RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$11,934,347Low
WisDOT contract 20251209031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc
1Grubbing (201.0205)STA48$230.72
2Removing small pipe culverts (203.0100)EACH2$689.89
3Removing concrete pavement (204.0100)SY380$16.83
4Removing asphaltic surface (204.0110)SY363,200$2.85
5Removing asphaltic surface butt joints (204.0115)SY690$12.25
6Removing asphaltic surface milling (204.0120)SY8,046$5.10
7Removing gutter (204.0140)LF68,700$2.32
8Removing curb & gutter (204.0150)LF12,430$2.65
9Removing guardrail (204.0165)LF1,600$3.00
10Removing delineators and markers (204.0180)EACH10$50.00
11Removing inlets (204.0220)EACH35$517.85
12Removing storm sewer (size) 01. 12-inch (204.0245)LF120$67.87
13Removing storm sewer (size) 02. 15-inch (204.0245)LF125$84.91
14Removing storm sewer (size) 03. 30-inch (204.0245)LF8$175.29
15Removing (item description) 01. remove asphaltic flume (204.9060.S)EACH24$220.95
16Excavation common (205.0100)CY3,286$18.06
17Excavation for structures bridges (structure) 01. B-68-0051 (206.1001)EACH1$3,850.07
18Borrow (208.0100)CY565$16.08
19Backfill structure type A (210.1500)TON120$32.25
20Prepare foundation for base aggregate (211.0500)STA800$52.32
21Finishing roadway (project) 01. 1600-15-70 (213.0100)EACH1$4,950.00
22Base aggregate dense 3/4-inch (305.0110)TON3,900$11.41
23Base aggregate dense 1 1/4-inch (305.0120)TON19,700$9.78
24Concrete pavement 9-inch (415.0090)SY82$85.00
25Concrete pavement approach slab (415.0410)SY286$285.00
26Drilled tie bars (416.0610)EACH94$13.00
27HMA cold weather paving (450.4000)TON150$3.50
28Tack coat (455.0605)GAL26,500$3.00
29HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$2,850.00
30HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$3,870.00
31Incentive density HMA pavement (460.2000)DOL17,760$1.00
32Incentive density PWL HMA pavement (460.2005)DOL61,723$1.00
33Incentive density HMA pavement longitudinal joints (460.2007)DOL16,530$1.00
34Incentive air voids HMA pavement (460.2010)DOL69,812$1.00
35HMA pavement 4 LT 58-28 S (460.5224)TON27,860$69.10
36HMA pavement 3 MT 58-28 S (460.6223)TON45,350$63.70
37HMA pavement 4 MT 58-28 S (460.6224)TON24,423$77.10
38Asphaltic surface (465.0105)TON50$315.00
39Asphaltic surface driveways and field entrances (465.0120)TON175$195.00
40Asphaltic surface temporary (465.0125)TON650$109.45
41Asphaltic surface safety islands (465.0305)TON825$109.45
42Asphaltic flumes (465.0315)SY320$77.10
43Asphaltic rumble strips, shoulder divided roadway (465.0510)LF73,000$0.55
44Asphaltic rumble strips, centerline (465.0560)LF240$8.10
45Sawing pavement deck preparation areas (509.0310.S)LF180$15.00
46Concrete surface repair (509.1500)SF360$76.38
47Culvert pipe temporary 24-inch (520.2024)LF50$58.09
48Concrete collars for pipe (520.8000)EACH25$500.00
49Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH1$337.27
50Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH2$618.29
51Culvert pipe corrugated steel 24- inch (521.3124)LF50$87.00
52Culvert pipe corrugated polyethylene 12-inch (530.0112)LF18$93.91
53Concrete curb & gutter 30-inch type D (601.0411)LF55$85.00
54Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF198$35.00
55Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF11,230$19.00
56Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF785$19.00
57Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF196$35.00
58Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF22$75.00
59Concrete surface drains (602.3010)CY10$1,500.00
60Concrete barrier type S32 (603.1132)LF120$336.00
61Riprap medium (606.0200)CY120$142.16
62Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF140$236.37
63Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF169$280.88
64Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF8$404.50
65Inlet covers type HM-GJ (611.0630)EACH30$1,462.57
66Inlet covers type HM-GJ-S (611.0633)EACH5$1,462.57
67Inlet covers type V (611.0654)EACH1$1,334.14
68Manholes 6-FT diameter (611.2006)EACH1$10,293
69Inlets 2X2.5-FT (611.3225)EACH1$2,014.90
70Inlets 2X3-FT (611.3230)EACH35$2,746.99
71MGS guardrail 3 (614.2300)LF938$29.00
72MGS guardrail 3 L (614.2340)LF225$31.00
73MGS thrie beam transition (614.2500)LF315$92.00
74MGS guardrail terminal eat (614.2610)EACH18$4,800.00
75Maintenance and repair of haul roads (project) 01. 1600-15-70 (618.0100)EACH1$1.00
76Mobilization (619.1000)EACH1$1,003,500
77Concrete median sloped nose (620.0300)SF1,160$14.00
78Water (624.0100)MGAL344$43.77
79Topsoil (625.0100)SY19,320$1.46
80Silt fence (628.1504)LF8,660$1.90
81Silt fence maintenance (628.1520)LF17,330$0.01
82Mobilizations erosion control (628.1905)EACH14$350.00
83Mobilizations emergency erosion control (628.1910)EACH9$0.01
84Erosion mat class I type B (628.2004)SY7,410$1.20
85Erosion mat urban class I type B (628.2008)SY9,810$1.85
86Erosion mat class II type C (628.2027)SY2,100$4.50
87Inlet protection type A (628.7005)EACH37$20.00
88Inlet protection type C (628.7015)EACH37$150.00
89Inlet protection type D (628.7020)EACH11$120.00
90Temporary ditch checks (628.7504)LF420$10.00
91Culvert pipe checks (628.7555)EACH90$15.00
92Rock bags (628.7570)EACH180$15.00
93Fertilizer type B (629.0210)CWT87$120.00
94Seeding mixture no. 20 (630.0120)LB760$8.00
95Seeding mixture no. 30 (630.0130)LB4,790$6.75
96Seeding temporary (630.0200)LB80$4.00
97Seed water (630.0500)MGAL460$0.01
98Delineators flexible (633.0200)EACH10$85.00
99Markers culvert end (633.5200)EACH16$85.00
100Posts wood 4X6-inch X 12-FT (634.0612)EACH2$125.00
101Posts wood 4X6-inch X 16-FT (634.0616)EACH56$145.00
102Posts wood 4X6-inch X 18-FT (634.0618)EACH14$155.00
103Signs type II reflective H (637.2210)SF753$26.00
104Moving signs type II (638.2102)EACH24$100.00
105Removing signs type II (638.2602)EACH19$50.00
106Removing small sign supports (638.3000)EACH33$50.00
107Field office type C (642.5201)EACH1$15,950
108Traffic control drums (643.0300)DAY133,160$0.29
109Traffic control barricades type III (643.0420)DAY12,540$0.69
110Traffic control flexible tubular marker posts (643.0500)EACH1,657$14.27
111Traffic control flexible tubular marker bases (643.0600)EACH1,657$9.39
112Traffic control warning lights type A (643.0705)DAY25,080$0.12
113Traffic control warning lights type C (643.0715)DAY10,590$0.19
114Traffic control connected arrow boards (643.0810)DAY252$15.44
115Traffic control signs (643.0900)DAY20,608$0.63
116Traffic control covering signs type II (643.0920)EACH42$87.15
117Traffic control signs fixed message (643.1000)SF36$26.13
118Traffic control connected work zone start and end location markers (643.1220)DAY696$5.96
119Temporary marking line paint 6- inch (643.3165)LF331,220$0.15
120Temporary marking line removable tape 6-inch (643.3180)LF2,400$3.00
121Temporary marking line paint 10- inch (643.3265)LF480$0.30
122Temporary marking stop line removable tape 18-inch (643.3850)LF290$12.07
123Traffic control (643.5000)EACH1$25,774
124Geotextile type HR (645.0120)SY190$7.84
125Marking line grooved black epoxy 6-inch (646.2025)LF20,400$0.75
126Marking line grooved wet ref epoxy 6-inch (646.2040)LF216,400$1.25
127Marking line grooved wet ref epoxy 10-inch (646.4040)LF7,830$2.40
128Marking arrow epoxy (646.5020)EACH164$330.00
129Marking word epoxy (646.5120)EACH24$430.00
130Marking aerial enforcement bar epoxy (646.5420)EACH20$200.00
131Marking stop line epoxy 18-inch (646.6120)LF650$24.00
132Marking diagonal epoxy 12-inch (646.7120)LF5,060$9.50
133Marking curb epoxy (646.8120)LF680$9.00
134Marking island nose epoxy (646.8220)EACH17$330.00
135Marking removal line 4-inch (646.9000)LF52,070$0.22
136Marking removal line 8-inch (646.9100)LF3,000$0.44
137Marking removal line wide (646.9200)LF300$0.75
138Marking removal special marking (646.9300)EACH33$100.00
139Construction staking storm sewer (650.4000)EACH37$45.00
140Construction staking subgrade (650.4500)LF2,555$0.01
141Construction staking base (650.5000)LF2,475$0.55
142Construction staking curb gutter and curb & gutter (650.5500)LF12,625$0.65
143Construction staking concrete pavement (650.7000)LF80$4.00
144Construction staking concrete barrier (650.7500)LF120$4.00
145Construction staking resurfacing reference (650.8000)LF79,840$0.87
146Construction staking supplemental control (project) 01. 1600-15-70 (650.9911)EACH1$10.00
147Construction staking slope stakes (650.9920)LF9,050$0.38
148Sawing asphalt (690.0150)LF8,300$1.30
149Sawing concrete (690.0250)LF600$2.25
150Incentive strength concrete barrier (715.0603)DOL90$1.00
151Incentive iri ride (740.0440)DOL62,298$1.00
152Maintaining climbing turtle exclusion fence (999.2105.S)LF2,000$1.50
153On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,100$5.00
154On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,800$5.00
155Special 01. maintaining bat deterrent system station 336+00 (SPV.0060)EACH1$5,250.00
156Special 01. concrete curb & gutter 6-inch sloped 20-inch type J special (SPV.0090)LF140$75.00
157Special 02. maintaining exclusion fence (SPV.0090)LF1,330$8.00
158Special 03. installing and maintaining silt fence on turtle exclusion fence (SPV.0090)LF270$6.00
159Special 04. filling existing rumble strips (SPV.0090)LF240$13.50
WisDOT contract 20251209031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy