WisDOT contract 20260210030 bid tabulation

1009-43-69. Let by Wisconsin DOT on February 10, 2026, Menominee. 1 bid received; low bid $22,571,144 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
10 FEB 2026
Pay items
145
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$22,571,144Low
WisDOT contract 20260210030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc
1Grubbing (201.0205)STA68$349.00
2Grubbing (201.0220)ID269$19.00
3Removing small pipe culverts (203.0100)EACH102$488.00
4Removing structure (structure) 01. sta 295+42 (60" CMCP) (203.0220)EACH1$3,397.00
5Removing structure (structure) 02. sta 295+52 (60" CMCP) (203.0220)EACH1$3,397.00
6Removing asphaltic surface butt joints (204.0115)SY1,732$10.30
7Removing asphaltic surface milling (204.0120)SY557,684$3.55
8Removing guardrail (204.0165)LF5,472$2.50
9Excavation common (205.0100)CY34,187$14.51
10Borrow (208.0100)CY326$14.51
11Prepare foundation for asphaltic paving (project) 02. 9650-06-72 (211.0101)EACH1$58,760
12Prepare foundation for asphaltic paving (project) 03. 9650-17-73 (211.0101)EACH1$44,680
13Prepare foundation for asphaltic paving (project) 04. 9660-09-70 (211.0101)EACH1$134,860
14Prepare foundation for asphaltic shoulders (211.0400)STA4,174$95.00
15Finishing roadway (project) 01. 1009-43-69 (213.0100)EACH1$2,150.00
16Finishing roadway (project) 02. 9650-16-72 (213.0100)EACH1$2,150.00
17Finishing roadway (project) 03. 9650-17-73 (213.0100)EACH1$2,150.00
18Finishing roadway (project) 04. 9660-09-70 (213.0100)EACH1$2,150.00
19Base aggregate dense 3/4-inch (305.0110)TON23,186$28.84
20Base aggregate dense 1 1/4-inch (305.0120)TON34,107$0.01
21Hauling excess shoulder material (305.0504.S)CY481$41.67
22HMA cold weather paving (450.4000)TON32,745$3.05
23Tack coat (455.0605)GAL89,949$2.40
24HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH3$2,850.00
25HMA percent within limits (PWL) test strip density (460.0110.S)EACH6$4,600.00
26Incentive density PWL HMA pavement (460.2005)DOL101,220$1.00
27Incentive density HMA pavement longitudinal joints (460.2007)DOL62,500$1.00
28Incentive air voids HMA pavement (460.2010)DOL119,554$1.00
29HMA pavement 4 LT 58-28 S (460.5224)TON119,554$77.80
30Asphaltic surface (465.0105)TON10,735$127.10
31Asphaltic surface patching (465.0110)TON7,800$102.00
32Asphaltic surface driveways and field entrances (465.0120)TON70$217.00
33Asphaltic rumble strips, centerline (465.0560)LF271,594$0.43
34Asphaltic rumble strips, transverse (465.0580)SY69$121.90
35Concrete masonry endwalls (504.0900)CY17$3,235.28
36Apron endwalls for culvert pipe 24- inch (520.1024)EACH24$517.00
37Apron endwalls for culvert pipe 30- inch (520.1030)EACH12$777.00
38Apron endwalls for culvert pipe 36- inch (520.1036)EACH2$961.00
39Culvert pipe class III-B non-metal 24-inch (520.3624)LF636$154.00
40Culvert pipe class III-B non-metal 30-inch (520.3630)LF312$188.50
41Culvert pipe class III-B non-metal 36-inch (520.3636)LF56$242.40
42Cleaning culvert pipes (520.8700)EACH2$1,500.00
43Culvert pipe reinforced concrete class III 24-inch (522.0124)LF240$181.30
44Culvert pipe reinforced concrete class III 36-inch (522.0136)LF40$252.40
45Culvert pipe reinforced concrete class III 42-inch (522.0142)LF48$338.50
46Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF968$172.85
47Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF96$234.40
48Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF52$311.30
49Culvert pipe reinforced concrete class IV 42-inch (522.0442)LF192$394.50
50Culvert pipe reinforced concrete class IV 72-inch (522.0472)LF124$825.50
51Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH60$1,729.00
52Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH4$2,178.00
53Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH4$2,938.00
54Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$3,600.00
55Culvert pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (522.2319)LF136$219.00
56Culvert pipe reinforced concrete horizontal elliptical class HE-III 34X53-inch (522.2334)LF56$364.00
57Culvert pipe reinforced concrete horizontal elliptical class HE-III 43X68-inch (522.2343)LF56$474.00
58Culvert pipe reinforced concrete horizontal elliptical class HE-III 48X76-inch (522.2348)LF48$587.00
59Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419)LF936$233.45
60Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH56$1,892.00
61Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634)EACH2$3,751.00
62Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643)EACH2$5,331.00
63Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648)EACH2$6,117.00
64Culvert pipe salvaged 36-inch (524.0136)LF52$172.00
65Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,330$25.65
66Concrete surface drains (602.3010)CY5$1,100.00
67Riprap medium (606.0200)CY418$100.00
68Steel plate beam guard class A (614.0305)LF2,475$24.03
69Steel plate beam guard short radius (614.0345)LF162.50$26.00
70Steel plate beam guard energy absorbing terminal (614.0370)EACH2$3,273.00
71Guardrail mow strip emulsified asphalt (614.0397)SY9,666$7.00
72Adjusting steel plate beam guard (614.0400)LF6,913$5.33
73Guardrail stiffened NW (614.0510)LF1,313$25.00
74Guardrail stiffened LHW (614.0515)LF1,313$37.93
75Replacing guardrail posts and blocks (614.0950)EACH2,494$35.00
76MGS guardrail 3 K (614.2330)LF750$37.93
77MGS guardrail terminal eat (614.2610)EACH2$3,333.00
78Maintenance and repair of haul roads (project) 01. 1009-43-69 (618.0100)EACH1$1.00
79Maintenance and repair of haul roads (project) 02. 9650-16-72 (618.0100)EACH1$1.00
80Maintenance and repair of haul roads (project) 03. 9650-17-73 (618.0100)EACH1$1.00
81Maintenance and repair of haul roads (project) 04. 9660-09-70 (618.0100)EACH1$1.00
82Mobilization (619.1000)EACH1$2,224,780
83Water (624.0100)MGAL1,270$0.01
84Topsoil (625.0100)SY34,105$3.54
85Silt fence (628.1504)LF23,675$1.60
86Silt fence maintenance (628.1520)LF47,360$0.03
87Mobilizations erosion control (628.1905)EACH35$3.00
88Mobilizations emergency erosion control (628.1910)EACH15$53.00
89Erosion mat urban class I type A (628.2006)SY34,105$1.63
90Temporary ditch checks (628.7504)LF1,534$5.73
91Culvert pipe checks (628.7555)EACH547$10.00
92Rock bags (628.7570)EACH820$5.00
93Fertilizer type B (629.0210)CWT22.65$90.00
94Seeding mixture no. 40 (630.0140)LB10$40.00
95Seeding mixture no. 70 (630.0170)LB174$88.00
96Seeding nurse crop (630.0400)LB299$12.00
97Seed water (630.0500)MGAL784$5.00
98Markers culvert end (633.5200)EACH182$40.30
99Posts wood 4X6-inch X 14-FT (634.0614)EACH16$95.00
100Posts wood 4X6-inch X 16-FT (634.0616)EACH48$98.00
101Signs type II reflective F (637.2230)SF224$22.00
102Moving signs type II (638.2102)EACH100$75.00
103Removing signs type II (638.2602)EACH14$25.00
104Removing small sign supports (638.3000)EACH7$25.00
105Moving small sign supports (638.4000)EACH98$75.00
106Field office type D (642.5401)EACH1$37,890
107Traffic control drums (643.0300)DAY11,218$1.00
108Traffic control barricades type III (643.0420)DAY4,598$1.00
109Traffic control warning lights type A (643.0705)DAY8,356$0.25
110Traffic control signs (643.0900)DAY57,920$0.85
111Traffic control covering signs type I (643.0910)EACH12$600.00
112Traffic control covering signs type II (643.0920)EACH97$35.00
113Traffic control signs fixed message (643.1000)SF144$11.10
114Temporary marking line paint 6- inch (643.3165)LF985,231$0.22
115Traffic control (643.5000)EACH1$9,000.00
116Geotextile type HR (645.0120)SY1,132$2.25
117Marking line epoxy 6-inch (646.2020)LF6,335$0.42
118Marking line grooved wet ref epoxy 6-inch (646.2040)LF767,250$1.09
119Marking line grooved wet ref epoxy 10-inch (646.4040)LF5,697$2.47
120Marking stop line epoxy 18-inch (646.6120)LF60$14.07
121Cold weather marking epoxy 6-inch (646.6466)LF208,460$0.42
122Locating no-passing zones (648.0100)MI38.84$462.26
123Construction staking subgrade (650.4500)LF10,881$0.01
124Construction staking base (650.5000)LF10,881$0.01
125Construction staking curb gutter and curb & gutter (650.5500)LF1,330$1.50
126Construction staking pipe culverts (650.6000)EACH91$270.00
127Construction staking resurfacing reference (650.8000)LF194,295$0.10
128Construction staking supplemental control (project) 01. 1009-43-69 (650.9911)EACH1$2,464.60
129Construction staking supplemental control (project) 02. 9650-16-72 (650.9911)EACH1$2,464.60
130Construction staking supplemental control (project) 03. 9650-17-73 (650.9911)EACH1$2,464.59
131Construction staking supplemental control (project) 04. 9660-09-70 (650.9911)EACH1$2,464.59
132Construction staking slope stakes (650.9920)LF12,502$0.75
133Sawing asphalt (690.0150)LF7,612$1.85
134Incentive iri ride (740.0440)DOL89,626$1.00
135Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF6,520$2.93
136Maintaining climbing turtle exclusion fence (999.2105.S)LF6,350$0.73
137On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,100$5.00
138On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,800$5.00
139Special 01. slurry pipe (SPV.0035)CY14$257.00
140Special 01. sand bags (SPV.0060)EACH660$5.00
141Special 02. adjusting eats (SPV.0060)EACH30$533.00
142Special 01. grading and shaping ditch (SPV.0090)LF7,460$5.03
143Special 02. remove, salvage, and reinstall guardrail (SPV.0090)LF4,238$8.53
144Special 01. resin binder high friction surface treatment (SPV.0180)SY7,089$22.03
145Special 02. removing distressed asphaltic surface milling (SPV.0180)SY23,300$14.30
WisDOT contract 20260210030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy