| 1 | Removing small pipe culverts (203.0100) | EACH | 12 | $400.00 | $400.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 6,072 | $4.95 | $15.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 90 | $3.65 | $18.50 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 91,838 | $0.90 | $0.85 |
| 5 | Removing delineators and markers (204.0180) | EACH | 24 | $10.00 | $10.00 |
| 6 | Excavation common (205.0100) | CY | 6,005 | $13.85 | $13.81 |
| 7 | Backfill granular grade 2 (209.2500) | TON | 6,461 | $17.00 | $17.14 |
| 8 | Prepare foundation for asphaltic paving (project) 01. 6070-01-63 (211.0101) | EACH | 1 | $39,255 | $14,644 |
| 9 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 319 | $8.25 | $57.50 |
| 10 | Finishing roadway (project) 01. 6070-01-63 (213.0100) | EACH | 1 | $3,150.00 | $3,831.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 160 | $38.00 | $28.40 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 940 | $29.40 | $19.44 |
| 13 | Shaping shoulders (305.0500) | STA | 494 | $25.00 | $22.00 |
| 14 | Select crushed material (312.0110) | TON | 950 | $29.40 | $17.83 |
| 15 | Tack coat (455.0605) | GAL | 12,187 | $3.00 | $3.20 |
| 16 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,125.00 | $2,612.00 |
| 17 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $2,875.00 | $2,883.00 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 1,150 | $1.00 | $1.00 |
| 19 | Incentive density PWL HMA pavement (460.2005) | DOL | 12,680 | $1.00 | $1.00 |
| 20 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,970 | $1.00 | $1.00 |
| 21 | Incentive air voids HMA pavement (460.2010) | DOL | 12,680 | $1.00 | $1.00 |
| 22 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 9,513 | $68.70 | $77.60 |
| 23 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 11,318 | $75.90 | $79.90 |
| 24 | Asphaltic surface (465.0105) | TON | 395 | $124.50 | $209.45 |
| 25 | Asphaltic surface patching (465.0110) | TON | 505 | $105.00 | $142.40 |
| 26 | Asphaltic surface driveways and field entrances (465.0120) | TON | 185 | $124.50 | $157.00 |
| 27 | Asphaltic rumble strips, shoulder sinusoidal (465.0525) | LF | 43,770 | $0.15 | $0.16 |
| 28 | Asphaltic rumble strips, centerline sinusoidal (465.0565) | LF | 21,100 | $0.20 | $0.23 |
| 29 | Asphaltic rumble strips, transverse (465.0580) | SY | 99 | $25.20 | $81.08 |
| 30 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 172 | $155.00 | $152.84 |
| 31 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 102 | $210.00 | $190.36 |
| 32 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 6 | $1,290.00 | $1,288.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $1,800.00 | $1,794.00 |
| 34 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 88 | $215.00 | $209.94 |
| 35 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 34X53-inch (522.2334) | LF | 70 | $275.00 | $265.43 |
| 36 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 66 | $200.00 | $192.44 |
| 37 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 94 | $285.00 | $281.02 |
| 38 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 4 | $1,495.00 | $1,493.00 |
| 39 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 6 | $2,115.00 | $2,111.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $2,575.00 | $2,507.00 |
| 41 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 2 | $6,970.00 | $6,970.00 |
| 42 | Riprap light (606.0100) | CY | 70 | $90.00 | $90.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 6070-01-63 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 44 | Mobilization (619.1000) | EACH | 1 | $172,450 | $59,000 |
| 45 | Dust control surface treatment (623.0200) | SY | 23,751 | $0.01 | $0.08 |
| 46 | Water (624.0100) | MGAL | 60.60 | $50.00 | $50.00 |
| 47 | Topsoil (625.0100) | SY | 5,680 | $2.40 | $2.36 |
| 48 | Silt fence (628.1504) | LF | 1,620 | $1.90 | $1.90 |
| 49 | Silt fence maintenance (628.1520) | LF | 1,620 | $0.10 | $0.10 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 5 | $150.00 | $150.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $250.00 | $250.00 |
| 52 | Erosion mat class I type A (628.2002) | SY | 5,680 | $1.10 | $1.10 |
| 53 | Inlet protection type B (628.7010) | EACH | 4 | $60.00 | $60.00 |
| 54 | Culvert pipe checks (628.7555) | EACH | 73 | $30.00 | $30.00 |
| 55 | Fertilizer type B (629.0210) | CWT | 3.40 | $100.00 | $100.00 |
| 56 | Seeding mixture no. 20 (630.0120) | LB | 260 | $9.00 | $9.00 |
| 57 | Seeding temporary (630.0200) | LB | 160 | $3.50 | $3.50 |
| 58 | Seed water (630.0500) | MGAL | 63.90 | $10.00 | $10.00 |
| 59 | Markers culvert end (633.5200) | EACH | 24 | $55.00 | $55.00 |
| 60 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 12 | $90.00 | $90.00 |
| 61 | Moving signs type II (638.2102) | EACH | 11 | $75.00 | $75.00 |
| 62 | Removing small sign supports (638.3000) | EACH | 12 | $20.00 | $20.00 |
| 63 | Field office type C (642.5201) | EACH | 1 | $11,750 | $12,268 |
| 64 | Traffic control barricades type III (643.0420) | DAY | 2,580 | $0.45 | $0.83 |
| 65 | Traffic control warning lights type A (643.0705) | DAY | 5,160 | $0.15 | $0.21 |
| 66 | Traffic control signs (643.0900) | DAY | 28,575 | $0.15 | $0.62 |
| 67 | Traffic control covering signs type II (643.0920) | EACH | 7 | $110.00 | $86.29 |
| 68 | Traffic control signs PCMS (643.1050) | DAY | 28 | $45.00 | $90.84 |
| 69 | Traffic control speed feedback trailer (643.1500) | DAY | 180 | $8.00 | $25.61 |
| 70 | Temporary marking line paint 6- inch (643.3165) | LF | 78,562 | $0.27 | $0.33 |
| 71 | Temporary marking line paint 10- inch (643.3265) | LF | 1,080 | $1.00 | $0.75 |
| 72 | Temporary marking arrow paint (643.3505) | EACH | 9 | $140.00 | $210.00 |
| 73 | Temporary marking word paint (643.3605) | EACH | 4 | $250.00 | $230.00 |
| 74 | Temporary marking stop line paint 18-inch (643.3805) | LF | 145 | $3.70 | $9.00 |
| 75 | Traffic control (643.5000) | EACH | 1 | $35,500 | $10,939 |
| 76 | Geotextile type R (645.0130) | SY | 200 | $6.00 | $5.57 |
| 77 | Marking line epoxy 6-inch (646.2020) | LF | 876 | $0.48 | $0.85 |
| 78 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 77,020 | $1.30 | $1.32 |
| 79 | Marking line epoxy 10-inch (646.4020) | LF | 94 | $1.25 | $1.45 |
| 80 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,022 | $2.78 | $2.75 |
| 81 | Marking arrow epoxy (646.5020) | EACH | 9 | $337.00 | $230.00 |
| 82 | Marking word epoxy (646.5120) | EACH | 4 | $381.66 | $340.00 |
| 83 | Marking stop line paint 18-inch (646.6105) | LF | 68 | $9.70 | $10.00 |
| 84 | Marking stop line epoxy 18-inch (646.6120) | LF | 136 | $15.80 | $15.00 |
| 85 | Marking curb epoxy (646.8120) | LF | 293 | $7.57 | $8.00 |
| 86 | Marking island nose epoxy (646.8220) | EACH | 10 | $284.40 | $250.00 |
| 87 | Locating no-passing zones (648.0100) | MI | 4.69 | $520.00 | $660.00 |
| 88 | Construction staking pipe culverts (650.6000) | EACH | 12 | $125.00 | $125.00 |
| 89 | Construction staking resurfacing reference (650.8000) | LF | 24,747 | $0.14 | $0.14 |
| 90 | Construction staking supplemental control (project) 01. 6070-01-63 (650.9911) | EACH | 1 | $475.00 | $475.00 |
| 91 | Construction staking slope stakes (650.9920) | LF | 1,200 | $0.95 | $0.95 |
| 92 | Sawing asphalt (690.0150) | LF | 2,029 | $1.39 | $1.40 |
| 93 | Incentive iri ride (740.0440) | DOL | 18,770 | $1.00 | $1.00 |
| 94 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 |
| 95 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 | $5.00 |
| 96 | Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 48X76-inc (SPV.0090) | LF | 48 | $525.00 | $520.13 |
| 97 | Special 02. culvert pipe reinforced concrete horizontal elliptical class HE-IV 38X60-inc (SPV.0090) | LF | 54 | $345.00 | $338.09 |
| 98 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 2,720 | $7.20 | $5.05 |