WisDOT contract 20251111001 bid tabulation

1690-04-62. Let by Wisconsin DOT on November 11, 2025, Green. 2 bids received; low bid $7,781,725 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
215
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$7,781,725Low
2Payne and Dolan, Inc$8,238,983+6.0%
WisDOT contract 20251111001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Payne and Dolan, Inc
1Grubbing (201.0205)STA31$260.00$260.00
2Grubbing (201.0220)ID8$25.00$25.00
3Removing small pipe culverts (203.0100)EACH15$1,134.42$670.00
4Removing structure over waterway minimal debris (structure) 01. B-23- 023 (203.0260)EACH1$60,000$60,000
5Removing concrete pavement (204.0100)SY143$5.45$17.25
6Removing asphaltic surface (204.0110)SY579$8.97$4.20
7Removing asphaltic surface butt joints (204.0115)SY1,685$5.56$7.50
8Removing asphaltic surface milling (204.0120)SY259,940$0.50$0.75
9Removing curb (204.0130)LF425$6.38$10.00
10Removing curb & gutter (204.0150)LF730$7.44$10.25
11Removing concrete sidewalk (204.0155)SY285$9.32$35.00
12Removing guardrail (204.0165)LF9,704$2.40$2.40
13Removing inlets (204.0220)EACH1$494.72$670.00
14Removing storm sewer (size) 01. 15-inch (204.0245)LF125$14.75$26.25
15Excavation common (205.0100)CY26,956$13.92$10.00
16Excavation for structures bridges (structure) 01. B-23-023 (206.1001)EACH1$2,500.00$2,500.00
17Borrow (208.0100)CY3,000$15.71$10.00
18Backfill granular grade 1 (209.1500)TON170$22.28$26.50
19Backfill granular grade 2 (209.2500)TON3,080$16.39$15.25
20Prepare foundation for asphaltic paving (project) 01. 1690-04-62 (211.0101)EACH1$0.01$1,000.00
21Prepare foundation for asphaltic paving (project) 02. 1690-04-73 (211.0101)EACH1$0.01$1,000.00
22Prepare foundation for asphaltic shoulders (211.0400)STA642$11.33$45.00
23Finishing roadway (project) 01. 1690-04-62 (213.0100)EACH1$5,031.85$1,000.00
24Finishing roadway (project) 02. 1690-04-73 (213.0100)EACH1$5,031.85$1,000.00
25Base aggregate dense 3/4-inch (305.0110)TON8,700$18.93$20.00
26Base aggregate dense 1 1/4-inch (305.0120)TON19,540$12.22$15.75
27Select crushed material (312.0110)TON4,780$14.53$14.50
28QMP base aggregate dense 1 1/4- inch compaction (371.2000.S)EACH8$450.00$1,200.00
29Coloring concrete wisdot red (405.0100)CY249$110.00$130.00
30Concrete pavement 9-inch (415.0090)SY3,120$90.00$88.00
31Concrete pavement approach slab (415.0410)SY147$300.00$230.00
32Concrete truck apron 12-inch (415.2010)SY740$100.00$95.00
33Concrete pavement joint filling (415.4100)SY3,920$3.30$3.30
34HMA cold weather paving (450.4000)TON500$0.01$5.00
35HMA pavement 4 MT 58-28 S (450.6224)TON38,347$67.08$78.00
36Tack coat (455.0605)GAL21,436$2.34$0.01
37Asphaltic surface (465.0105)TON4,151$76.75$107.00
38Asphaltic surface driveways and field entrances (465.0120)TON124$146.94$175.00
39Asphaltic surface temporary (465.0125)TON670$70.56$68.00
40Asphaltic flumes (465.0315)SY50$53.02$50.00
41Asphaltic rumble strips, shoulder (465.0520)LF114,656$0.13$0.13
42Asphaltic rumble strips, centerline (465.0560)LF53,567$0.17$0.17
43Concrete masonry bridges (502.0100)CY73$2,200.00$2,200.00
44Protective surface treatment (502.3200)SY230$7.00$7.00
45Pigmented surface sealer (502.3210)SY48$10.00$10.00
46Adhesive anchors no. 5 bar (502.4205)EACH140$25.00$25.00
47Bar steel reinforcement HS coated structures (505.0600)LB17,080$1.60$1.60
48Concrete surface repair (509.1500)SF100$100.00$100.00
49Preparation and coating of top flanges (structure) 01. B-23-023 (517.0901.S)EACH1$8,640.00$8,640.00
50Structure overcoating cleaning and priming (structure) 01. B-23-023 (517.3001.S)EACH1$15,200$15,200
51Containment and collection of waste materials (structure) 01. B- 23-023 (517.4001.S)EACH1$800.00$800.00
52Portable decontamination facility (517.6001.S)EACH1$2,000.00$2,000.00
53Culvert pipe class III-A 18-inch (520.3318)LF136$68.08$49.00
54Culvert pipe class III-A 24-inch (520.3324)LF76$88.42$68.00
55Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518)EACH6$1,403.21$1,900.00
56Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524)EACH4$1,943.23$2,500.00
57Culvert pipe reinforced concrete class III 24-inch (522.0124)LF376$174.61$100.00
58Culvert pipe reinforced concrete class III 54-inch (522.0154)LF96$323.14$310.00
59Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF540$290.52$140.00
60Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH3$1,256.74$2,100.00
61Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH8$1,502.71$2,200.00
62Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH9$1,815.77$2,400.00
63Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054)EACH2$4,548.36$4,000.00
64Concrete curb & gutter 18-inch type A (601.0405)LF300$30.00$34.00
65Concrete curb & gutter 30-inch type A (601.0409)LF1,022$25.00$25.00
66Concrete curb & gutter 30-inch type D (601.0411)LF346$25.00$25.00
67Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF1,129$26.00$27.00
68Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,000$26.00$27.00
69Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF410$25.00$31.50
70Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF58$50.00$80.00
71Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF30$50.00$80.00
72Concrete sidewalk 4-inch (602.0405)SF7,362$6.00$6.90
73Curb ramp detectable warning field natural patina (602.0515)SF10$50.00$50.00
74Concrete driveway 6-inch (602.0810)SY100$54.00$65.00
75Concrete surface drains (602.3010)CY4$700.00$660.00
76Concrete barrier temporary precast delivered (603.8000)LF1,225$16.06$16.22
77Concrete barrier temporary precast installed (603.8125)LF1,225$9.20$9.29
78Anchoring concrete barrier temporary precast (603.8500)LF1,225$8.25$8.33
79Riprap medium (606.0200)CY119$74.90$150.00
80Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF155$81.33$80.00
81Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF465$87.98$84.00
82Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF111$96.03$100.00
83Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF148$118.40$150.00
84Inlet covers type H (611.0624)EACH4$1,136.15$1,400.00
85Inlet covers type HM (611.0627)EACH9$1,136.15$1,400.00
86Inlet covers type H-S (611.0639)EACH2$1,143.76$1,400.00
87Inlet covers type MS (611.0642)EACH2$712.31$1,100.00
88Inlet covers type T (611.0652)EACH3$1,468.22$1,700.00
89Manholes 5-FT diameter (611.2005)EACH1$3,207.09$4,200.00
90Manholes 6-FT diameter (611.2006)EACH1$4,985.33$5,300.00
91Manholes 7-FT diameter (611.2007)EACH1$7,305.31$8,800.00
92Inlets 4-FT diameter (611.3004)EACH5$2,415.39$3,100.00
93Inlets 2X2.5-FT (611.3225)EACH1$2,060.32$5,300.00
94Inlets 2X3-FT (611.3230)EACH9$2,154.24$2,300.00
95Inlets median 2 grate (611.3902)EACH1$3,830.82$3,400.00
96Barrier system grading shaping finishing (614.0010)EACH18$8,188.00$9,500.00
97Anchor assemblies for steel plate beam guard (614.0150)EACH4$350.00$350.00
98Guardrail mow strip emulsified asphalt (614.0397)SY2,700$12.00$12.00
99Crash cushions temporary (614.0905)EACH2$4,750.00$3,447.54
100MGS guardrail 3 (614.2300)LF2,100$25.00$25.00
101MGS guardrail 3 K (614.2330)LF7,440$36.00$36.00
102MGS guardrail 3 L (614.2340)LF225$26.00$26.00
103MGS guardrail short radius (614.2350)LF272.50$27.00$27.00
104MGS thrie beam transition (614.2500)LF316$85.00$85.00
105MGS guardrail terminal eat (614.2610)EACH38$3,595.00$3,595.00
106MGS guardrail short radius terminal (614.2630)EACH6$2,450.00$2,450.00
107Maintenance and repair of haul roads (project) 01. 1690-04-62 (618.0100)EACH1$0.01$0.01
108Maintenance and repair of haul roads (project) 02. 1690-04-73 (618.0100)EACH1$0.01$0.01
109Mobilization (619.1000)EACH1$431,597$250,000
110Concrete median sloped nose (620.0300)SF163$14.00$12.50
111Water (624.0100)MGAL524$0.01$39.50
112Salvaged topsoil (625.0500)SY42,380$0.01$1.70
113Mulching (627.0200)SY15,810$0.35$0.35
114Silt fence (628.1504)LF7,754$2.00$2.00
115Silt fence maintenance (628.1520)LF7,754$0.01$0.01
116Mobilizations erosion control (628.1905)EACH15$100.00$100.00
117Mobilizations emergency erosion control (628.1910)EACH13$100.00$100.00
118Erosion mat class I type B (628.2004)SY24,260$1.00$1.00
119Erosion mat urban class I type B (628.2008)SY1,280$1.75$1.75
120Erosion mat class II type B (628.2023)SY7,000$1.70$1.70
121Inlet protection type A (628.7005)EACH9$100.00$100.00
122Inlet protection type C (628.7015)EACH23$65.00$65.00
123Temporary ditch checks (628.7504)LF930$7.50$7.50
124Culvert pipe checks (628.7555)EACH31$18.00$18.00
125Rock bags (628.7570)EACH102$18.00$18.00
126Fertilizer type B (629.0210)CWT30.78$90.00$90.00
127Seeding mixture no. 30 (630.0130)LB1,597$8.50$8.50
128Seeding mixture no. 80 (630.0180)LB196$25.00$25.00
129Seeding temporary (630.0200)LB300$4.00$4.00
130Seed water (630.0500)MGAL463$10.00$10.00
131Markers culvert end (633.5200)EACH22$65.00$65.00
132Posts wood 4X6-inch X 14-FT (634.0614)EACH23$85.00$85.00
133Posts wood 4X6-inch X 16-FT (634.0616)EACH5$95.00$95.00
134Posts wood 4X6-inch X 20-FT (634.0620)EACH8$105.00$105.00
135Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH12$185.00$185.00
136Signs type II reflective H (637.2210)SF418.04$19.00$19.00
137Signs type II reflective F (637.2230)SF76.75$20.00$20.00
138Moving signs type II (638.2102)EACH30$150.00$150.00
139Removing signs type II (638.2602)EACH38$40.00$40.00
140Removing small sign supports (638.3000)EACH37$40.00$40.00
141Moving small sign supports (638.4000)EACH27$100.00$100.00
142Field office type D (642.5401)EACH1$11,700$18,314
143Traffic control drums (643.0300)DAY102,116$0.17$0.17
144Traffic control barricades type III (643.0420)DAY7,916$0.43$0.43
145Traffic control warning lights type A (643.0705)DAY11,032$0.15$0.15
146Traffic control warning lights type C (643.0715)DAY32,272$0.09$0.09
147Traffic control signs (643.0900)DAY35,077$0.30$0.30
148Traffic control covering signs type I (643.0910)EACH10$106.40$106.40
149Traffic control covering signs type II (643.0920)EACH31$54.16$54.16
150Traffic control signs PCMS (643.1050)DAY190$30.94$30.94
151Temporary marking line paint 6- inch (643.3165)LF74,304$0.65$0.26
152Temporary marking line epoxy 6- inch (643.3170)LF40,000$1.20$0.41
153Temporary marking stop line removable tape 18-inch (643.3850)LF17$24.39$24.39
154Traffic control (643.5000)EACH1$16,617$16,617
155Temporary pedestrian barricade (644.1810)LF18$16.92$16.92
156Geotextile type HR (645.0120)SY350$1.61$6.00
157Marking line epoxy 6-inch (646.2020)LF735$0.75$0.46
158Marking line grooved black epoxy 6-inch (646.2025)LF4,989$0.85$0.85
159Marking line grooved wet ref epoxy 6-inch (646.2040)LF225,759$1.25$1.37
160Marking line epoxy 10-inch (646.4020)LF65$1.40$3.00
161Marking line grooved wet ref epoxy 10-inch (646.4040)LF3,142$2.50$2.75
162Marking arrow epoxy (646.5020)EACH24$350.00$372.60
163Marking word epoxy (646.5120)EACH10$425.00$377.00
164Marking stop line epoxy 18-inch (646.6120)LF119$24.00$15.60
165Marking dotted extension epoxy 18-inch (646.6320)LF141$24.00$15.60
166Marking diagonal epoxy 12-inch (646.7120)LF1,171$11.00$15.25
167Marking curb epoxy (646.8120)LF153$15.00$7.50
168Marking island nose epoxy (646.8220)EACH4$500.00$280.00
169Marking removal line 4-inch (646.9000)LF16,072$0.34$0.34
170Marking removal line 8-inch (646.9100)LF664$0.67$0.67
171Construction staking storm sewer (650.4000)EACH42$50.00$180.00
172Construction staking subgrade (650.4500)LF2,706$0.01$0.01
173Construction staking base (650.5000)LF7,662$0.01$1.50
174Construction staking curb gutter and curb & gutter (650.5500)LF573$1.00$2.50
175Construction staking pipe culverts (650.6000)EACH14$100.00$380.00
176Construction staking concrete barrier (650.7500)LF1,225$0.01$1.50
177Construction staking resurfacing reference (650.8000)LF65,209$0.09$0.22
178Construction staking electrical installations (project) 01. 1690-04- 73 (650.8501)EACH1$1,500.00$4,000.00
179Construction staking curb ramps (650.9000)EACH1$150.00$300.00
180Construction staking supplemental control (project) 01. 1690-04-62 (650.9911)EACH1$1,500.00$2,000.00
181Construction staking supplemental control (project) 02. 1690-04-73 (650.9911)EACH1$1,500.00$1,500.00
182Construction staking slope stakes (650.9920)LF16,692$0.01$1.50
183Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,526$12.00$12.00
184Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF120$14.00$14.00
185Conduit special 2-inch (652.0605)LF183$45.00$45.00
186Pull boxes non-conductive 24X42- inch (653.0164)EACH7$2,100.00$2,100.00
187Concrete bases type 5 (654.0105)EACH15$1,250.00$1,250.00
188Concrete control cabinet bases type L24 (654.0224)EACH1$2,000.00$2,000.00
189Electrical wire lighting 12 AWG (655.0610)LF2,250$1.25$1.25
190Electrical wire lighting 10 AWG (655.0615)LF6,595$1.50$1.50
191Electrical service meter breaker pedestal (location) 01. intersection of STH 69 and CTH C (656.0201)EACH1$2,000.00$2,000.00
192Poles type 5-aluminum (657.0322)EACH15$2,250.00$2,250.00
193Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH15$780.00$780.00
194Luminaire arms steel type 13 pole clamp 15-FT (657.0825)EACH15$1,236.00$1,236.00
195Luminaires utility LED B (659.1120)EACH15$300.00$300.00
196Lighting control cabinets 120/240 24-inch (659.2124)EACH1$8,000.00$8,000.00
197Sawing asphalt (690.0150)LF5,048$1.20$1.20
198Sawing concrete (690.0250)LF28$3.25$3.25
199HMA percent within limits (PWL) test strip volumetrics (705.0105)EACH1$3,500.00$1,000.00
200Nuclear gauge correlation strip - HMA, SMA (705.0110)EACH1$3,500.00$1,000.00
201Incentive density PWL HMA pavement (705.2005)DOL34,190$1.00$1.00
202Incentive density HMA pavement longitudinal joints (705.2007)DOL17,820$1.00$1.00
203Incentive air voids HMA pavement (705.2010)DOL37,130$1.00$1.00
204Incentive compressive strength concrete pavement (706.0020)DOL936$1.00$1.00
205Incentive iri ride (729.0440)DOL24,157$1.00$1.00
206Installing and maintaining bird deterrent system (station) 01. sta 543+68 - sta 544+16 (999.2000.S)EACH1$100.00$100.00
207On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00$5.00
208On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,520$5.00$5.00
209Special 01. construction staking roundabout (SPV.0060)EACH1$1,500.00$30,000
210Special 02. temporary mailboxes (SPV.0060)EACH1$1,033.06$500.00
211Special 03. research and locate existing land parcel monuments (SPV.0060)EACH10$250.00$180.00
212Special 04. verify and replace existing land parcel monuments (SPV.0060)EACH10$250.00$180.00
213Special 01. native pollinator seeding mixture no. 95A (SPV.0085)LB2$350.00$350.00
214Special 01. removing distressed pavement milling (SPV.0180)SY5,231$5.24$3.50
215Special 02. salvage and replace landscaping stone (SPV.0180)SY66$60.00$60.00
WisDOT contract 20251111001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy