| 1 | Removing small pipe culverts (203.0100) | EACH | 2 | $800.00 | $625.78 |
| 2 | Removing concrete pavement (204.0100) | SY | 207 | $25.00 | $24.96 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 1,523 | $15.00 | $3.06 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 84,824 | $0.01 | $0.50 |
| 5 | Removing guardrail (204.0165) | LF | 857 | $2.25 | $2.25 |
| 6 | Removing (item description) 01. inlet covers (204.9060.S) | EACH | 1 | $1,500.00 | $208.97 |
| 7 | Excavation common (205.0100) | CY | 530 | $20.00 | $20.38 |
| 8 | Backfill granular grade 2 (209.2500) | TON | 795 | $26.00 | $15.38 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 3601-00-74 (211.0101) | EACH | 1 | $150.00 | $0.01 |
| 10 | Prepare foundation for concrete pavement (project) 01. 3601-00-74 (211.0201) | EACH | 1 | $150.00 | $0.01 |
| 11 | Finishing roadway (project) 01. 3601-00-74 (213.0100) | EACH | 1 | $375.00 | $5,508.70 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,256 | $35.00 | $11.88 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,135 | $22.00 | $19.78 |
| 14 | Concrete pavement 8-inch (415.0080) | SY | 92 | $100.00 | $100.00 |
| 15 | Concrete pavement approach slab (415.0410) | SY | 109 | $266.40 | $266.40 |
| 16 | Tack coat (455.0605) | GAL | 10,130 | $0.01 | $3.48 |
| 17 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $1,500.00 | $3,500.00 |
| 18 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $1,500.00 | $3,500.00 |
| 19 | Incentive density PWL HMA pavement (460.2005) | DOL | 12,350 | $1.00 | $1.00 |
| 20 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,420 | $1.00 | $1.00 |
| 21 | Incentive air voids HMA pavement (460.2010) | DOL | 16,540 | $1.00 | $1.00 |
| 22 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 16,540 | $70.00 | $68.16 |
| 23 | Asphaltic surface (465.0105) | TON | 60 | $135.00 | $166.53 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 186 | $175.00 | $133.87 |
| 25 | Asphaltic rumble strips, centerline (465.0560) | LF | 18,679 | $0.75 | $0.27 |
| 26 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 70 | $200.00 | $117.03 |
| 27 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 4 | $2,750.00 | $1,004.55 |
| 28 | Concrete surface drains (602.3010) | CY | 2.50 | $850.00 | $850.00 |
| 29 | Inlet covers type V (611.0654) | EACH | 1 | $1,000.00 | $1,304.07 |
| 30 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $2,625.00 | $3,180.16 |
| 31 | MGS guardrail 3 (614.2300) | LF | 487.50 | $27.00 | $27.00 |
| 32 | MGS thrie beam transition (614.2500) | LF | 151.35 | $92.00 | $92.00 |
| 33 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,600.00 | $3,600.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 3601-00-74 (618.0100) | EACH | 1 | $250.00 | $0.01 |
| 35 | Mobilization (619.1000) | EACH | 1 | $4,000.00 | $71,678 |
| 36 | Water (624.0100) | MGAL | 14 | $35.00 | $0.01 |
| 37 | Topsoil (625.0100) | SY | 400 | $18.00 | $11.57 |
| 38 | Silt fence (628.1504) | LF | 381 | $2.00 | $2.00 |
| 39 | Silt fence maintenance (628.1520) | LF | 381 | $0.05 | $0.05 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 2 | $180.00 | $180.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $270.00 | $270.00 |
| 42 | Erosion mat class I type B (628.2004) | SY | 400 | $1.00 | $1.00 |
| 43 | Inlet protection type B (628.7010) | EACH | 2 | $50.00 | $50.00 |
| 44 | Temporary ditch checks (628.7504) | LF | 158 | $8.50 | $8.50 |
| 45 | Culvert pipe checks (628.7555) | EACH | 19 | $22.50 | $22.50 |
| 46 | Fertilizer type B (629.0210) | CWT | 0.30 | $270.00 | $270.00 |
| 47 | Seeding mixture no. 30 (630.0130) | LB | 11 | $45.00 | $45.00 |
| 48 | Seed water (630.0500) | MGAL | 7 | $25.00 | $25.00 |
| 49 | Markers culvert end (633.5200) | EACH | 4 | $55.00 | $55.00 |
| 50 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 1 | $112.50 | $112.50 |
| 51 | Moving signs type II (638.2102) | EACH | 2 | $90.00 | $90.00 |
| 52 | Moving small sign supports (638.4000) | EACH | 2 | $45.00 | $45.00 |
| 53 | Field office type C (642.5201) | EACH | 1 | $4,175.00 | $5,000.00 |
| 54 | Traffic control drums (643.0300) | DAY | 120 | $2.00 | $2.00 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 1,208 | $1.00 | $1.00 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 2,416 | $0.20 | $0.20 |
| 57 | Traffic control signs (643.0900) | DAY | 14,168 | $0.10 | $0.10 |
| 58 | Traffic control covering signs type I (643.0910) | EACH | 4 | $300.00 | $300.00 |
| 59 | Traffic control covering signs type II (643.0920) | EACH | 13 | $22.00 | $22.00 |
| 60 | Traffic control signs PCMS (643.1050) | DAY | 14 | $80.00 | $80.00 |
| 61 | Temporary marking line paint 6- inch (643.3165) | LF | 89,384 | $0.21 | $0.21 |
| 62 | Traffic control (643.5000) | EACH | 1 | $15,000 | $15,000 |
| 63 | Marking line epoxy 6-inch (646.2020) | LF | 837 | $0.65 | $0.65 |
| 64 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 88,036 | $1.25 | $1.25 |
| 65 | Marking line epoxy 10-inch (646.4020) | LF | 47 | $1.14 | $1.14 |
| 66 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 655 | $2.30 | $2.30 |
| 67 | Marking line same day epoxy 6- inch (646.4720) | LF | 255 | $8.00 | $8.00 |
| 68 | Marking arrow epoxy (646.5020) | EACH | 6 | $255.00 | $255.00 |
| 69 | Marking word epoxy (646.5120) | EACH | 2 | $265.00 | $265.00 |
| 70 | Marking stop line epoxy 18-inch (646.6120) | LF | 85 | $17.00 | $17.00 |
| 71 | Marking diagonal epoxy 12-inch (646.7120) | LF | 551 | $12.00 | $12.00 |
| 72 | Marking removal line water blasting 6-inch (646.9012) | LF | 451 | $1.00 | $1.00 |
| 73 | Construction staking pipe culverts (650.6000) | EACH | 2 | $350.00 | $125.00 |
| 74 | Construction staking concrete pavement (650.7000) | LF | 50 | $0.01 | $1.00 |
| 75 | Construction staking resurfacing reference (650.8000) | LF | 23,900 | $0.20 | $0.12 |
| 76 | Construction staking supplemental control (project) 01. 3601-00-74 (650.9911) | EACH | 1 | $1,200.00 | $3,000.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 520 | $2.50 | $2.50 |
| 78 | Public land reference monument verify and reset (680.0100) | EACH | 4 | $420.00 | $1,000.00 |
| 79 | Sawing asphalt (690.0150) | LF | 626 | $0.10 | $1.39 |
| 80 | Sawing concrete (690.0250) | LF | 324 | $2.25 | $2.15 |
| 81 | Incentive iri ride (740.0440) | DOL | 17,900 | $1.00 | $1.00 |
| 82 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 425 | $5.00 | $5.00 |
| 83 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 350 | $5.00 | $5.00 |