WisDOT contract 20260414020 bid tabulation
Stevens Point - Waupaca; Portage Co Line to Anderson Road (USH 010, Waupaca County Stevens Point - Waupaca). Let by Wisconsin DOT on April 14, 2026, Waupaca. 5 bids received; low bid $2,426,244 by Sommers Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 APR 2026
- Pay items
- 71
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sommers Construction Co., Inc. | $2,426,244 | Low |
| 2 | Chippewa Concrete Services, Inc. | $2,495,479 | +3.0% |
| 3 | Vinton Construction Company | $2,627,797 | +8.0% |
| 4 | Zignego Company, Inc. | $2,644,360 | +9.0% |
| 5 | Michels Road & Stone, Inc. | $2,791,648 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sommers Construction Co., Inc. | 2. Chippewa Concrete Services, Inc. | 3. Vinton Construction Company | 4. Zignego Company, Inc. | 5. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 12 | $35.00 | $50.55 | $20.00 | $100.00 | $137.74 |
| 2 | Removing asphaltic surface (204.0110) | SY | 310 | $4.00 | $6.95 | $10.00 | $50.00 | $43.63 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 78 | $19.50 | $19.71 | $19.50 | $19.50 | $19.50 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 69,690 | $0.86 | $0.87 | $0.86 | $0.86 | $0.86 |
| 5 | Removing guardrail (204.0165) | LF | 1,111 | $3.00 | $2.81 | $3.00 | $2.00 | $3.00 |
| 6 | Removing delineators and markers (204.0180) | EACH | 35 | $25.00 | $20.22 | $25.00 | $20.00 | $25.00 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 6290-05-61 (211.0101) | EACH | 1 | $1,975.00 | $1,996.73 | $1,975.00 | $1,975.00 | $1,975.00 |
| 8 | Finishing roadway (project) 01. 6290-05-61 (213.0100) | EACH | 1 | $2,500.00 | $3,538.50 | $4,000.00 | $1,000.00 | $5,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,706 | $29.65 | $25.07 | $40.00 | $34.00 | $39.10 |
| 10 | Concrete pavement 6-inch (415.0060) | SY | 12 | $85.00 | $101.10 | $105.00 | $200.00 | $208.38 |
| 11 | Rout and seal (415.6000.S) | LF | 101,210 | $0.73 | $0.74 | $1.25 | $0.73 | $0.65 |
| 12 | Drilled tie bars (416.0610) | EACH | 1,500 | $8.00 | $8.09 | $10.00 | $12.00 | $17.88 |
| 13 | Drilled dowel bars (416.0620) | EACH | 3,900 | $14.70 | $15.17 | $16.55 | $17.00 | $23.93 |
| 14 | Concrete pavement repair (416.1710) | SY | 1,700 | $85.57 | $96.05 | $104.35 | $117.00 | $89.97 |
| 15 | Concrete pavement replacement (416.1720) | SY | 5,700 | $85.57 | $96.05 | $108.35 | $106.00 | $95.53 |
| 16 | Continuous diamond grinding concrete pavement (420.1000) | SY | 11,300 | $7.50 | $6.67 | $6.67 | $7.60 | $6.60 |
| 17 | Tack coat (455.0605) | GAL | 4,877 | $3.94 | $3.98 | $3.94 | $3.94 | $3.94 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 4,380 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 6,831 | $77.18 | $78.03 | $77.18 | $77.18 | $77.18 |
| 20 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 50,525 | $0.14 | $0.14 | $0.14 | $0.14 | $0.18 |
| 21 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 48,625 | $0.88 | $0.89 | $0.88 | $0.88 | $0.67 |
| 22 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $3,850.00 | $2,267.17 | $3,450.00 | $4,133.00 | $3,774.84 |
| 23 | MGS guardrail 3 (614.2300) | LF | 750 | $30.00 | $29.82 | $30.00 | $26.00 | $30.00 |
| 24 | MGS thrie beam transition (614.2500) | LF | 157.60 | $90.00 | $94.53 | $90.00 | $90.00 | $90.00 |
| 25 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,000.00 | $3,841.80 | $4,000.00 | $3,433.00 | $4,000.00 |
| 26 | Maintenance and repair of haul roads (project) 01. 6290-05-61 (618.0100) | EACH | 1 | $0.01 | $1,011.00 | $0.01 | $1.00 | $0.01 |
| 27 | Mobilization (619.1000) | EACH | 1 | $124,700 | $119,247 | $96,000 | $135,000 | $344,410 |
| 28 | Water (624.0100) | MGAL | 33 | $55.00 | $25.28 | $30.00 | $1.00 | $75.00 |
| 29 | Silt fence (628.1504) | LF | 1,000 | $2.50 | $2.88 | $2.50 | $2.50 | $2.50 |
| 30 | Silt fence maintenance (628.1520) | LF | 2,000 | $0.01 | $0.10 | $0.01 | $0.03 | $0.01 |
| 31 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $252.75 | $100.00 | $203.00 | $100.00 |
| 32 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $100.00 | $505.50 | $100.00 | $213.00 | $100.00 |
| 33 | Rock bags (628.7570) | EACH | 50 | $22.00 | $8.59 | $22.00 | $12.00 | $22.00 |
| 34 | Delineator posts steel (633.0100) | EACH | 70 | $40.00 | $75.93 | $40.00 | $38.00 | $40.00 |
| 35 | Delineator reflectors (633.0500) | EACH | 70 | $10.00 | $7.58 | $10.00 | $20.00 | $10.00 |
| 36 | Field office type C (642.5201) | EACH | 1 | $8,500.00 | $10,110 | $12,000 | $15,000 | $11,000 |
| 37 | Traffic control drums (643.0300) | DAY | 90,000 | $0.18 | $0.25 | $0.18 | $0.18 | $0.25 |
| 38 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 170 | $105.00 | $53.88 | $105.00 | $105.00 | $53.29 |
| 39 | Traffic control barricades type III (643.0420) | DAY | 1,500 | $1.00 | $1.01 | $1.00 | $1.00 | $1.00 |
| 40 | Traffic control warning lights type A (643.0705) | DAY | 3,000 | $0.15 | $0.11 | $0.15 | $0.15 | $0.11 |
| 41 | Traffic control warning lights type C (643.0715) | DAY | 5,500 | $0.15 | $0.13 | $0.15 | $0.15 | $0.13 |
| 42 | Traffic control connected arrow boards (643.0810) | DAY | 170 | $13.50 | $20.22 | $13.50 | $13.50 | $20.00 |
| 43 | Traffic control signs (643.0900) | DAY | 8,000 | $0.22 | $0.51 | $0.22 | $0.22 | $0.50 |
| 44 | Traffic control covering signs type II (643.0920) | EACH | 4 | $125.00 | $60.66 | $125.00 | $125.00 | $60.00 |
| 45 | Traffic control signs fixed message (643.1000) | SF | 97.25 | $20.00 | $20.22 | $20.00 | $20.00 | $20.00 |
| 46 | Traffic control cones 42-inch (643.1070) | DAY | 50,500 | $0.18 | $0.25 | $0.18 | $0.18 | $0.25 |
| 47 | Basic traffic queue warning system (643.1205.S) | DAY | 170 | $80.00 | $81.67 | $80.00 | $80.00 | $80.78 |
| 48 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 170 | $11.00 | $20.22 | $11.00 | $11.00 | $20.00 |
| 49 | Temporary marking line removable tape 6-inch (643.3180) | LF | 7,380 | $1.75 | $2.53 | $1.75 | $1.75 | $2.50 |
| 50 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,200 | $3.50 | $4.55 | $3.50 | $3.50 | $4.50 |
| 51 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 586 | $2.75 | $3.14 | $2.75 | $2.75 | $3.11 |
| 52 | Traffic control (643.5000) | EACH | 1 | $77,250 | $50,778 | $77,250 | $77,250 | $50,226 |
| 53 | Marking line epoxy 6-inch (646.2020) | LF | 1,257 | $0.47 | $0.81 | $0.47 | $0.47 | $0.70 |
| 54 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 14,474 | $0.85 | $1.16 | $0.85 | $0.85 | $0.95 |
| 55 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 106,670 | $1.33 | $1.42 | $1.33 | $1.33 | $1.45 |
| 56 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 14,410 | $6.90 | $7.38 | $6.90 | $6.90 | $7.25 |
| 57 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 7,575 | $12.05 | $14.15 | $12.05 | $12.05 | $12.25 |
| 58 | Marking arrow epoxy (646.5020) | EACH | 40 | $376.43 | $298.25 | $376.43 | $376.43 | $300.00 |
| 59 | Marking word epoxy (646.5120) | EACH | 20 | $380.99 | $343.74 | $380.99 | $380.99 | $400.00 |
| 60 | Marking stop line epoxy 18-inch (646.6120) | LF | 190 | $15.78 | $25.28 | $15.78 | $15.78 | $19.00 |
| 61 | Cold weather marking epoxy 6-inch (646.6466) | LF | 3,250 | $0.01 | $0.34 | $0.47 | $0.47 | $0.75 |
| 62 | Cold weather marking epoxy 10- inch (646.6470) | LF | 100 | $0.01 | $0.81 | $1.05 | $1.05 | $1.25 |
| 63 | Marking removal line grooved contrast permanent tape 4-inch (646.9055) | LF | 14,474 | $1.65 | $0.01 | $1.65 | $1.65 | $1.70 |
| 64 | Construction staking resurfacing reference (650.8000) | LF | 57,880 | $0.12 | $0.08 | $0.12 | $0.12 | $0.12 |
| 65 | Construction staking supplemental control (project) 01. 6290-05-61 (650.9911) | EACH | 1 | $5.00 | $2,527.50 | $5.00 | $5.00 | $5.00 |
| 66 | Sawing asphalt (690.0150) | LF | 1,123 | $1.40 | $1.42 | $2.50 | $3.40 | $1.40 |
| 67 | Sawing concrete (690.0250) | LF | 11,900 | $2.20 | $2.22 | $2.50 | $3.20 | $2.20 |
| 68 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 750 | $5.00 | $5.91 | $5.00 | $4.03 | $5.00 |
| 70 | Special 01. removing raised pavement markers and filling void (SPV.0060) | EACH | 254 | $85.00 | $75.83 | $75.00 | $25.00 | $150.00 |
| 71 | Special 02. digital speed limit trailer pad (SPV.0060) | EACH | 11 | $1,000.00 | $1,516.50 | $0.01 | $1,000.00 | $666.04 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.