WisDOT contract 20260210028 bid tabulation
C Sturgeon Bay, South Duluth Avenue; Emerald Drive to Spruce Drive (CTH S, Door County C Sturgeon Bay, South Duluth Avenue). Let by Wisconsin DOT on February 10, 2026, Door. 4 bids received; low bid $2,099,814 by Relyco Plus, LLC.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 143
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Relyco Plus, LLC | $2,099,814 | Low |
| 2 | Peters Concrete Company | $2,135,990 | +2.0% |
| 3 | Dorner Inc. | $2,286,987 | +9.0% |
| 4 | James Peterson Sons, Inc. | $2,331,923 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Relyco Plus, LLC | 2. Peters Concrete Company | 3. Dorner Inc. | 4. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $500.00 | $1,000.00 | $250.00 | $200.00 |
| 2 | Grubbing (201.0220) | ID | 36 | $20.00 | $40.00 | $55.00 | $50.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 15 | $444.58 | $680.00 | $175.00 | $600.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 112 | $6.69 | $5.00 | $8.00 | $12.50 |
| 5 | Removing curb & gutter (204.0150) | LF | 1,082 | $4.80 | $4.35 | $2.00 | $15.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 110 | $6.71 | $5.00 | $7.00 | $10.00 |
| 7 | Removing surface drains (204.0190) | EACH | 1 | $300.00 | $300.00 | $200.00 | $750.00 |
| 8 | Removing manholes (204.0210) | EACH | 1 | $666.08 | $300.00 | $600.00 | $650.00 |
| 9 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 8 | $12.75 | $12.00 | $44.00 | $25.00 |
| 10 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 116 | $16.08 | $6.00 | $12.00 | $20.00 |
| 11 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 540 | $16.45 | $6.00 | $13.00 | $22.00 |
| 12 | Excavation common (205.0100) | CY | 14,426 | $18.50 | $15.00 | $18.00 | $20.57 |
| 13 | Finishing roadway (project) 01. 4997-05-73 (213.0100) | EACH | 1 | $2,000.00 | $3,000.00 | $3,500.00 | $3,000.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 718 | $33.69 | $37.10 | $28.25 | $21.15 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 11,402 | $15.72 | $12.75 | $19.25 | $17.88 |
| 16 | Base aggregate dense 3-inch (305.0130) | TON | 6,221 | $12.55 | $14.42 | $19.25 | $17.54 |
| 17 | Base aggregate open-graded (310.0110) | TON | 60 | $21.84 | $30.00 | $36.00 | $40.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 6 | $20.00 | $20.00 | $21.10 | $20.00 |
| 19 | HMA cold weather paving (450.4000) | TON | 721 | $0.01 | $3.35 | $0.01 | $0.01 |
| 20 | Tack coat (455.0605) | GAL | 528 | $3.50 | $3.50 | $6.50 | $6.20 |
| 21 | Incentive density HMA pavement (460.2000) | DOL | 1,850 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,669 | $79.40 | $79.40 | $97.40 | $92.25 |
| 23 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,214 | $87.30 | $87.30 | $102.90 | $97.50 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 93 | $253.40 | $253.40 | $247.00 | $234.00 |
| 25 | Concrete collars for pipe (520.8000) | EACH | 1 | $975.00 | $500.00 | $1,500.00 | $1,000.00 |
| 26 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $319.94 | $200.00 | $325.00 | $425.00 |
| 27 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 40 | $77.21 | $67.00 | $53.00 | $85.00 |
| 28 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 9 | $1,264.68 | $1,700.00 | $1,600.00 | $1,450.00 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $1,412.90 | $2,025.00 | $8,380.00 | $1,600.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,866.57 | $2,415.00 | $2,210.00 | $1,950.00 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $2,970.42 | $3,400.00 | $3,285.00 | $3,200.00 |
| 32 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 86 | $67.00 | $67.00 | $70.70 | $67.00 |
| 33 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 46 | $67.00 | $67.00 | $70.70 | $67.00 |
| 34 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 18 | $67.00 | $67.00 | $70.70 | $67.00 |
| 35 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 4,745 | $17.70 | $17.70 | $18.70 | $17.70 |
| 36 | Concrete curb pedestrian (601.0600) | LF | 49 | $65.00 | $65.00 | $68.60 | $65.00 |
| 37 | Concrete sidewalk 5-inch (602.0410) | SF | 19,406 | $6.85 | $6.85 | $7.20 | $6.85 |
| 38 | Curb ramp detectable warning field yellow (602.0505) | SF | 100 | $35.00 | $35.00 | $37.00 | $35.00 |
| 39 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 71 | $62.00 | $62.00 | $65.50 | $62.00 |
| 40 | Concrete driveway 6-inch (602.0810) | SY | 393 | $70.50 | $70.50 | $74.40 | $70.50 |
| 41 | Concrete driveway 8-inch (602.0820) | SY | 667 | $74.85 | $74.85 | $79.00 | $74.85 |
| 42 | Riprap medium (606.0200) | CY | 7 | $150.00 | $100.00 | $150.00 | $200.00 |
| 43 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 130 | $83.51 | $99.40 | $72.00 | $102.00 |
| 44 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 10 | $146.90 | $132.00 | $112.00 | $222.00 |
| 45 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 100 | $155.51 | $151.00 | $184.00 | $212.00 |
| 46 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 388 | $71.50 | $92.05 | $78.00 | $102.00 |
| 47 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 475 | $72.88 | $77.75 | $83.00 | $100.00 |
| 48 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 206 | $91.67 | $93.50 | $86.00 | $102.00 |
| 49 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 945 | $111.35 | $123.50 | $131.00 | $146.00 |
| 50 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 285 | $148.21 | $172.00 | $177.00 | $190.00 |
| 51 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 425 | $189.09 | $209.85 | $218.00 | $240.00 |
| 52 | Reconstructing catch basins (611.0410) | EACH | 1 | $1,401.00 | $800.00 | $650.00 | $1,350.00 |
| 53 | Reconstructing manholes (611.0420) | EACH | 11 | $1,175.36 | $720.00 | $1,100.00 | $1,500.00 |
| 54 | Reconstructing inlets (611.0430) | EACH | 1 | $970.50 | $800.00 | $650.00 | $1,350.00 |
| 55 | Manhole covers type J-special (611.0535) | EACH | 16 | $507.87 | $465.00 | $525.00 | $550.00 |
| 56 | Inlet covers type H (611.0624) | EACH | 16 | $725.20 | $715.00 | $750.00 | $800.00 |
| 57 | Catch basins 2X3-FT (611.1230) | EACH | 16 | $3,361.64 | $2,660.00 | $2,950.00 | $3,125.00 |
| 58 | Manholes 4-FT diameter (611.2004) | EACH | 5 | $4,366.84 | $3,750.00 | $3,505.00 | $4,050.00 |
| 59 | Manholes 5-FT diameter (611.2005) | EACH | 8 | $6,411.47 | $5,410.00 | $6,170.00 | $5,850.00 |
| 60 | Manholes 6-FT diameter (611.2006) | EACH | 3 | $7,932.17 | $7,325.00 | $8,170.00 | $8,050.00 |
| 61 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 750 | $14.20 | $21.00 | $16.00 | $20.00 |
| 62 | Maintenance and repair of haul roads (project) 01. 4997-05-73 (618.0100) | EACH | 1 | $0.01 | $100.00 | $1.00 | $100.00 |
| 63 | Mobilization (619.1000) | EACH | 1 | $143,000 | $197,560 | $87,500 | $121,795 |
| 64 | Water (624.0100) | MGAL | 275 | $0.01 | $40.00 | $46.50 | $45.00 |
| 65 | Topsoil (625.0100) | SY | 9,939 | $5.30 | $8.36 | $9.50 | $4.00 |
| 66 | Silt fence (628.1504) | LF | 1,297 | $2.25 | $2.00 | $2.40 | $2.25 |
| 67 | Silt fence maintenance (628.1520) | LF | 1,297 | $0.01 | $0.01 | $0.01 | $0.01 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 3 | $150.00 | $0.01 | $158.00 | $150.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $0.01 | $106.00 | $100.00 |
| 70 | Erosion mat urban class I type B (628.2008) | SY | 11,430 | $1.95 | $0.01 | $2.10 | $1.95 |
| 71 | Inlet protection type A (628.7005) | EACH | 16 | $5.00 | $20.00 | $5.00 | $5.00 |
| 72 | Inlet protection type B (628.7010) | EACH | 1 | $62.00 | $20.00 | $65.00 | $62.00 |
| 73 | Inlet protection type C (628.7015) | EACH | 18 | $68.00 | $20.00 | $72.00 | $68.00 |
| 74 | Temporary ditch checks (628.7504) | LF | 148 | $7.50 | $5.00 | $7.90 | $7.50 |
| 75 | Culvert pipe checks (628.7555) | EACH | 57 | $16.00 | $10.00 | $17.00 | $16.00 |
| 76 | Tracking pads (628.7560) | EACH | 2 | $0.01 | $500.00 | $1,500.00 | $3,500.00 |
| 77 | Rock bags (628.7570) | EACH | 17 | $16.00 | $15.00 | $16.90 | $16.00 |
| 78 | Fertilizer type B (629.0210) | CWT | 7 | $100.00 | $100.00 | $105.60 | $100.00 |
| 79 | Seeding mixture no. 40 (630.0140) | LB | 223 | $40.00 | $160.00 | $9.20 | $8.75 |
| 80 | Seed water (630.0500) | MGAL | 223 | $5.00 | $0.01 | $5.30 | $5.00 |
| 81 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $120.00 | $100.00 | $127.00 | $120.00 |
| 82 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 21 | $126.00 | $110.00 | $133.00 | $126.00 |
| 83 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 18 | $130.00 | $120.00 | $137.00 | $130.00 |
| 84 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 3 | $140.00 | $130.00 | $148.00 | $140.00 |
| 85 | Signs type II reflective H (637.2210) | SF | 124.76 | $35.00 | $20.00 | $37.00 | $35.00 |
| 86 | Signs type II reflective F (637.2230) | SF | 151.81 | $35.00 | $22.00 | $37.00 | $35.00 |
| 87 | Moving signs type II (638.2102) | EACH | 10 | $75.00 | $50.00 | $79.00 | $75.00 |
| 88 | Removing signs type II (638.2602) | EACH | 8 | $40.00 | $25.00 | $42.00 | $40.00 |
| 89 | Removing small sign supports (638.3000) | EACH | 17 | $40.00 | $25.00 | $42.00 | $40.00 |
| 90 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $10,000 | $10,000 | $20,000 |
| 91 | Traffic control drums (643.0300) | DAY | 8,471 | $0.15 | $0.25 | $0.30 | $0.15 |
| 92 | Traffic control barricades type III (643.0420) | DAY | 1,908 | $0.50 | $0.65 | $0.70 | $0.50 |
| 93 | Traffic control warning lights type A (643.0705) | DAY | 3,816 | $0.10 | $0.25 | $0.30 | $0.10 |
| 94 | Traffic control signs (643.0900) | DAY | 3,225 | $0.30 | $0.65 | $0.70 | $0.30 |
| 95 | Traffic control covering signs type II (643.0920) | EACH | 6 | $110.00 | $95.00 | $100.30 | $110.00 |
| 96 | Traffic control signs fixed message (643.1000) | SF | 18.75 | $14.50 | $27.00 | $28.50 | $14.50 |
| 97 | Traffic control signs PCMS (643.1050) | DAY | 28 | $35.00 | $85.00 | $89.70 | $35.00 |
| 98 | Traffic control (643.5000) | EACH | 1 | $14,750 | $6,500.00 | $6,862.00 | $14,750 |
| 99 | Temporary pedestrian barricade (644.1810) | LF | 5 | $18.00 | $20.00 | $21.10 | $18.00 |
| 100 | Geotextile type HR (645.0120) | SY | 24 | $10.00 | $4.00 | $5.00 | $15.00 |
| 101 | Marking line epoxy 6-inch (646.2020) | LF | 9,550 | $0.56 | $0.56 | $0.60 | $0.56 |
| 102 | Marking line epoxy 10-inch (646.4020) | LF | 100 | $1.24 | $1.24 | $1.30 | $1.24 |
| 103 | Marking arrow epoxy (646.5020) | EACH | 2 | $442.99 | $443.00 | $468.00 | $442.99 |
| 104 | Marking stop line epoxy 18-inch (646.6120) | LF | 78 | $18.58 | $18.58 | $19.60 | $18.58 |
| 105 | Cold weather marking epoxy 6-inch (646.6466) | LF | 10,400 | $0.01 | $0.56 | $0.60 | $0.56 |
| 106 | Cold weather marking epoxy 10- inch (646.6470) | LF | 100 | $0.01 | $1.24 | $1.30 | $1.24 |
| 107 | Marking diagonal epoxy 12-inch (646.7120) | LF | 28 | $18.10 | $18.10 | $19.10 | $18.10 |
| 108 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 629 | $17.62 | $17.62 | $18.60 | $17.62 |
| 109 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 216 | $30.48 | $30.48 | $32.20 | $30.48 |
| 110 | Marking removal line 4-inch (646.9000) | LF | 62 | $7.50 | $2.00 | $2.10 | $7.50 |
| 111 | Marking removal line 6-inch (646.9002) | LF | 31 | $28.00 | $2.00 | $2.10 | $28.00 |
| 112 | Marking removal special marking (646.9300) | EACH | 1 | $150.00 | $150.00 | $158.00 | $150.00 |
| 113 | Construction staking storm sewer (650.4000) | EACH | 45 | $92.00 | $92.00 | $97.00 | $92.00 |
| 114 | Construction staking subgrade (650.4500) | LF | 2,899 | $0.01 | $0.01 | $0.01 | $0.01 |
| 115 | Construction staking base (650.5000) | LF | 2,899 | $0.30 | $0.30 | $0.30 | $0.30 |
| 116 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 4,979 | $0.95 | $0.95 | $1.00 | $0.95 |
| 117 | Construction staking curb ramps (650.9000) | EACH | 14 | $100.00 | $100.00 | $106.00 | $100.00 |
| 118 | Construction staking sidewalk (project) 01. 4997-05-73 (650.9500) | EACH | 1 | $100.00 | $100.00 | $106.00 | $100.00 |
| 119 | Construction staking supplemental control (project) 01. 4997-05-73 (650.9911) | EACH | 1 | $10.00 | $10.00 | $11.00 | $10.00 |
| 120 | Construction staking slope stakes (650.9920) | LF | 3,560 | $0.90 | $0.90 | $1.00 | $0.90 |
| 121 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 50 | $10.50 | $10.50 | $11.10 | $10.50 |
| 122 | Adjusting pull boxes (653.0900) | EACH | 2 | $425.00 | $425.00 | $450.00 | $425.00 |
| 123 | Concrete bases type 1 (654.0101) | EACH | 4 | $1,300.00 | $1,300.00 | $1,375.00 | $1,300.00 |
| 124 | Cable traffic signal 5-14 AWG (655.0230) | LF | 791 | $3.00 | $3.00 | $3.20 | $3.00 |
| 125 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 216 | $1.25 | $1.25 | $1.30 | $1.25 |
| 126 | Loop detector lead in cable (655.0700) | LF | 20 | $2.50 | $2.50 | $2.60 | $2.50 |
| 127 | Pedestal bases (657.0100) | EACH | 4 | $350.00 | $350.00 | $370.00 | $350.00 |
| 128 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 4 | $760.00 | $760.00 | $800.00 | $760.00 |
| 129 | Pedestrian signal face 16-inch (658.0416) | EACH | 4 | $575.00 | $575.00 | $605.00 | $575.00 |
| 130 | Pedestrian push buttons (658.0500) | EACH | 4 | $625.00 | $625.00 | $660.00 | $625.00 |
| 131 | Signal mounting hardware (location) 01. S duluth ave (658.5070) | EACH | 1 | $1,000.00 | $1,000.00 | $1,055.00 | $1,000.00 |
| 132 | Public land reference monument verify and reset (680.0100) | EACH | 2 | $750.00 | $750.00 | $790.00 | $750.00 |
| 133 | Sawing asphalt (690.0150) | LF | 785 | $2.25 | $1.95 | $2.10 | $1.95 |
| 134 | Sawing concrete (690.0250) | LF | 133 | $2.95 | $2.55 | $2.70 | $2.55 |
| 135 | Incentive iri ride (740.0440) | DOL | 4,090 | $1.00 | $1.00 | $1.00 | $1.00 |
| 136 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 137 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 138 | Special 01. adjusting water valve boxes (SPV.0060) | EACH | 15 | $355.50 | $125.00 | $125.00 | $350.00 |
| 139 | Special 02. sanitary manhole casting (SPV.0060) | EACH | 2 | $557.87 | $575.00 | $850.00 | $550.00 |
| 140 | Special 03. frame and chimney seal (SPV.0060) | EACH | 9 | $1,006.78 | $525.00 | $1,075.00 | $1,000.00 |
| 141 | Special 04. research and locate existing property monuments (SPV.0060) | EACH | 18 | $90.00 | $90.00 | $95.00 | $90.00 |
| 142 | Special 05. verify and replace existing property monuments (SPV.0060) | EACH | 6 | $40.00 | $40.00 | $42.00 | $40.00 |
| 143 | Special 01. sidewalk curb retaining wall (SPV.0090) | LF | 53 | $69.00 | $69.00 | $72.80 | $69.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.