WisDOT contract 20260414016 bid tabulation

V Germantown-Fond Du Lac Avenue; Intersection With CTH G (STH 145, Washington County V Germantown - Fond du Lac Ave). Let by Wisconsin DOT on April 14, 2026, Washington. 6 bids received; low bid $1,785,041 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
14 APR 2026
Pay items
144
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$1,785,041Low
2Super Western, Inc.$1,787,2000.0%
3Mashuda Contractors, Inc.$1,792,0290.0%
4James Peterson Sons, Inc.$1,899,893+6.0%
5Vinton Construction Company$1,919,191+8.0%
6Zignego Company, Inc.$1,953,134+9.0%
WisDOT contract 20260414016: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. Super Western, Inc.3. Mashuda Contractors, Inc.4. James Peterson Sons, Inc.5. Vinton Construction Company6. Zignego Company, Inc.
1Grubbing (201.0205)STA5$707.00$718.85$675.00$675.00$300.00$300.00
2Removing small pipe culverts (203.0100)EACH7$447.28$500.00$435.00$675.00$660.00$435.00
3Removing concrete pavement (204.0100)SY3,660$0.01$1.12$1.00$1.00$2.00$1.00
4Removing curb & gutter (204.0150)LF70$5.27$6.69$4.00$10.00$10.00$4.00
5Removing manholes (204.0210)EACH1$554.45$600.00$500.00$500.00$715.00$500.00
6Removing storm sewer (size) 01. 18-inch (204.0245)LF30$15.17$15.00$25.00$25.00$20.14$25.00
7Removing storm sewer (size) 02. 24-inch by 24-inch (204.0245)LF50$17.78$55.00$35.00$25.00$16.00$35.00
8Excavation common (205.0100)CY12,800$10.31$12.36$9.00$16.67$15.40$9.00
9Excavation rock (205.0200)CY200$0.01$10.00$65.00$10.00$0.01$65.00
10Finishing roadway (project) 01. 2475-04-71 (213.0100)EACH1$750.00$1,500.00$125.00$2,000.00$4,000.00$1,000.00
11Base aggregate dense 3/4-inch (305.0110)TON310$25.01$22.51$33.76$34.65$44.60$33.76
12Base aggregate dense 1 1/4-inch (305.0120)TON11,530$17.12$15.84$17.64$18.65$14.96$17.64
13Base aggregate open-graded (310.0110)TON102$30.25$30.78$37.50$28.12$52.00$37.50
14Pit run (313.0110)TON11,300$15.99$14.10$17.57$17.29$15.10$17.57
15Coloring concrete wisdot red (405.0100)CY160$116.75$116.75$116.75$116.75$116.75$100.00
16Concrete truck apron 12-inch (415.2010)SY460$108.00$108.00$108.00$108.00$108.00$120.00
17Tack coat (455.0605)GAL1,460$3.00$3.00$3.00$3.00$3.00$3.00
18Incentive density HMA pavement (460.2000)DOL2,130$1.00$1.00$1.00$1.00$1.00$1.00
19HMA pavement 3 MT 58-28 S (460.6223)TON2,910$70.35$70.35$70.35$70.35$70.35$70.35
20HMA pavement 4 MT 58-28 H (460.6424)TON1,020$74.65$74.65$74.65$74.65$74.65$74.65
21Asphaltic surface driveways and field entrances (465.0120)TON90$142.45$142.45$142.45$142.45$142.45$142.45
22Asphaltic flumes (465.0315)SY70$52.10$52.10$52.10$52.10$52.10$52.10
23Apron endwalls for culvert pipe 15- inch (520.1015)EACH2$420.12$639.00$427.00$385.00$340.00$427.00
24Apron endwalls for culvert pipe 18- inch (520.1018)EACH10$473.85$737.00$470.00$480.00$482.00$470.00
25Culvert pipe class III-A 15-inch (520.3315)LF36$62.04$79.00$50.50$62.00$65.95$50.50
26Culvert pipe class III-A 18-inch (520.3318)LF134$68.05$87.00$57.00$74.00$72.35$57.00
27Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH3$1,554.81$1,922.00$1,055.00$1,500.00$1,329.00$1,055.00
28Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,814.43$2,597.00$1,227.00$1,750.00$1,574.00$1,227.00
29Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH2$2,477.62$3,466.00$1,708.00$2,350.00$2,160.00$1,708.00
30Concrete curb & gutter 18-inch type A (601.0405)LF240$26.15$26.15$26.15$26.15$26.15$34.18
31Concrete curb & gutter 30-inch type D (601.0411)LF1,310$25.00$25.00$25.00$25.00$25.00$39.00
32Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF110$24.15$24.15$24.15$24.15$24.15$47.18
33Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF2,880$22.35$22.35$22.35$22.35$22.35$42.18
34Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF340$31.00$31.00$31.00$31.00$31.00$39.00
35Concrete sidewalk 4-inch (602.0405)SF5,540$5.00$5.00$5.00$5.00$5.35$7.70
36Riprap light (606.0100)CY22$151.11$125.00$140.00$140.00$150.00$140.00
37Riprap medium (606.0200)CY16$163.36$125.00$140.00$160.00$150.00$140.00
38Storm sewer rock excavation (608.0005)CY70$61.51$20.00$80.00$10.00$117.00$80.00
39Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF190$95.94$86.00$74.00$85.00$70.85$74.00
40Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF441$91.98$91.00$83.00$83.00$75.70$83.00
41Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF415$116.03$126.00$109.25$120.00$108.40$109.25
42Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424)LF98$243.15$226.00$209.00$216.00$202.20$209.00
43Manhole covers type J (611.0530)EACH2$1,058.13$794.00$755.00$525.00$541.00$755.00
44Inlet covers type H (611.0624)EACH7$1,629.84$1,030.00$1,005.00$770.00$776.00$1,005.00
45Inlet covers type HM (611.0627)EACH5$1,629.84$1,030.00$1,005.00$770.00$776.00$1,005.00
46Inlet covers type HM-S (611.0636)EACH1$1,629.84$1,030.00$1,005.00$770.00$776.00$1,005.00
47Inlet covers type H-S (611.0639)EACH3$1,629.84$1,030.00$1,005.00$770.00$776.00$1,005.00
48Inlet covers type MS (611.0642)EACH1$760.56$803.00$675.00$525.00$550.00$675.00
49Inlet covers type T (611.0652)EACH3$1,943.29$1,397.00$1,280.00$1,000.00$1,043.00$1,280.00
50Catch basins 4-FT diameter (611.1004)EACH1$2,621.61$2,656.00$3,356.00$3,425.00$3,972.00$3,356.00
51Manholes 5-FT diameter (611.2005)EACH5$3,838.27$4,681.00$4,154.00$4,750.00$5,512.00$4,154.00
52Manholes 6-FT diameter (611.2006)EACH2$5,333.83$5,806.00$5,267.00$6,300.00$6,602.00$5,267.00
53Inlets 4-FT diameter (611.3004)EACH4$2,415.43$2,583.00$2,572.00$3,100.00$3,977.00$2,572.00
54Inlets 2X2.5-FT (611.3225)EACH2$1,423.25$2,126.00$1,761.00$2,350.00$2,469.00$1,761.00
55Inlets 2X3-FT (611.3230)EACH7$1,647.37$2,177.00$1,969.00$2,250.00$2,648.00$1,969.00
56Inlets median 1 grate (611.3901)EACH1$2,712.78$2,337.00$2,790.00$2,800.00$3,188.00$2,790.00
57Pipe underdrain 6-inch (612.0106)LF3,030$5.00$10.74$12.50$10.00$16.30$12.50
58Pipe underdrain unperforated 6- inch (612.0206)LF120$19.39$22.21$24.50$25.00$34.00$24.50
59Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH3$268.09$588.12$350.00$350.00$285.00$350.00
60Maintenance and repair of haul roads (project) 01. 2475-04-71 (618.0100)EACH1$1.00$1.00$100.00$100.00$0.01$1.00
61Mobilization (619.1000)EACH1$123,798$66,889$107,000$58,650$128,697$151,000
62Concrete median sloped nose (620.0300)SF680$18.50$18.50$18.50$18.50$18.50$40.00
63Water (624.0100)MGAL180$0.01$19.48$40.00$10.00$0.01$40.00
64Topsoil (625.0100)SY11,530$0.67$3.21$0.01$4.25$4.50$0.31
65Silt fence (628.1504)LF2,190$1.71$1.71$1.71$1.71$1.90$1.90
66Silt fence maintenance (628.1520)LF2,190$0.05$0.05$0.05$0.05$0.01$0.01
67Mobilizations erosion control (628.1905)EACH9$175.00$175.00$175.00$175.00$50.00$50.00
68Mobilizations emergency erosion control (628.1910)EACH4$75.00$75.00$75.00$75.00$50.00$50.00
69Erosion mat class I type A (628.2002)SY550$1.40$1.40$1.40$1.40$1.00$1.00
70Erosion mat class I type B (628.2004)SY5,260$1.10$1.10$1.10$1.10$0.90$0.90
71Erosion mat urban class I type B (628.2008)SY5,710$1.75$1.75$1.75$1.75$1.89$1.89
72Inlet protection type A (628.7005)EACH1$100.00$100.00$100.00$100.00$50.00$50.00
73Inlet protection type B (628.7010)EACH1$40.00$40.00$40.00$40.00$50.00$50.00
74Inlet protection type C (628.7015)EACH13$38.10$38.10$38.10$38.10$70.00$70.00
75Inlet protection type D (628.7020)EACH12$67.90$67.90$67.90$67.90$100.00$100.00
76Temporary ditch checks (628.7504)LF280$8.00$8.00$8.00$8.00$7.00$7.00
77Culvert pipe checks (628.7555)EACH26$28.10$28.10$28.10$28.10$20.00$20.00
78Rock bags (628.7570)EACH40$8.90$8.90$8.90$8.90$10.00$10.00
79Fertilizer type B (629.0210)CWT7$74.50$74.50$74.50$74.50$80.00$80.00
80Seeding mixture no. 40 (630.0140)LB490$8.99$8.99$8.99$8.99$7.50$7.50
81Seed water (630.0500)MGAL263$12.50$12.50$12.50$12.50$5.00$5.00
82Posts wood 4X6-inch X 12-FT (634.0612)EACH7$69.75$69.75$69.75$69.75$100.00$100.00
83Posts wood 4X6-inch X 14-FT (634.0614)EACH23$72.10$72.10$72.10$72.10$100.00$100.00
84Posts wood 4X6-inch X 16-FT (634.0616)EACH17$74.50$74.50$74.50$74.50$100.00$100.00
85Posts wood 4X6-inch X 20-FT (634.0620)EACH9$86.10$86.10$86.10$86.10$150.00$150.00
86Posts wood 4X6-inch X 22-FT (634.0622)EACH3$86.00$86.00$86.00$86.00$150.00$150.00
87Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH4$140.00$140.00$140.00$140.00$200.00$200.00
88Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH6$195.00$195.00$195.00$195.00$200.00$200.00
89Signs type II reflective H (637.2210)SF523.42$20.10$20.10$20.10$20.10$20.50$20.50
90Signs type II reflective F (637.2230)SF97.75$26.90$26.90$26.90$26.90$22.50$22.50
91Removing signs type II (638.2602)EACH30$18.75$18.75$18.75$18.75$20.00$20.00
92Removing small sign supports (638.3000)EACH26$18.75$18.75$18.75$18.75$15.00$15.00
93Field office type B (642.5001)EACH1$9,500.00$14,101$18,000$18,000$12,500$20,000
94Traffic control drums (643.0300)DAY1,600$0.51$0.50$0.25$0.50$0.50$0.25
95Traffic control barricades type III (643.0420)DAY3,360$0.76$0.75$1.00$0.75$0.75$1.00
96Traffic control warning lights type A (643.0705)DAY4,160$0.25$0.25$0.07$0.25$0.25$0.07
97Traffic control warning lights type C (643.0715)DAY1,600$0.25$0.25$0.10$0.25$0.25$0.10
98Traffic control signs (643.0900)DAY22,640$0.20$0.20$0.30$0.20$0.20$0.30
99Traffic control covering signs type II (643.0920)EACH25$50.50$50.00$35.00$50.00$50.00$35.00
100Traffic control signs PCMS (643.1050)DAY28$50.50$50.00$39.00$50.00$50.00$39.00
101Traffic control (643.5000)EACH1$21,134$20,925$6,750.00$20,925$20,925$6,750.00
102Geotextile type DF schedule A (645.0111)SY1,300$2.40$3.62$3.25$3.50$4.60$3.25
103Geotextile type HR (645.0120)SY72$5.53$6.00$17.50$10.00$5.00$17.50
104Geotextile type R (645.0130)SY90$5.95$6.00$11.50$8.00$5.00$11.50
105Geogrid type SR (645.0220)SY15,000$1.70$1.53$1.35$1.50$1.70$1.35
106Marking line epoxy 4-inch (646.1020)LF3,680$0.51$0.50$0.90$0.50$0.50$0.90
107Marking line grooved wet ref epoxy 6-inch (646.2040)LF7,440$1.48$1.47$2.25$1.47$1.47$2.25
108Marking line grooved wet ref epoxy 10-inch (646.4040)LF260$2.96$2.93$3.85$2.93$2.93$3.85
109Marking outfall epoxy (646.5520)EACH3$51.86$51.35$250.00$51.35$51.35$250.00
110Marking dotted extension epoxy 18-inch (646.6320)LF80$16.74$16.57$15.00$16.57$16.57$15.00
111Marking diagonal epoxy 12-inch (646.7120)LF220$16.30$16.14$11.00$16.14$16.14$11.00
112Marking curb epoxy (646.8120)LF80$8.01$7.93$8.00$7.93$7.93$8.00
113Marking island nose epoxy (646.8220)EACH8$301.13$298.15$350.00$298.15$298.15$350.00
114Construction staking storm sewer (650.4000)EACH29$130.00$130.00$130.00$130.00$130.00$130.00
115Construction staking subgrade (650.4500)LF2,450$0.01$0.01$0.01$0.01$0.01$0.01
116Construction staking base (650.5000)LF2,450$1.00$1.00$1.00$1.00$1.00$1.00
117Construction staking curb gutter and curb & gutter (650.5500)LF4,880$1.10$1.10$1.10$1.10$1.10$1.10
118Construction staking electrical installations (project) 01. 2475-04- 71 (650.8501)EACH1$700.00$700.00$700.00$700.00$700.00$700.00
119Construction staking supplemental control (project) 01. 2475-04-71 (650.9911)EACH1$600.00$600.00$600.00$600.00$600.00$600.00
120Construction staking slope stakes (650.9920)LF2,450$0.90$0.90$0.90$0.90$0.90$0.90
121Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,455$6.58$6.58$6.58$6.58$6.58$6.58
122Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF250$8.54$8.54$8.54$8.54$8.54$8.54
123Pull boxes steel 24X42-inch (653.0140)EACH9$1,461.28$1,461.28$1,461.28$1,461.28$1,461.28$1,461.28
124Concrete bases type 5 (654.0105)EACH13$1,199.35$1,199.35$1,199.35$1,199.35$1,199.35$1,199.35
125Concrete control cabinet bases type L30 (654.0230)EACH1$775.30$775.30$775.30$775.30$775.30$775.30
126Electrical wire lighting 12 AWG (655.0610)LF1,908$0.95$0.95$0.95$0.95$0.95$0.95
127Electrical wire lighting 8 AWG (655.0620)LF9,905$1.64$1.64$1.64$1.64$1.64$1.64
128Electrical wire lighting 1 AWG (655.0640)LF18$4.84$4.84$4.84$4.84$4.84$4.84
129Electrical service meter breaker pedestal (location) 01. HL-66-DG (656.0201)EACH1$1,753.95$1,753.95$1,753.95$1,753.95$1,753.95$1,753.95
130Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH14$782.60$782.60$782.60$782.60$782.60$782.60
131Poles type 5-aluminum (657.0322)EACH14$2,437.78$2,437.78$2,437.78$2,437.78$2,437.78$2,437.78
132Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH4$415.76$415.76$415.76$415.76$415.76$415.76
133Luminaire arms truss type 4 1/2- inch clamp 15-FT (657.0715)EACH10$973.65$973.65$973.65$973.65$973.65$973.65
134Luminaires utility LED A (659.1115)EACH14$320.09$320.09$320.09$320.09$320.09$320.09
135Lighting control cabinets 120/240 30-inch (659.2130)EACH1$9,458.21$9,458.21$9,458.21$9,458.21$9,458.21$9,458.21
136Sawing asphalt (690.0150)LF270$2.00$1.89$3.75$3.75$5.00$1.89
137Incentive compressive strength concrete pavement (715.0720)DOL138$1.00$1.00$1.00$1.00$1.00$1.00
138On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS250$5.00$5.00$5.00$5.00$5.00$5.00
139On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS900$5.00$5.00$5.00$5.00$5.00$5.00
140Special 01. spread footing concrete base type 5 (SPV.0060)EACH1$3,185.75$3,185.75$3,185.75$3,185.75$3,185.75$3,185.75
141Special 02. temporary lighting system, STH 145 roundabout (SPV.0060)EACH1$1,275.18$1,275.18$1,275.18$1,275.18$1,275.18$1,275.18
142Special 10. lighting system integrator (2475-04-71) (SPV.0060)EACH1$1,275.18$1,275.18$1,275.18$1,275.18$1,275.18$1,275.18
143Special 20. lighting system survey (2475-04-71) (SPV.0060)EACH1$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
144Special 01. seeding no mow fescue (SPV.0085)LB25$15.00$15.00$15.00$15.00$10.00$10.00
WisDOT contract 20260414016: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy