WisDOT contract 20260310035 bid tabulation
Phillips - Emery; Park Drive to Mink Drive (CTH D, Price County Phillips-Emery). Let by Wisconsin DOT on March 10, 2026, Price. 4 bids received; low bid $830,080 by Haas Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 72
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Haas Sons, Inc. | $830,080 | Low |
| 2 | McCabe Construction, Inc. | $863,964 | +4.0% |
| 3 | James Peterson Sons, Inc. | $876,710 | +6.0% |
| 4 | A-1 Excavating LLC | $1,103,311 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haas Sons, Inc. | 2. McCabe Construction, Inc. | 3. James Peterson Sons, Inc. | 4. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 13 | $345.00 | $345.00 | $345.00 | $1,020.00 |
| 2 | Removing guardrail (204.0165) | LF | 270 | $3.00 | $3.00 | $3.00 | $4.00 |
| 3 | Excavation common (205.0100) | CY | 12,021 | $10.50 | $15.75 | $15.20 | $21.00 |
| 4 | Finishing roadway (project) 01. 9488-02-70 (213.0100) | EACH | 1 | $500.00 | $1,530.00 | $2,500.00 | $1,240.00 |
| 5 | Obliterating old road (214.0100) | STA | 7 | $250.00 | $1,920.00 | $750.00 | $910.00 |
| 6 | Base aggregate dense 3/4-inch (305.0110) | TON | 744 | $21.00 | $26.30 | $30.28 | $28.00 |
| 7 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,721 | $17.50 | $18.40 | $19.80 | $21.00 |
| 8 | Tack coat (455.0605) | GAL | 307 | $5.70 | $5.70 | $5.70 | $6.00 |
| 9 | Incentive density HMA pavement (460.2000) | DOL | 665.60 | $1.00 | $1.00 | $1.00 | $1.00 |
| 10 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 613 | $103.00 | $103.00 | $103.00 | $124.00 |
| 11 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 522 | $111.18 | $111.20 | $111.18 | $117.00 |
| 12 | Adhesive anchors 5/8-inch (502.4105) | EACH | 24 | $25.00 | $25.00 | $85.00 | $32.00 |
| 13 | Adhesive anchors 1 1/2-inch (502.4112) | EACH | 24 | $25.00 | $25.00 | $135.00 | $32.00 |
| 14 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 2 | $350.00 | $445.00 | $365.00 | $700.00 |
| 15 | Culvert pipe class III-A 18-inch (520.3318) | LF | 86 | $75.00 | $54.00 | $75.05 | $56.00 |
| 16 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 118 | $90.00 | $105.00 | $97.13 | $92.00 |
| 17 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 4 | $1,700.00 | $1,440.00 | $1,521.00 | $2,220.00 |
| 18 | Riprap medium (606.0200) | CY | 588 | $100.00 | $82.00 | $94.71 | $110.00 |
| 19 | MGS guardrail 3 (614.2300) | LF | 525 | $27.00 | $27.00 | $30.85 | $27.00 |
| 20 | MGS guardrail short radius (614.2350) | LF | 124 | $27.00 | $27.00 | $32.00 | $37.00 |
| 21 | MGS thrie beam transition (614.2500) | LF | 312 | $94.00 | $94.00 | $75.00 | $98.00 |
| 22 | MGS guardrail terminal eat (614.2610) | EACH | 5 | $3,333.00 | $4,448.84 | $3,220.00 | $3,890.00 |
| 23 | MGS guardrail short radius terminal (614.2630) | EACH | 3 | $2,333.00 | $3,448.84 | $2,665.00 | $2,210.00 |
| 24 | Mobilization (619.1000) | EACH | 1 | $97,000 | $53,091 | $67,000 | $83,500 |
| 25 | Water (624.0100) | MGAL | 96.90 | $35.00 | $40.00 | $55.00 | $15.00 |
| 26 | Salvaged topsoil (625.0500) | SY | 13,507 | $2.50 | $1.80 | $1.23 | $5.00 |
| 27 | Mulching (627.0200) | SY | 3,479 | $0.42 | $0.42 | $0.01 | $0.50 |
| 28 | Erosion bales (628.1104) | EACH | 6 | $50.00 | $50.00 | $10.00 | $15.00 |
| 29 | Silt fence (628.1504) | LF | 1,585 | $2.75 | $2.75 | $1.85 | $2.20 |
| 30 | Silt fence maintenance (628.1520) | LF | 1,585 | $0.03 | $0.03 | $0.01 | $0.10 |
| 31 | Mobilizations erosion control (628.1905) | EACH | 1 | $625.00 | $625.00 | $1,000.00 | $525.00 |
| 32 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $205.00 | $205.00 | $0.01 | $53.00 |
| 33 | Erosion mat urban class I type B (628.2008) | SY | 7,236 | $1.75 | $1.75 | $0.01 | $2.00 |
| 34 | Inlet protection type B (628.7010) | EACH | 2 | $50.00 | $50.00 | $40.00 | $77.00 |
| 35 | Temporary ditch checks (628.7504) | LF | 120 | $7.25 | $7.25 | $6.00 | $8.00 |
| 36 | Culvert pipe checks (628.7555) | EACH | 9 | $25.00 | $25.00 | $10.00 | $16.00 |
| 37 | Fertilizer type B (629.0210) | CWT | 6.80 | $115.00 | $115.00 | $100.00 | $103.00 |
| 38 | Seeding mixture no. 30 (630.0130) | LB | 193 | $12.00 | $12.00 | $136.50 | $8.00 |
| 39 | Seed water (630.0500) | MGAL | 2,165 | $1.00 | $1.00 | $0.01 | $0.10 |
| 40 | Delineator posts steel (633.0100) | EACH | 9 | $65.00 | $65.00 | $85.00 | $42.00 |
| 41 | Delineator reflectors (633.0500) | EACH | 9 | $30.00 | $30.00 | $30.00 | $11.00 |
| 42 | Markers row (633.5100) | EACH | 5 | $10.00 | $10.00 | $500.00 | $73.00 |
| 43 | Markers culvert end (633.5200) | EACH | 6 | $85.00 | $85.00 | $60.00 | $75.00 |
| 44 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 77 | $95.00 | $95.00 | $110.00 | $79.00 |
| 45 | Signs type II reflective H (637.2210) | SF | 31.50 | $22.00 | $22.00 | $15.00 | $22.00 |
| 46 | Signs type II reflective F (637.2230) | SF | 379.75 | $24.00 | $24.00 | $22.00 | $22.00 |
| 47 | Moving signs type I (638.2101) | EACH | 8 | $150.00 | $150.00 | $100.00 | $125.00 |
| 48 | Removing signs type II (638.2602) | EACH | 24 | $20.00 | $20.00 | $50.00 | $21.00 |
| 49 | Removing small sign supports (638.3000) | EACH | 9 | $20.00 | $20.00 | $50.00 | $21.00 |
| 50 | Field office type B (642.5001) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $9,500.00 |
| 51 | Traffic control drums (643.0300) | DAY | 176 | $1.00 | $1.00 | $1.00 | $1.10 |
| 52 | Traffic control barricades type III (643.0420) | DAY | 236 | $3.00 | $3.00 | $3.00 | $3.20 |
| 53 | Traffic control warning lights type A (643.0705) | DAY | 352 | $0.50 | $0.50 | $0.50 | $0.60 |
| 54 | Traffic control signs (643.0900) | DAY | 494 | $4.50 | $4.50 | $4.50 | $4.80 |
| 55 | Traffic control interim lane closure (643.4100) | EACH | 4 | $100.00 | $1,200.00 | $100.00 | $2,500.00 |
| 56 | Traffic control (643.5000) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $35,000 |
| 57 | Geotextile type HR (645.0120) | SY | 1,527 | $2.50 | $3.10 | $3.99 | $3.50 |
| 58 | Marking line epoxy 6-inch (646.2020) | LF | 111,455 | $0.46 | $0.46 | $0.46 | $0.50 |
| 59 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,100.00 | $2,100.00 | $2,100.00 | $2,205.00 |
| 60 | Construction staking subgrade (650.4500) | LF | 2,261 | $0.01 | $0.01 | $0.01 | $0.10 |
| 61 | Construction staking base (650.5000) | LF | 2,261 | $1.00 | $1.00 | $1.00 | $1.20 |
| 62 | Construction staking pipe culverts (650.6000) | EACH | 3 | $300.00 | $300.00 | $300.00 | $315.00 |
| 63 | Construction staking supplemental control (project) 01. 9488-02-70 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 64 | Construction staking slope stakes (650.9920) | LF | 2,023 | $1.00 | $1.00 | $1.00 | $1.20 |
| 65 | Public land reference monument verify and reset (680.0100) | EACH | 2 | $250.00 | $250.00 | $250.00 | $265.00 |
| 66 | Sawing asphalt (690.0150) | LF | 66 | $2.95 | $3.16 | $1.00 | $4.00 |
| 67 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 2,539 | $3.03 | $3.03 | $3.00 | $6.50 |
| 68 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 2,539 | $0.73 | $0.73 | $0.01 | $1.10 |
| 69 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 70 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 71 | Special 01. railing steel type W modified B-50-2 (SPV.0060) | EACH | 1 | $13,450 | $13,450 | $17,200 | $15,750 |
| 72 | Special 01. infill riprap (SPV.0195) | TON | 130 | $45.00 | $37.65 | $33.82 | $70.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.