 |
| 122 | Inlet protection type C (628.7015) | EACH | 23 | $65.00 | $65.00 |
| 123 | Temporary ditch checks (628.7504) | LF | 930 | $7.50 | $7.50 |
| 124 | Culvert pipe checks (628.7555) | EACH | 31 | $18.00 | $18.00 |
| 125 | Rock bags (628.7570) | EACH | 102 | $18.00 | $18.00 |
| 126 | Fertilizer type B (629.0210) | CWT | 30.78 | $90.00 | $90.00 |
| 127 | Seeding mixture no. 30 (630.0130) | LB | 1,597 | $8.50 | $8.50 |
| 128 | Seeding mixture no. 80 (630.0180) | LB | 196 | $25.00 | $25.00 |
| 129 | Seeding temporary (630.0200) | LB | 300 | $4.00 | $4.00 |
| 130 | Seed water (630.0500) | MGAL | 463 | $10.00 | $10.00 |
| 131 | Markers culvert end (633.5200) | EACH | 22 | $65.00 | $65.00 |
| 132 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 23 | $85.00 | $85.00 |
| 133 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 5 | $95.00 | $95.00 |
| 134 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 8 | $105.00 | $105.00 |
| 135 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 12 | $185.00 | $185.00 |
| 136 | Signs type II reflective H (637.2210) | SF | 418.04 | $19.00 | $19.00 |
| 137 | Signs type II reflective F (637.2230) | SF | 76.75 | $20.00 | $20.00 |
| 138 | Moving signs type II (638.2102) | EACH | 30 | $150.00 | $150.00 |
| 139 | Removing signs type II (638.2602) | EACH | 38 | $40.00 | $40.00 |
| 140 | Removing small sign supports (638.3000) | EACH | 37 | $40.00 | $40.00 |
| 141 | Moving small sign supports (638.4000) | EACH | 27 | $100.00 | $100.00 |
| 142 | Field office type D (642.5401) | EACH | 1 | $11,700 | $18,314 |
| 143 | Traffic control drums (643.0300) | DAY | 102,116 | $0.17 | $0.17 |
| 144 | Traffic control barricades type III (643.0420) | DAY | 7,916 | $0.43 | $0.43 |
| 145 | Traffic control warning lights type A (643.0705) | DAY | 11,032 | $0.15 | $0.15 |
| 146 | Traffic control warning lights type C (643.0715) | DAY | 32,272 | $0.09 | $0.09 |
| 147 | Traffic control signs (643.0900) | DAY | 35,077 | $0.30 | $0.30 |
| 148 | Traffic control covering signs type I (643.0910) | EACH | 10 | $106.40 | $106.40 |
| 149 | Traffic control covering signs type II (643.0920) | EACH | 31 | $54.16 | $54.16 |
| 150 | Traffic control signs PCMS (643.1050) | DAY | 190 | $30.94 | $30.94 |
| 151 | Temporary marking line paint 6- inch (643.3165) | LF | 74,304 | $0.65 | $0.26 |
| 152 | Temporary marking line epoxy 6- inch (643.3170) | LF | 40,000 | $1.20 | $0.41 |
| 153 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 17 | $24.39 | $24.39 |
| 154 | Traffic control (643.5000) | EACH | 1 | $16,617 | $16,617 |
| 155 | Temporary pedestrian barricade (644.1810) | LF | 18 | $16.92 | $16.92 |
| 156 | Geotextile type HR (645.0120) | SY | 350 | $1.61 | $6.00 |
| 157 | Marking line epoxy 6-inch (646.2020) | LF | 735 | $0.75 | $0.46 |
| 158 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 4,989 | $0.85 | $0.85 |
| 159 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 225,759 | $1.25 | $1.37 |
| 160 | Marking line epoxy 10-inch (646.4020) | LF | 65 | $1.40 | $3.00 |
| 161 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,142 | $2.50 | $2.75 |
| 162 | Marking arrow epoxy (646.5020) | EACH | 24 | $350.00 | $372.60 |
| 163 | Marking word epoxy (646.5120) | EACH | 10 | $425.00 | $377.00 |
| 164 | Marking stop line epoxy 18-inch (646.6120) | LF | 119 | $24.00 | $15.60 |
| 165 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 141 | $24.00 | $15.60 |
| 166 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,171 | $11.00 | $15.25 |
| 167 | Marking curb epoxy (646.8120) | LF | 153 | $15.00 | $7.50 |
| 168 | Marking island nose epoxy (646.8220) | EACH | 4 | $500.00 | $280.00 |
| 169 | Marking removal line 4-inch (646.9000) | LF | 16,072 | $0.34 | $0.34 |
| 170 | Marking removal line 8-inch (646.9100) | LF | 664 | $0.67 | $0.67 |
| 171 | Construction staking storm sewer (650.4000) | EACH | 42 | $50.00 | $180.00 |
| 172 | Construction staking subgrade (650.4500) | LF | 2,706 | $0.01 | $0.01 |
| 173 | Construction staking base (650.5000) | LF | 7,662 | $0.01 | $1.50 |
| 174 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 573 | $1.00 | $2.50 |
| 175 | Construction staking pipe culverts (650.6000) | EACH | 14 | $100.00 | $380.00 |
| 176 | Construction staking concrete barrier (650.7500) | LF | 1,225 | $0.01 | $1.50 |
| 177 | Construction staking resurfacing reference (650.8000) | LF | 65,209 | $0.09 | $0.22 |
| 178 | Construction staking electrical installations (project) 01. 1690-04- 73 (650.8501) | EACH | 1 | $1,500.00 | $4,000.00 |
| 179 | Construction staking curb ramps (650.9000) | EACH | 1 | $150.00 | $300.00 |
| 180 | Construction staking supplemental control (project) 01. 1690-04-62 (650.9911) | EACH | 1 | $1,500.00 | $2,000.00 |
| 181 | Construction staking supplemental control (project) 02. 1690-04-73 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 |
| 182 | Construction staking slope stakes (650.9920) | LF | 16,692 | $0.01 | $1.50 |
| 183 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,526 | $12.00 | $12.00 |
| 184 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 120 | $14.00 | $14.00 |
| 185 | Conduit special 2-inch (652.0605) | LF | 183 | $45.00 | $45.00 |
| 186 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 7 | $2,100.00 | $2,100.00 |
| 187 | Concrete bases type 5 (654.0105) | EACH | 15 | $1,250.00 | $1,250.00 |
| 188 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $2,000.00 | $2,000.00 |
| 189 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,250 | $1.25 | $1.25 |
| 190 | Electrical wire lighting 10 AWG (655.0615) | LF | 6,595 | $1.50 | $1.50 |
| 191 | Electrical service meter breaker pedestal (location) 01. intersection of STH 69 and CTH C (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 |
| 192 | Poles type 5-aluminum (657.0322) | EACH | 15 | $2,250.00 | $2,250.00 |
| 193 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 15 | $780.00 | $780.00 |
| 194 | Luminaire arms steel type 13 pole clamp 15-FT (657.0825) | EACH | 15 | $1,236.00 | $1,236.00 |
| 195 | Luminaires utility LED B (659.1120) | EACH | 15 | $300.00 | $300.00 |
| 196 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,000.00 | $8,000.00 |
| 197 | Sawing asphalt (690.0150) | LF | 5,048 | $1.20 | $1.20 |
| 198 | Sawing concrete (690.0250) | LF | 28 | $3.25 | $3.25 |
| 199 | HMA percent within limits (PWL) test strip volumetrics (705.0105) | EACH | 1 | $3,500.00 | $1,000.00 |
| 200 | Nuclear gauge correlation strip - HMA, SMA (705.0110) | EACH | 1 | $3,500.00 | $1,000.00 |
| 201 | Incentive density PWL HMA pavement (705.2005) | DOL | 34,190 | $1.00 | $1.00 |
| 202 | Incentive density HMA pavement longitudinal joints (705.2007) | DOL | 17,820 | $1.00 | $1.00 |
| 203 | Incentive air voids HMA pavement (705.2010) | DOL | 37,130 | $1.00 | $1.00 |
| 204 | Incentive compressive strength concrete pavement (706.0020) | DOL | 936 | $1.00 | $1.00 |
| 205 | Incentive iri ride (729.0440) | DOL | 24,157 | $1.00 | $1.00 |
| 206 | Installing and maintaining bird deterrent system (station) 01. sta 543+68 - sta 544+16 (999.2000.S) | EACH | 1 | $100.00 | $100.00 |
| 207 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 |
| 208 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,520 | $5.00 | $5.00 |
| 209 | Special 01. construction staking roundabout (SPV.0060) | EACH | 1 | $1,500.00 | $30,000 |
| 210 | Special 02. temporary mailboxes (SPV.0060) | EACH | 1 | $1,033.06 | $500.00 |
| 211 | Special 03. research and locate existing land parcel monuments (SPV.0060) | EACH | 10 | $250.00 | $180.00 |
| 212 | Special 04. verify and replace existing land parcel monuments (SPV.0060) | EACH | 10 | $250.00 | $180.00 |
| 213 | Special 01. native pollinator seeding mixture no. 95A (SPV.0085) | LB | 2 | $350.00 | $350.00 |
| 214 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 5,231 | $5.24 | $3.50 |
| 215 | Special 02. salvage and replace landscaping stone (SPV.0180) | SY | 66 | $60.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.