WisDOT contract 20260210030 bid tabulation
1009-43-69. Let by Wisconsin DOT on February 10, 2026, Menominee. 1 bid received; low bid $22,571,144 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 145
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $22,571,144 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc |
|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 68 | $349.00 |
| 2 | Grubbing (201.0220) | ID | 269 | $19.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 102 | $488.00 |
| 4 | Removing structure (structure) 01. sta 295+42 (60" CMCP) (203.0220) | EACH | 1 | $3,397.00 |
| 5 | Removing structure (structure) 02. sta 295+52 (60" CMCP) (203.0220) | EACH | 1 | $3,397.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 1,732 | $10.30 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 557,684 | $3.55 |
| 8 | Removing guardrail (204.0165) | LF | 5,472 | $2.50 |
| 9 | Excavation common (205.0100) | CY | 34,187 | $14.51 |
| 10 | Borrow (208.0100) | CY | 326 | $14.51 |
| 11 | Prepare foundation for asphaltic paving (project) 02. 9650-06-72 (211.0101) | EACH | 1 | $58,760 |
| 12 | Prepare foundation for asphaltic paving (project) 03. 9650-17-73 (211.0101) | EACH | 1 | $44,680 |
| 13 | Prepare foundation for asphaltic paving (project) 04. 9660-09-70 (211.0101) | EACH | 1 | $134,860 |
| 14 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 4,174 | $95.00 |
| 15 | Finishing roadway (project) 01. 1009-43-69 (213.0100) | EACH | 1 | $2,150.00 |
| 16 | Finishing roadway (project) 02. 9650-16-72 (213.0100) | EACH | 1 | $2,150.00 |
| 17 | Finishing roadway (project) 03. 9650-17-73 (213.0100) | EACH | 1 | $2,150.00 |
| 18 | Finishing roadway (project) 04. 9660-09-70 (213.0100) | EACH | 1 | $2,150.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 23,186 | $28.84 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 34,107 | $0.01 |
| 21 | Hauling excess shoulder material (305.0504.S) | CY | 481 | $41.67 |
| 22 | HMA cold weather paving (450.4000) | TON | 32,745 | $3.05 |
| 23 | Tack coat (455.0605) | GAL | 89,949 | $2.40 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 3 | $2,850.00 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 6 | $4,600.00 |
| 26 | Incentive density PWL HMA pavement (460.2005) | DOL | 101,220 | $1.00 |
| 27 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 62,500 | $1.00 |
| 28 | Incentive air voids HMA pavement (460.2010) | DOL | 119,554 | $1.00 |
| 29 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 119,554 | $77.80 |
| 30 | Asphaltic surface (465.0105) | TON | 10,735 | $127.10 |
| 31 | Asphaltic surface patching (465.0110) | TON | 7,800 | $102.00 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 70 | $217.00 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 271,594 | $0.43 |
| 34 | Asphaltic rumble strips, transverse (465.0580) | SY | 69 | $121.90 |
| 35 | Concrete masonry endwalls (504.0900) | CY | 17 | $3,235.28 |
| 36 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 24 | $517.00 |
| 37 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 12 | $777.00 |
| 38 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 2 | $961.00 |
| 39 | Culvert pipe class III-B non-metal 24-inch (520.3624) | LF | 636 | $154.00 |
| 40 | Culvert pipe class III-B non-metal 30-inch (520.3630) | LF | 312 | $188.50 |
| 41 | Culvert pipe class III-B non-metal 36-inch (520.3636) | LF | 56 | $242.40 |
| 42 | Cleaning culvert pipes (520.8700) | EACH | 2 | $1,500.00 |
| 43 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 240 | $181.30 |
| 44 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 40 | $252.40 |
| 45 | Culvert pipe reinforced concrete class III 42-inch (522.0142) | LF | 48 | $338.50 |
| 46 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 968 | $172.85 |
| 47 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 96 | $234.40 |
| 48 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 52 | $311.30 |
| 49 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 192 | $394.50 |
| 50 | Culvert pipe reinforced concrete class IV 72-inch (522.0472) | LF | 124 | $825.50 |
| 51 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 60 | $1,729.00 |
| 52 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $2,178.00 |
| 53 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $2,938.00 |
| 54 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 2 | $3,600.00 |
| 55 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (522.2319) | LF | 136 | $219.00 |
| 56 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 34X53-inch (522.2334) | LF | 56 | $364.00 |
| 57 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 43X68-inch (522.2343) | LF | 56 | $474.00 |
| 58 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 48X76-inch (522.2348) | LF | 48 | $587.00 |
| 59 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 936 | $233.45 |
| 60 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 56 | $1,892.00 |
| 61 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 2 | $3,751.00 |
| 62 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643) | EACH | 2 | $5,331.00 |
| 63 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 2 | $6,117.00 |
| 64 | Culvert pipe salvaged 36-inch (524.0136) | LF | 52 | $172.00 |
| 65 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 1,330 | $25.65 |
| 66 | Concrete surface drains (602.3010) | CY | 5 | $1,100.00 |
| 67 | Riprap medium (606.0200) | CY | 418 | $100.00 |
| 68 | Steel plate beam guard class A (614.0305) | LF | 2,475 | $24.03 |
| 69 | Steel plate beam guard short radius (614.0345) | LF | 162.50 | $26.00 |
| 70 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 2 | $3,273.00 |
| 71 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 9,666 | $7.00 |
| 72 | Adjusting steel plate beam guard (614.0400) | LF | 6,913 | $5.33 |
| 73 | Guardrail stiffened NW (614.0510) | LF | 1,313 | $25.00 |
| 74 | Guardrail stiffened LHW (614.0515) | LF | 1,313 | $37.93 |
| 75 | Replacing guardrail posts and blocks (614.0950) | EACH | 2,494 | $35.00 |
| 76 | MGS guardrail 3 K (614.2330) | LF | 750 | $37.93 |
| 77 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,333.00 |
| 78 | Maintenance and repair of haul roads (project) 01. 1009-43-69 (618.0100) | EACH | 1 | $1.00 |
| 79 | Maintenance and repair of haul roads (project) 02. 9650-16-72 (618.0100) | EACH | 1 | $1.00 |
| 80 | Maintenance and repair of haul roads (project) 03. 9650-17-73 (618.0100) | EACH | 1 | $1.00 |
| 81 | Maintenance and repair of haul roads (project) 04. 9660-09-70 (618.0100) | EACH | 1 | $1.00 |
| 82 | Mobilization (619.1000) | EACH | 1 | $2,224,780 |
| 83 | Water (624.0100) | MGAL | 1,270 | $0.01 |
| 84 | Topsoil (625.0100) | SY | 34,105 | $3.54 |
| 85 | Silt fence (628.1504) | LF | 23,675 | $1.60 |
| 86 | Silt fence maintenance (628.1520) | LF | 47,360 | $0.03 |
| 87 | Mobilizations erosion control (628.1905) | EACH | 35 | $3.00 |
| 88 | Mobilizations emergency erosion control (628.1910) | EACH | 15 | $53.00 |
| 89 | Erosion mat urban class I type A (628.2006) | SY | 34,105 | $1.63 |
| 90 | Temporary ditch checks (628.7504) | LF | 1,534 | $5.73 |
| 91 | Culvert pipe checks (628.7555) | EACH | 547 | $10.00 |
| 92 | Rock bags (628.7570) | EACH | 820 | $5.00 |
| 93 | Fertilizer type B (629.0210) | CWT | 22.65 | $90.00 |
| 94 | Seeding mixture no. 40 (630.0140) | LB | 10 | $40.00 |
| 95 | Seeding mixture no. 70 (630.0170) | LB | 174 | $88.00 |
| 96 | Seeding nurse crop (630.0400) | LB | 299 | $12.00 |
| 97 | Seed water (630.0500) | MGAL | 784 | $5.00 |
| 98 | Markers culvert end (633.5200) | EACH | 182 | $40.30 |
| 99 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 16 | $95.00 |
| 100 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 48 | $98.00 |
| 101 | Signs type II reflective F (637.2230) | SF | 224 | $22.00 |
| 102 | Moving signs type II (638.2102) | EACH | 100 | $75.00 |
| 103 | Removing signs type II (638.2602) | EACH | 14 | $25.00 |
| 104 | Removing small sign supports (638.3000) | EACH | 7 | $25.00 |
| 105 | Moving small sign supports (638.4000) | EACH | 98 | $75.00 |
| 106 | Field office type D (642.5401) | EACH | 1 | $37,890 |
| 107 | Traffic control drums (643.0300) | DAY | 11,218 | $1.00 |
| 108 | Traffic control barricades type III (643.0420) | DAY | 4,598 | $1.00 |
| 109 | Traffic control warning lights type A (643.0705) | DAY | 8,356 | $0.25 |
| 110 | Traffic control signs (643.0900) | DAY | 57,920 | $0.85 |
| 111 | Traffic control covering signs type I (643.0910) | EACH | 12 | $600.00 |
| 112 | Traffic control covering signs type II (643.0920) | EACH | 97 | $35.00 |
| 113 | Traffic control signs fixed message (643.1000) | SF | 144 | $11.10 |
| 114 | Temporary marking line paint 6- inch (643.3165) | LF | 985,231 | $0.22 |
| 115 | Traffic control (643.5000) | EACH | 1 | $9,000.00 |
| 116 | Geotextile type HR (645.0120) | SY | 1,132 | $2.25 |
| 117 | Marking line epoxy 6-inch (646.2020) | LF | 6,335 | $0.42 |
| 118 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 767,250 | $1.09 |
| 119 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 5,697 | $2.47 |
| 120 | Marking stop line epoxy 18-inch (646.6120) | LF | 60 | $14.07 |
| 121 | Cold weather marking epoxy 6-inch (646.6466) | LF | 208,460 | $0.42 |
| 122 | Locating no-passing zones (648.0100) | MI | 38.84 | $462.26 |
| 123 | Construction staking subgrade (650.4500) | LF | 10,881 | $0.01 |
| 124 | Construction staking base (650.5000) | LF | 10,881 | $0.01 |
| 125 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,330 | $1.50 |
| 126 | Construction staking pipe culverts (650.6000) | EACH | 91 | $270.00 |
| 127 | Construction staking resurfacing reference (650.8000) | LF | 194,295 | $0.10 |
| 128 | Construction staking supplemental control (project) 01. 1009-43-69 (650.9911) | EACH | 1 | $2,464.60 |
| 129 | Construction staking supplemental control (project) 02. 9650-16-72 (650.9911) | EACH | 1 | $2,464.60 |
| 130 | Construction staking supplemental control (project) 03. 9650-17-73 (650.9911) | EACH | 1 | $2,464.59 |
| 131 | Construction staking supplemental control (project) 04. 9660-09-70 (650.9911) | EACH | 1 | $2,464.59 |
| 132 | Construction staking slope stakes (650.9920) | LF | 12,502 | $0.75 |
| 133 | Sawing asphalt (690.0150) | LF | 7,612 | $1.85 |
| 134 | Incentive iri ride (740.0440) | DOL | 89,626 | $1.00 |
| 135 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 6,520 | $2.93 |
| 136 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 6,350 | $0.73 |
| 137 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 |
| 138 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 |
| 139 | Special 01. slurry pipe (SPV.0035) | CY | 14 | $257.00 |
| 140 | Special 01. sand bags (SPV.0060) | EACH | 660 | $5.00 |
| 141 | Special 02. adjusting eats (SPV.0060) | EACH | 30 | $533.00 |
| 142 | Special 01. grading and shaping ditch (SPV.0090) | LF | 7,460 | $5.03 |
| 143 | Special 02. remove, salvage, and reinstall guardrail (SPV.0090) | LF | 4,238 | $8.53 |
| 144 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 7,089 | $22.03 |
| 145 | Special 02. removing distressed asphaltic surface milling (SPV.0180) | SY | 23,300 | $14.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.