WisDOT contract 20260113040 bid tabulation

Chippewa Falls - Abbotsford; 320th St to Koser Ave EB & Wb (STH 029, Chippewa County Chippewa Falls - Abbotsford). Let by Wisconsin DOT on January 13, 2026, Chippewa. 2 bids received; low bid $9,349,585 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
152
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$9,349,585Low
2Monarch Paving Company$10,121,727+8.0%
WisDOT contract 20260113040: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Monarch Paving Company
1Clearing (201.0110)SY90$25.00$25.00
2Grubbing (201.0210)SY90$1.00$1.00
3Removing structure (structure) 01. B-09-29 (203.0220)EACH1$80,000$80,000
4Removing concrete pavement (204.0100)SY360$35.00$35.00
5Removing concrete pavement butt joints (204.0105)SY6,960$6.54$9.85
6Removing concrete surface partial depth (204.0109.S)SF255,600$0.42$0.46
7Removing asphaltic surface (204.0110)SY425$9.50$9.50
8Removing asphaltic surface butt joints (204.0115)SY3,290$5.67$6.48
9Removing asphaltic surface milling (204.0120)SY22,630$4.58$5.33
10Removing asphaltic longitudinal notched wedge joint milling (204.0126.S)LF77,800$1.59$0.85
11Removing curb (204.0130)LF180$9.15$9.15
12Removing curb & gutter (204.0150)LF1,100$9.15$9.15
13Removing guardrail (204.0165)LF2,360$2.95$2.95
14Removing surface drains (204.0190)EACH8$365.00$365.00
15Removing (item description) 01. apron endwalls for culvert pipe (204.9060.S)EACH16$185.00$185.00
16Excavation common (205.0100)CY1,685$14.50$14.50
17Grading shaping and finishing intersection (location) 01. 345TH ST (205.9016.S)EACH1$6,900.00$6,900.00
18Excavation for structures culverts (structure) 01. B-9-29 (206.2001)EACH1$10,000$10,000
19Cofferdams (structure) 01. B-9-29 (206.5001)EACH1$50,000$50,000
20Backfill structure type B (210.2500)TON200$25.00$25.00
21Prepare foundation for asphaltic paving (project) 01. 1050-00-60 (211.0101)EACH1$9,780.93$220,145
22Finishing roadway (project) 01. 1050-00-60 (213.0100)EACH1$4,557.41$6,141.59
23Base aggregate dense 3/4-inch (305.0110)TON10,750$22.20$25.24
24Base aggregate dense 1 1/4-inch (305.0120)TON294$42.50$42.50
25Breaker run (311.0110)TON45$125.00$125.00
26Concrete pavement 6-inch (415.0060)SY40$89.76$89.76
27Concrete pavement 12-inch (415.0120)SY72$112.47$112.47
28Concrete pavement approach slab (415.0410)SY176$223.88$223.88
29Drilled tie bars (416.0610)EACH1,926$8.53$8.53
30Drilled dowel bars (416.0620)EACH8,693$12.80$12.80
31Concrete pavement repair (416.1710)SY5,212$91.53$91.53
32Concrete pavement replacement (416.1720)SY1,460$91.53$91.53
33Tack coat (455.0605)GAL34,990$3.04$2.25
34HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$3,500.00$3,500.00
35HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$3,500.00$3,500.00
36HMA pavement test strip volumetrics (460.0115.S)EACH1$3,500.00$3,500.00
37HMA pavement test strip density (460.0120.S)EACH2$3,500.00$3,500.00
38Incentive density HMA pavement (460.2000)DOL18,460$1.00$1.00
39Incentive density PWL HMA pavement (460.2005)DOL17,150$1.00$1.00
40Incentive density HMA pavement longitudinal joints (460.2007)DOL13,120$1.00$1.00
41Incentive air voids HMA pavement (460.2010)DOL33,750$1.00$1.00
42HMA pavement 4 MT 58-34 S (460.6244)TON33,742$86.47$90.58
43HMA pavement 4 SMA 58-34 V (460.8644)TON28,830$95.48$99.99
44Material transfer vehicle (460.9000.S)EACH1$0.01$38,000
45Asphaltic surface (465.0105)TON1,136$142.04$172.60
46Asphaltic surface patching (465.0110)TON400$142.04$147.12
47Asphaltic rumble strips, shoulder divided roadway (465.0510)LF138,600$0.13$0.27
48Concrete masonry culverts (504.0100)CY33$1,500.00$1,500.00
49Bar steel reinforcement HS coated structures (505.0600)LB2,880$3.60$3.60
50Concrete surface repair (509.1500)SF80$150.00$150.00
51Temporary shoring (structure) 01. B-09-0029 (511.1200)SF550$50.00$50.00
52Rubberized membrane waterproofing (516.0500)SY19$25.00$25.00
53Concrete collars for pipe (520.8000)EACH6$1,000.00$1,000.00
54Cleaning culvert pipes (520.8700)EACH31$985.00$985.00
55Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH12$1,765.00$1,765.00
56Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH4$2,030.00$2,030.00
57Culvert pipe salvaged 18-inch (524.0118)LF24$95.65$95.65
58Culvert pipe salvaged 24-inch (524.0124)LF64$113.85$113.85
59Culvert pipe salvaged 30-inch (524.0130)LF8$113.85$113.85
60Culvert pipe salvaged 48-inch (524.0148)LF16$113.85$113.85
61Apron endwalls for culvert pipe salvaged 18-inch (524.0618)EACH1$550.00$550.00
62Apron endwalls for culvert pipe salvaged 24-inch (524.0624)EACH5$550.00$550.00
63Apron endwalls for culvert pipe salvaged 30-inch (524.0630)EACH1$550.00$550.00
64Apron endwalls for culvert pipe salvaged 48-inch (524.0648)EACH1$650.00$650.00
65Concrete curb & gutter 30-inch type D (601.0411)LF139$38.56$38.56
66Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF152$38.56$38.56
67Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF818$40.07$40.07
68Concrete sidewalk 4-inch (602.0405)SF490$10.04$10.04
69Concrete surface drains (602.3010)CY38$1,142.14$1,142.14
70Riprap medium (606.0200)CY39$118.30$118.30
71Reconstructing inlets (611.0430)EACH2$2,250.00$2,250.00
72Barrier system grading shaping finishing (614.0010)EACH7$4,633.00$4,633.00
73MGS guardrail 3 (614.2300)LF1,550$23.05$23.05
74MGS thrie beam transition (614.2500)LF160$91.90$91.90
75MGS guardrail terminal eat (614.2610)EACH7$3,510.00$3,510.00
76MGS guardrail terminal type 2 (614.2620)EACH3$3,115.00$3,115.00
77Maintenance and repair of haul roads (project) 01. 1050-00-60 (618.0100)EACH1$0.01$1.00
78Mobilization (619.1000)EACH1$123,750$288,004
79Concrete median sloped nose (620.0300)SF389$11.19$11.19
80Water (624.0100)MGAL115$40.00$50.37
81Topsoil (625.0100)SY22,620$3.25$3.25
82Salvaged topsoil (625.0500)SY1,780$2.00$2.00
83Mulching (627.0200)SY22,000$0.40$0.40
84Silt fence (628.1504)LF7,089$1.90$1.90
85Silt fence maintenance (628.1520)LF7,089$0.01$0.01
86Mobilizations erosion control (628.1905)EACH6$660.00$660.00
87Mobilizations emergency erosion control (628.1910)EACH4$1.00$1.00
88Erosion mat urban class I type B (628.2008)SY2,390$1.85$1.85
89Inlet protection type A (628.7005)EACH5$185.00$185.00
90Temporary ditch checks (628.7504)LF90$8.00$8.00
91Culvert pipe checks (628.7555)EACH45$15.00$15.00
92Fertilizer type B (629.0210)CWT20$110.00$110.00
93Seeding mixture no. 20 (630.0120)LB1,094$12.00$12.00
94Seeding temporary (630.0200)LB664$5.00$5.00
95Seed water (630.0500)MGAL584$1.00$1.00
96Markers culvert end (633.5200)EACH124$58.00$58.00
97Posts wood 4X6-inch X 12-FT (634.0612)EACH6$91.00$90.00
98Signs type I reflective SH (637.1220)SF856$35.00$35.00
99Signs type II reflective SH (637.2220)SF13.50$24.75$24.75
100Moving signs type II (638.2102)EACH1$90.00$90.00
101Removing signs type I (638.2601)EACH11$300.00$300.00
102Removing signs type II (638.2602)EACH10$18.00$18.00
103Removing small sign supports (638.3000)EACH8$19.00$19.00
104Moving small sign supports (638.4000)EACH1$92.00$92.00
105Field office type B (642.5001)EACH1$10,150$16,188
106Traffic control drums (643.0300)DAY195,178$0.40$0.34
107Digital speed reduction system (DSRS) (643.0370.S)DAY334$125.00$158.89
108Traffic control barricades type III (643.0420)DAY1,478$0.50$0.94
109Traffic control warning lights type A (643.0705)DAY2,872$0.25$0.37
110Traffic control warning lights type C (643.0715)DAY13,864$0.35$0.23
111Traffic control connected arrow boards (643.0810)DAY334$18.00$17.05
112Traffic control signs (643.0900)DAY8,756$1.00$0.89
113Traffic control covering signs type I (643.0910)EACH10$800.00$301.62
114Traffic control covering signs type II (643.0920)EACH10$50.00$100.65
115Traffic control signs PCMS (643.1050)DAY14$150.00$62.13
116Traffic control connected work zone start and end location markers (643.1220)DAY334$10.00$13.66
117Temporary marking line paint 6- inch (643.3165)LF174,971$0.20$0.30
118Temporary marking line removable tape 6-inch (643.3180)LF2,920$2.00$3.29
119Temporary marking line paint 10- inch (643.3265)LF2,523$0.90$0.60
120Traffic control (643.5000)EACH1$40,000$48,065
121Geotextile type HR (645.0120)SY104$5.00$5.00
122Marking line epoxy 4-inch (646.1020)LF1,342$0.50$0.55
123Marking line grooved black epoxy 6-inch (646.2025)LF18,650$0.80$0.85
124Marking line grooved wet ref epoxy 6-inch (646.2040)LF151,950$1.23$1.30
125Marking line grooved permanent tape 6-inch (646.2050)LF18,650$6.82$7.50
126Marking line epoxy 8-inch (646.3020)LF281$0.90$1.10
127Marking line grooved wet ref epoxy 10-inch (646.4040)LF174$2.65$2.50
128Marking line grooved permanent tape 10-inch (646.4050)LF5,241$12.15$12.80
129Marking word epoxy (646.5120)EACH3$361.90$350.00
130Marking railroad crossing epoxy (646.5320)EACH6$3,507.50$2,000.00
131Marking aerial enforcement bar epoxy (646.5420)EACH45$355.05$190.00
132Marking stop line epoxy 18-inch (646.6120)LF120$14.99$18.00
133Marking chevron epoxy 24-inch (646.7220)LF639$24.60$11.00
134Marking curb epoxy (646.8120)LF134$7.20$11.00
135Marking island nose epoxy (646.8220)EACH4$269.65$350.00
136Marking removal line 6-inch (646.9002)LF880$2.00$2.00
137Construction staking subgrade (650.4500)LF156$0.01$0.01
138Construction staking base (650.5000)LF156$0.01$0.01
139Construction staking curb gutter and curb & gutter (650.5500)LF199$2.50$2.50
140Construction staking resurfacing reference (650.8000)LF80,223$0.05$0.05
141Construction staking sidewalk (project) 01. 1050-00-60 (650.9500)EACH1$69.03$69.03
142Construction staking supplemental control (project) 01. 1050-00-60 (650.9911)EACH1$304.70$304.70
143Construction staking slope stakes (650.9920)LF449$0.50$0.50
144Sawing asphalt (690.0150)LF3,493$1.75$1.75
145Sawing concrete (690.0250)LF22,273$2.35$2.35
146Incentive strength concrete structures (715.0502)DOL500$1.00$1.00
147Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00
148Incentive iri ride (740.0440)DOL56,516$1.00$1.00
149Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF580$6.75$6.75
150On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00
151On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,000$5.00$5.00
152Special 01. ditch cleaning (SPV.0180)SY394$9.25$9.25
WisDOT contract 20260113040: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy