| 1 | Grubbing (201.0220) | ID | 91 | $37.50 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 5 | $350.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 323 | $4.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 121,367 | $1.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 146 | $10.00 |
| 6 | Removing guardrail (204.0165) | LF | 2,615 | $2.00 |
| 7 | Removing (item description) 01. existing culvert endwall (204.9060.S) | EACH | 2 | $300.00 |
| 8 | Removing (item description) 01. removing 2-FT X 2-FT box culvert (204.9090.S) | LF | 9 | $150.00 |
| 9 | Removing (item description) 02. removing 3-FT X 2-FT box culvert (204.9090.S) | LF | 15 | $150.00 |
| 10 | Removing (item description) 03. removing small culvert pipe (204.9090.S) | LF | 9 | $350.00 |
| 11 | Excavation common (205.0100) | CY | 10,189 | $16.00 |
| 12 | Prepare foundation for base aggregate (211.0500) | STA | 5.40 | $100.00 |
| 13 | Finishing roadway (project) 01. 5620-00-72 (213.0100) | EACH | 1 | $1,000.00 |
| 14 | Finishing roadway (project) 02. 5620-00-73 (213.0100) | EACH | 1 | $1,000.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,384 | $27.50 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 17,699 | $20.15 |
| 17 | Select crushed material (312.0110) | TON | 359 | $27.85 |
| 18 | Tack coat (455.0605) | GAL | 9,728 | $0.01 |
| 19 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,550.00 |
| 20 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $600.00 |
| 21 | Incentive density PWL HMA pavement (460.2005) | DOL | 40,203 | $1.00 |
| 22 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 8,045 | $1.00 |
| 23 | Incentive air voids HMA pavement (460.2010) | DOL | 40,203 | $1.00 |
| 24 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 17,969 | $74.50 |
| 25 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 13,979 | $74.50 |
| 26 | Asphaltic surface (465.0105) | TON | 58 | $148.00 |
| 27 | Asphaltic surface driveways and field entrances (465.0120) | TON | 158 | $245.00 |
| 28 | Asphaltic flumes (465.0315) | SY | 46 | $108.00 |
| 29 | Asphaltic rumble strips, shoulder (465.0520) | LF | 2,500 | $0.46 |
| 30 | Asphaltic rumble strips, centerline (465.0560) | LF | 40,221 | $0.29 |
| 31 | Precast concrete wingwalls (structure) 01. sta 273+16 (504.1001.S) | EACH | 1 | $3,000.00 |
| 32 | Precast concrete wingwalls (structure) 02. sta 281+13 (504.1001.S) | EACH | 1 | $2,625.00 |
| 33 | Precast concrete box culvert (FT X FT) 01. 2-FT X 2-FT (504.2000.S) | LF | 7 | $810.00 |
| 34 | Precast concrete box culvert (FT X FT) 02. 3-FT X 2-FT (504.2000.S) | LF | 18 | $855.00 |
| 35 | Concrete collars for pipe (520.8000) | EACH | 7 | $1,500.00 |
| 36 | Cleaning culvert pipes (520.8700) | EACH | 12 | $425.00 |
| 37 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 3 | $460.00 |
| 38 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 5 | $525.00 |
| 39 | Apron endwalls for pipe arch steel 28X20-inch (521.1228) | EACH | 3 | $600.00 |
| 40 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 30 | $88.00 |
| 41 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 85 | $146.00 |
| 42 | Pipe arch corrugated steel 28X20- inch (521.3728) | LF | 46 | $153.00 |
| 43 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 72 | $248.00 |
| 44 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,840.00 |
| 45 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 624 | $30.00 |
| 46 | Riprap medium (606.0200) | CY | 55 | $113.00 |
| 47 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 8 | $132.00 |
| 48 | Reconstructing catch basins (611.0410) | EACH | 2 | $700.00 |
| 49 | Inlet covers type H (611.0624) | EACH | 1 | $1,200.00 |
| 50 | Catch basins 2X3-FT (611.1230) | EACH | 1 | $6,350.00 |
| 51 | MGS guardrail 3 (614.2300) | LF | 38 | $26.00 |
| 52 | MGS guardrail 3 K (614.2330) | LF | 1,393 | $38.00 |
| 53 | MGS guardrail 3 L (614.2340) | LF | 546 | $26.50 |
| 54 | MGS guardrail short radius (614.2350) | LF | 104 | $34.00 |
| 55 | MGS thrie beam transition (614.2500) | LF | 160 | $84.00 |
| 56 | MGS guardrail terminal eat (614.2610) | EACH | 16 | $3,450.00 |
| 57 | MGS guardrail short radius terminal (614.2630) | EACH | 4 | $2,400.00 |
| 58 | Maintenance and repair of haul roads (project) 01. 5620-00-72 (618.0100) | EACH | 1 | $1,000.00 |
| 59 | Mobilization (619.1000) | EACH | 1 | $48,661 |
| 60 | Water (624.0100) | MGAL | 472 | $5.46 |
| 61 | Topsoil (625.0100) | SY | 83,316 | $1.50 |
| 62 | Mulching (627.0200) | SY | 46,203 | $0.30 |
| 63 | Silt fence (628.1504) | LF | 6,082 | $1.95 |
| 64 | Silt fence maintenance (628.1520) | LF | 6,082 | $0.01 |
| 65 | Mobilizations erosion control (628.1905) | EACH | 19 | $1.00 |
| 66 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $1.00 |
| 67 | Erosion mat urban class I type B (628.2008) | SY | 6,071 | $1.55 |
| 68 | Inlet protection type B (628.7010) | EACH | 3 | $65.00 |
| 69 | Temporary ditch checks (628.7504) | LF | 619 | $7.50 |
| 70 | Culvert pipe checks (628.7555) | EACH | 55 | $18.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 67 | $88.00 |
| 72 | Seeding mixture no. 30 (630.0130) | LB | 1,109 | $8.75 |
| 73 | Seeding mixture no. 70 (630.0170) | LB | 219 | $175.00 |
| 74 | Seeding nurse crop (630.0400) | LB | 431 | $5.00 |
| 75 | Seed water (630.0500) | MGAL | 1,885 | $10.00 |
| 76 | Markers culvert end (633.5200) | EACH | 9 | $65.00 |
| 77 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 10 | $105.00 |
| 78 | Signs type II reflective F (637.2230) | SF | 66.25 | $25.00 |
| 79 | Moving signs type II (638.2102) | EACH | 22 | $175.00 |
| 80 | Removing signs type II (638.2602) | EACH | 11 | $35.00 |
| 81 | Removing small sign supports (638.3000) | EACH | 10 | $35.00 |
| 82 | Moving small sign supports (638.4000) | EACH | 20 | $150.00 |
| 83 | Field office type C (642.5201) | EACH | 1 | $18,614 |
| 84 | Traffic control barricades type III (643.0420) | DAY | 1,654 | $0.60 |
| 85 | Traffic control warning lights type A (643.0705) | DAY | 3,012 | $0.11 |
| 86 | Traffic control signs (643.0900) | DAY | 11,831 | $0.40 |
| 87 | Traffic control covering signs type II (643.0920) | EACH | 15 | $35.00 |
| 88 | Traffic control signs fixed message (643.1000) | SF | 214 | $19.00 |
| 89 | Traffic control signs PCMS (643.1050) | DAY | 28 | $60.00 |
| 90 | Temporary marking line paint 6- inch (643.3165) | LF | 160,884 | $0.29 |
| 91 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 54 | $18.00 |
| 92 | Traffic control (643.5000) | EACH | 1 | $31,280 |
| 93 | Geotextile type HR (645.0120) | SY | 134 | $7.00 |
| 94 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 149,013 | $1.10 |
| 95 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,600.00 |
| 96 | Marking stop line epoxy 18-inch (646.6120) | LF | 27 | $25.00 |
| 97 | Locating no-passing zones (648.0100) | MI | 1.10 | $2,200.00 |
| 98 | Construction staking storm sewer (650.4000) | EACH | 2 | $250.00 |
| 99 | Construction staking subgrade (650.4500) | LF | 1,250 | $0.01 |
| 100 | Construction staking base (650.5000) | LF | 1,250 | $2.00 |
| 101 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 624 | $3.00 |
| 102 | Construction staking pipe culverts (650.6000) | EACH | 7 | $300.00 |
| 103 | Construction staking structure layout (structure) 01. 3-FT X 2-FT box culvert (650.6501) | EACH | 1 | $400.00 |
| 104 | Construction staking structure layout (structure) 02. 2-FT X 2-FT box culvert (650.6501) | EACH | 1 | $400.00 |
| 105 | Construction staking resurfacing reference (650.8000) | LF | 38,971 | $0.25 |
| 106 | Construction staking supplemental control (project) 01. 5620-00-72 (650.9911) | EACH | 1 | $800.00 |
| 107 | Construction staking supplemental control (project) 02. 5620-00-73 (650.9911) | EACH | 1 | $800.00 |
| 108 | Construction staking slope stakes (650.9920) | LF | 1,250 | $2.00 |
| 109 | Sawing asphalt (690.0150) | LF | 1,777 | $1.65 |
| 110 | Sawing concrete (690.0250) | LF | 16 | $4.00 |
| 111 | Incentive iri ride (740.0440) | DOL | 20,111 | $1.00 |
| 112 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 |
| 113 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 |
| 114 | Special 01. landmark reference monuments (SPV.0060) | EACH | 1 | $1,200.00 |
| 115 | Special 02. site mowing (SPV.0060) | EACH | 3 | $2,500.00 |
| 116 | Special 01. ditch cleaning (SPV.0090) | LF | 700 | $25.00 |
| 117 | Special 01. reprocess and relay (SPV.0180) | SY | 133,895 | $1.00 |
| 118 | Special 02. weed free mulch (SPV.0180) | SY | 23,442 | $0.90 |