WisDOT contract 20260113034 bid tabulation

Shawano - STH 29; STH 22 to Whitnee Way (CTH BE, Shawano County Shawano - STH 29). Let by Wisconsin DOT on January 13, 2026, Shawano. 1 bid received; low bid $1,882,425 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
68
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$1,882,425Low
WisDOT contract 20260113034: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc
1Removing asphaltic surface (204.0110)SY27$10.00
2Removing asphaltic surface butt joints (204.0115)SY691$5.70
3Removing asphaltic surface milling (204.0120)SY106,846$1.00
4Removing curb & gutter (204.0150)LF84$20.00
5Excavation common (205.0100)CY832$30.00
6Prepare foundation for asphaltic paving (project) 01. 9295-00-70 (211.0101)EACH1$12,430
7Finishing roadway (project) 01. 9295-00-70 (213.0100)EACH1$2,500.00
8Base aggregate dense 3/4-inch (305.0110)TON2,418$26.10
9Select crushed material (312.0110)TON600$13.40
10Rubblizing (335.0100)SY13,563$2.30
11Tack coat (455.0605)GAL7,515$2.00
12HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$2,980.00
13HMA percent within limits (PWL) test strip density (460.0110.S)EACH3$3,870.00
14Incentive density HMA pavement (460.2000)DOL2,340$1.00
15Incentive density PWL HMA pavement (460.2005)DOL10,754$1.00
16Incentive density HMA pavement longitudinal joints (460.2007)DOL6,100$1.00
17Incentive air voids HMA pavement (460.2010)DOL14,538$1.00
18HMA pavement 3 LT 58-28 S (460.5223)TON3,646$60.20
19HMA pavement 4 LT 58-28 S (460.5224)TON14,538$64.80
20Asphaltic surface patching (465.0110)TON9$296.00
21Asphaltic surface driveways and field entrances (465.0120)TON196$183.00
22Asphaltic rumble strips, centerline (465.0560)LF24,575$0.46
23Asphaltic rumble strips, transverse (465.0580)SY105$52.60
24Culvert pipe liners (size) 01. 24- inch (520.9700.S)LF135$158.72
25Culvert pipe liners (size) 02. 30- inch (520.9700.S)LF120$213.48
26Cleaning culvert pipes for liner verification (520.9750.S)EACH2$1,250.00
27Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF84$75.00
28Riprap medium (606.0200)CY5$300.00
29Maintenance and repair of haul roads (project) 01. 9295-00-70 (618.0100)EACH1$1.00
30Mobilization (619.1000)EACH1$98,760
31Water (624.0100)MGAL48$45.00
32Topsoil (625.0100)SY1,545$0.01
33Silt fence (628.1504)LF829$1.50
34Silt fence maintenance (628.1520)LF1,658$0.01
35Mobilizations erosion control (628.1905)EACH3$0.01
36Mobilizations emergency erosion control (628.1910)EACH3$0.01
37Erosion mat urban class I type A (628.2006)SY1,545$0.01
38Culvert pipe checks (628.7555)EACH98$2.00
39Rock bags (628.7570)EACH17$50.00
40Fertilizer type B (629.0210)CWT0.40$1.00
41Seeding mixture no. 30 (630.0130)LB27$1.00
42Seed water (630.0500)MGAL14$0.01
43Posts wood 4X6-inch X 12-FT (634.0612)EACH2$100.00
44Moving signs type II (638.2102)EACH2$45.00
45Moving small sign supports (638.4000)EACH2$50.00
46Field office type C (642.5201)EACH1$9,870.00
47Traffic control barricades type III (643.0420)DAY2,756$1.00
48Traffic control warning lights type A (643.0705)DAY5,194$0.20
49Traffic control signs (643.0900)DAY12,243$0.55
50Traffic control covering signs type II (643.0920)EACH3$20.00
51Traffic control signs PCMS (643.1050)DAY14$70.00
52Traffic control (643.5000)EACH1$3,000.00
53Geotextile type HR (645.0120)SY6$100.00
54Geogrid type SR (645.0220)SY800$2.48
55Marking line grooved wet ref epoxy 6-inch (646.2040)LF90,735$1.17
56Marking line grooved wet ref epoxy 10-inch (646.4040)LF155$2.30
57Marking stop line epoxy 18-inch (646.6120)LF41$17.00
58Marking curb epoxy (646.8120)LF20$10.00
59Construction staking base (650.5000)LF589$2.00
60Construction staking curb gutter and curb & gutter (650.5500)LF114$4.00
61Construction staking resurfacing reference (650.8000)LF26,329$0.09
62Construction staking supplemental control (project) 01. 9295-00-70 (650.9911)EACH1$446.98
63Construction staking slope stakes (650.9920)LF589$2.00
64Sawing asphalt (690.0150)LF1,079$1.74
65Incentive iri ride (740.0440)DOL21,950$1.00
66On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00
67On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,260$5.00
68Special 01. concrete curb & gutter 24-inch type D (SPV.0090)LF30$100.00
WisDOT contract 20260113034: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy