| 1 | Grubbing (201.0205) | STA | 7 | $500.00 | $700.00 |
| 2 | Removing structure over waterway remove debris (structure) 01. C-59- 116 (203.0250) | EACH | 1 | $29,500 | $27,820 |
| 3 | Removing concrete pavement (204.0100) | SY | 707 | $7.25 | $4.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 141 | $10.00 | $9.13 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 136 | $43.60 | $2.50 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 174,999 | $0.70 | $2.50 |
| 7 | Removing curb & gutter (204.0150) | LF | 308 | $8.00 | $5.00 |
| 8 | Removing guardrail (204.0165) | LF | 4,330 | $3.50 | $1.55 |
| 9 | Removing inlets (204.0220) | EACH | 2 | $650.00 | $546.50 |
| 10 | Excavation common (205.0100) | CY | 512 | $25.00 | $49.00 |
| 11 | Excavation for structures bridges (structure) 01. B-59-322 (206.1001) | EACH | 1 | $18,026 | $26,500 |
| 12 | Backfill structure type A (210.1500) | TON | 284 | $26.35 | $39.00 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 4010-28-71 (211.0101) | EACH | 1 | $3,460.00 | $4,470.00 |
| 14 | Prepare foundation for asphaltic paving (project) 02. 4010-29-71 (211.0101) | EACH | 1 | $3,460.00 | $11,640 |
| 15 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 827 | $47.00 | $99.58 |
| 16 | Finishing roadway (project) 01. 4010-28-71 (213.0100) | EACH | 1 | $1,500.00 | $1.00 |
| 17 | Finishing roadway (project) 02. 4010-29-71 (213.0100) | EACH | 1 | $1,500.00 | $1.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,236 | $34.70 | $38.25 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 765 | $23.75 | $24.57 |
| 20 | Shaping shoulders (305.0500) | STA | 931 | $5.00 | $54.40 |
| 21 | Coloring concrete wisdot red (405.0100) | CY | 155 | $85.00 | $90.00 |
| 22 | Concrete pavement 8-inch (415.0080) | SY | 61 | $95.00 | $110.00 |
| 23 | Concrete pavement approach slab (415.0410) | SY | 103 | $325.00 | $265.00 |
| 24 | Concrete truck apron 12-inch (415.2010) | SY | 464 | $95.00 | $99.00 |
| 25 | Drilled tie bars (416.0610) | EACH | 101 | $11.00 | $10.00 |
| 26 | HMA cold weather paving (450.4000) | TON | 11,102 | $0.01 | $0.01 |
| 27 | Tack coat (455.0605) | GAL | 23,079 | $3.00 | $3.00 |
| 28 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,890.00 | $3,000.00 |
| 29 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,740.00 | $3,000.00 |
| 30 | Incentive density HMA pavement (460.2000) | DOL | 1,040 | $1.00 | $1.00 |
| 31 | Incentive density PWL HMA pavement (460.2005) | DOL | 28,510 | $1.00 | $1.00 |
| 32 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 18,060 | $1.00 | $1.00 |
| 33 | Incentive air voids HMA pavement (460.2010) | DOL | 42,800 | $1.00 | $1.00 |
| 34 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 25,561 | $59.90 | $63.85 |
| 35 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 17,823 | $65.10 | $65.60 |
| 36 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 1,024 | $107.00 | $75.30 |
| 37 | Asphaltic surface (465.0105) | TON | 521 | $118.00 | $121.50 |
| 38 | Asphaltic surface driveways and field entrances (465.0120) | TON | 10 | $165.00 | $86.00 |
| 39 | Asphaltic rumble strips, shoulder (465.0520) | LF | 78,071 | $0.29 | $0.18 |
| 40 | Asphaltic rumble strips, centerline (465.0560) | LF | 40,785 | $0.29 | $0.18 |
| 41 | Asphaltic rumble strips, transverse (465.0580) | SY | 25 | $38.90 | $440.00 |
| 42 | Concrete masonry bridges (502.0100) | CY | 357 | $870.00 | $870.00 |
| 43 | Protective surface treatment (502.3200) | SY | 473 | $4.80 | $4.80 |
| 44 | Pigmented surface sealer (502.3210) | SY | 100 | $12.00 | $12.00 |
| 45 | Prestressed girder type I 36W-inch (503.0137) | LF | 236 | $290.00 | $290.00 |
| 46 | Bar steel reinforcement HS structures (505.0400) | LB | 5,130 | $1.16 | $1.16 |
| 47 | Bar steel reinforcement HS coated structures (505.0600) | LB | 46,110 | $1.26 | $1.26 |
| 48 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,430 | $3.90 | $3.90 |
| 49 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 8 | $120.00 | $120.00 |
| 50 | Steel diaphragms (structure) 01. B- 59-322 (506.4000) | EACH | 3 | $1,600.00 | $1,600.00 |
| 51 | Rubberized membrane waterproofing (516.0500) | SY | 25 | $61.00 | $61.00 |
| 52 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 324 | $22.00 | $22.00 |
| 53 | Concrete curb & gutter 4-inch sloped 30-inch type T (601.0583) | LF | 312 | $27.00 | $35.00 |
| 54 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 86 | $65.00 | $75.00 |
| 55 | Concrete surface drains (602.3010) | CY | 3 | $1,250.00 | $1,500.00 |
| 56 | Riprap medium (606.0200) | CY | 35 | $115.00 | $129.43 |
| 57 | Riprap heavy (606.0300) | CY | 433 | $97.00 | $110.00 |
| 58 | Inlet covers type T (611.0652) | EACH | 2 | $1,250.00 | $1,068.49 |
| 59 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 210 | $10.00 | $6.40 |
| 60 | Barrier system grading shaping finishing (614.0010) | EACH | 12 | $4,529.91 | $1,001.00 |
| 61 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $330.00 | $330.00 |
| 62 | Steel thrie beam structure approach (614.0200) | LF | 21 | $99.00 | $88.10 |
| 63 | Steel plate beam guard class A (614.0305) | LF | 19 | $28.00 | $38.00 |
| 64 | Steel plate beam guard short radius (614.0345) | LF | 56 | $40.00 | $35.50 |
| 65 | Steel plate beam guard short radius terminal (614.0390) | EACH | 1 | $2,750.00 | $2,150.00 |
| 66 | MGS guardrail 3 (614.2300) | LF | 3,238 | $29.00 | $27.10 |
| 67 | MGS thrie beam transition (614.2500) | LF | 195 | $97.00 | $93.00 |
| 68 | MGS guardrail terminal eat (614.2610) | EACH | 11 | $4,950.00 | $3,695.00 |
| 69 | Maintenance and repair of haul roads (project) 01. 4010-28-71 (618.0100) | EACH | 1 | $10.00 | $1.00 |
| 70 | Maintenance and repair of haul roads (project) 02. 4010-29-71 (618.0100) | EACH | 1 | $10.00 | $1.00 |
| 71 | Mobilization (619.1000) | EACH | 1 | $374,120 | $341,000 |
| 72 | Water (624.0100) | MGAL | 40.60 | $65.00 | $70.00 |
| 73 | Silt fence (628.1504) | LF | 6,852 | $2.00 | $1.61 |
| 74 | Silt fence maintenance (628.1520) | LF | 6,852 | $0.01 | $0.05 |
| 75 | Mobilizations erosion control (628.1905) | EACH | 6 | $500.00 | $90.00 |
| 76 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $1.00 | $90.00 |
| 77 | Turbidity barriers (628.6005) | SY | 169 | $65.00 | $37.90 |
| 78 | Inlet protection type A (628.7005) | EACH | 1 | $150.00 | $100.00 |
| 79 | Temporary ditch checks (628.7504) | LF | 340 | $10.00 | $7.30 |
| 80 | Culvert pipe checks (628.7555) | EACH | 12 | $10.00 | $18.00 |
| 81 | Field office type B (642.5001) | EACH | 1 | $16,840 | $8,960.00 |
| 82 | Traffic control drums (643.0300) | DAY | 5,355 | $0.15 | $0.43 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 859 | $0.50 | $1.22 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 1,411 | $0.10 | $0.49 |
| 85 | Traffic control signs (643.0900) | DAY | 14,097 | $0.15 | $0.67 |
| 86 | Traffic control covering signs type I (643.0910) | EACH | 4 | $300.00 | $111.01 |
| 87 | Traffic control covering signs type II (643.0920) | EACH | 20 | $70.00 | $133.18 |
| 88 | Traffic control signs fixed message (643.1000) | SF | 120 | $25.00 | $21.24 |
| 89 | Traffic control signs PCMS (643.1050) | DAY | 56 | $15.00 | $58.66 |
| 90 | Temporary marking line paint 6- inch (643.3165) | LF | 498,039 | $0.17 | $0.30 |
| 91 | Traffic control (643.5000) | EACH | 1 | $53,105 | $18,019 |
| 92 | Geotextile type DF schedule A (645.0111) | SY | 78 | $6.00 | $4.90 |
| 93 | Geotextile type HR (645.0120) | SY | 817 | $6.00 | $2.77 |
| 94 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 147,798 | $1.25 | $1.19 |
| 95 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 897 | $2.80 | $2.20 |
| 96 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 125 | $15.80 | $17.00 |
| 97 | Cold weather marking epoxy 6-inch (646.6466) | LF | 36,950 | $0.01 | $0.32 |
| 98 | Marking diagonal epoxy 12-inch (646.7120) | LF | 424 | $15.40 | $13.00 |
| 99 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 286 | $15.00 | $17.00 |
| 100 | Marking curb epoxy (646.8120) | LF | 54 | $7.55 | $13.00 |
| 101 | Marking island nose epoxy (646.8220) | EACH | 5 | $285.00 | $330.00 |
| 102 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 398 | $0.71 | $0.71 |
| 103 | Construction staking structure layout (structure) 01. B-59-322 (650.6501) | EACH | 1 | $3,666.99 | $3,666.99 |
| 104 | Construction staking resurfacing reference (650.8000) | LF | 47,061 | $0.12 | $0.12 |
| 105 | Construction staking supplemental control (project) 01. 4010-28-71 (650.9911) | EACH | 1 | $460.39 | $460.39 |
| 106 | Construction staking supplemental control (project) 02. 4010-29-71 (650.9911) | EACH | 1 | $460.39 | $460.39 |
| 107 | Sawing asphalt (690.0150) | LF | 387 | $2.00 | $2.00 |
| 108 | Sawing concrete (690.0250) | LF | 241 | $3.00 | $3.00 |
| 109 | Incentive strength concrete structures (715.0502) | DOL | 2,142 | $1.00 | $1.00 |
| 110 | Incentive compressive strength concrete pavement (715.0720) | DOL | 300 | $1.00 | $1.00 |
| 111 | Incentive iri ride (740.0440) | DOL | 71,200 | $1.00 | $1.00 |
| 112 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 7,200 | $5.00 | $5.00 |
| 113 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 12,600 | $5.00 | $5.00 |
| 114 | Special 01. adjusting inlet covers with rubber rings (SPV.0060) | EACH | 2 | $1,250.00 | $545.00 |
| 115 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 3,036 | $5.80 | $9.90 |