WisDOT contract 20260113020 bid tabulation

Elkhorn - Richmond; CTH Nn to Sheridan Springs (USH 012, Walworth County Elkhorn - Richmond). Let by Wisconsin DOT on January 13, 2026, Walworth. 2 bids received; low bid $1,290,153 by Highway Landscapers, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
52
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Highway Landscapers, Inc.$1,290,153Low
2James Peterson Sons, Inc.$1,400,418+9.0%
WisDOT contract 20260113020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Highway Landscapers, Inc.2. James Peterson Sons, Inc.
1Removing (item description) .01 apron endwalls (204.9060.S)EACH7$250.00$350.00
2Excavation common (205.0100)CY115$30.00$19.50
3Borrow (208.0100)CY12,291$10.00$19.50
4Concrete collars for pipe (520.8000)EACH7$750.00$750.00
5Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF32$225.00$340.00
6Inlet covers type MS (611.0642)EACH12$700.00$550.00
7Inlets median 1 grate (611.3901)EACH2$3,000.00$2,620.00
8Inlets median 2 grate (611.3902)EACH5$4,000.00$3,045.00
9Cable barrier type 1 (613.1100.S)LF7,378$34.87$41.90
10Cable barrier end terminal type 1 (613.1200.S)EACH6$7,350.00$7,500.00
11Guardrail mow strip emulsified asphalt (614.0397)SY6,464$9.00$7.77
12MGS guardrail 3 (614.2300)LF8,525$28.00$27.00
13MGS thrie beam transition (614.2500)LF157.60$90.00$90.00
14MGS guardrail terminal eat (614.2610)EACH5$4,800.00$3,400.00
15MGS guardrail terminal type 2 (614.2620)EACH6$3,000.00$3,000.00
16Mobilization (619.1000)EACH1$104,000$68,000
17Topsoil (625.0100)SY47,501$1.00$2.00
18Mulching (627.0200)SY47,501$0.01$0.25
19Silt fence (628.1504)LF1,619$2.00$2.00
20Silt fence maintenance (628.1520)LF1,619$0.01$0.10
21Mobilizations erosion control (628.1905)EACH8$250.00$100.00
22Mobilizations emergency erosion control (628.1910)EACH2$1.00$150.00
23Erosion mat urban class I type B (628.2008)SY47,501$1.30$1.35
24Soil stabilizer type B (628.6510)ACRE8$1.00$550.00
25Inlet protection type A (628.7005)EACH9$175.00$125.00
26Temporary ditch checks (628.7504)LF3,935$2.00$7.50
27Culvert pipe checks (628.7555)EACH50$10.00$20.00
28Fertilizer type B (629.0210)CWT30$50.00$70.00
29Seeding mixture no. 30 (630.0130)LB855$12.00$8.00
30Seeding temporary (630.0200)LB1,283$1.00$3.00
31Seed water (630.0500)MGAL1,067$0.01$1.00
32Posts wood 4X6-inch X 18-FT (634.0618)EACH8$50.00$75.00
33Signs type II reflective H (637.2210)SF40$15.00$25.00
34Signs type II reflective F (637.2230)SF40$15.00$25.00
35Moving signs type II (638.2102)EACH8$50.00$75.00
36Removing signs type II (638.2602)EACH2$50.00$25.00
37Removing small sign supports (638.3000)EACH4$50.00$25.00
38Field office type D (642.5401)EACH1$6,500.00$12,500
39Traffic control drums (643.0300)DAY41,613$0.30$0.30
40Traffic control barricades type III (643.0420)DAY198$1.80$1.80
41Traffic control warning lights type A (643.0705)DAY396$0.52$0.52
42Traffic control warning lights type C (643.0715)DAY3,361$0.31$0.31
43Traffic control connected arrow boards (643.0810)DAY198$10.10$10.10
44Traffic control signs (643.0900)DAY1,782$0.76$0.76
45Traffic control connected work zone start and end location markers (643.1220)DAY158$26.33$26.33
46Temporary marking line epoxy 6- inch (643.3170)LF4,200$2.20$2.20
47Traffic control interim lane closure (643.4100)EACH4$2,564.76$2,564.76
48Traffic control (643.5000)EACH1$99,350$9,263.78
49Marking line grooved wet ref epoxy 4-inch (646.1040)LF58,180$0.95$0.95
50On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS750$5.00$5.00
51On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,800$5.00$5.00
52Special .01 section corner monuments (SPV.0060)EACH1$1,500.00$1,500.00
WisDOT contract 20260113020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy