| 1 | Grubbing (201.0210) | SY | 2,226 | $2.30 | $11.15 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 4 | $625.00 | $1,125.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 770 | $7.50 | $7.05 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,189 | $9.75 | $6.50 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 139,067 | $1.65 | $0.85 |
| 6 | Removing curb & gutter (204.0150) | LF | 145 | $8.00 | $8.70 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 78 | $10.00 | $14.80 |
| 8 | Excavation common (205.0100) | CY | 2,294 | $18.19 | $24.20 |
| 9 | Borrow (208.0100) | CY | 148 | $0.01 | $43.65 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 6530-01-70 (211.0101) | EACH | 1 | $12,000 | $14,433 |
| 11 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 3 | $215.00 | $463.00 |
| 12 | Finishing roadway (project) 01. 6530-01-70 (213.0100) | EACH | 1 | $2,500.00 | $4,338.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,949 | $26.40 | $24.85 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,517 | $24.06 | $22.10 |
| 15 | Drilled tie bars (416.0610) | EACH | 14 | $16.03 | $32.20 |
| 16 | Drilled dowel bars (416.0620) | EACH | 134 | $19.79 | $21.40 |
| 17 | Concrete pavement repair (416.1710) | SY | 48 | $182.34 | $186.60 |
| 18 | Concrete pavement replacement (416.1720) | SY | 55 | $182.34 | $147.75 |
| 19 | HMA cold weather paving (450.4000) | TON | 3,025 | $0.01 | $0.01 |
| 20 | Tack coat (455.0605) | GAL | 10,110 | $3.00 | $3.05 |
| 21 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,800.00 | $2,628.00 |
| 22 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $4,700.00 | $5,645.00 |
| 23 | Incentive density PWL HMA pavement (460.2005) | DOL | 11,110 | $1.00 | $1.00 |
| 24 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 7,420 | $1.00 | $1.00 |
| 25 | Incentive air voids HMA pavement (460.2010) | DOL | 15,910 | $1.00 | $1.00 |
| 26 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 15,907 | $69.40 | $94.20 |
| 27 | Asphaltic surface (465.0105) | TON | 629 | $130.00 | $195.25 |
| 28 | Asphaltic surface patching (465.0110) | TON | 224 | $130.00 | $176.60 |
| 29 | Asphaltic surface driveways and field entrances (465.0120) | TON | 71 | $130.00 | $176.60 |
| 30 | Asphaltic flumes (465.0315) | SY | 31 | $65.00 | $61.30 |
| 31 | Asphaltic rumble strips, shoulder (465.0520) | LF | 2,895 | $1.20 | $0.65 |
| 32 | Asphaltic rumble strips, centerline (465.0560) | LF | 23,940 | $0.55 | $0.45 |
| 33 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $587.00 | $560.00 |
| 34 | Culvert pipe class III-B non-metal 24-inch (520.3624) | LF | 55 | $156.50 | $131.00 |
| 35 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 204 | $133.00 | $148.00 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,449.00 | $1,607.00 |
| 37 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 146 | $53.33 | $92.40 |
| 38 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 105 | $55.36 | $83.70 |
| 39 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 302 | $55.36 | $54.50 |
| 40 | Concrete sidewalk 4-inch (602.0405) | SF | 242 | $12.00 | $18.34 |
| 41 | Concrete sidewalk 5-inch (602.0410) | SF | 947 | $13.17 | $24.70 |
| 42 | Curb ramp detectable warning field yellow (602.0505) | SF | 70 | $60.38 | $43.00 |
| 43 | Riprap light (606.0100) | CY | 20 | $115.00 | $373.00 |
| 44 | Adjusting manhole covers (611.8110) | EACH | 1 | $900.00 | $1,275.00 |
| 45 | Adjusting inlet covers (611.8115) | EACH | 2 | $1,200.00 | $1,875.00 |
| 46 | Maintenance and repair of haul roads (project) 01. 6530-01-70 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 47 | Mobilization (619.1000) | EACH | 1 | $225,000 | $178,301 |
| 48 | Water (624.0100) | MGAL | 111 | $50.00 | $42.20 |
| 49 | Topsoil (625.0100) | SY | 3,153 | $4.00 | $6.20 |
| 50 | Silt fence (628.1504) | LF | 391 | $5.00 | $3.25 |
| 51 | Silt fence maintenance (628.1520) | LF | 391 | $0.01 | $0.10 |
| 52 | Mobilizations erosion control (628.1905) | EACH | 5 | $100.00 | $425.00 |
| 53 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $200.00 | $180.00 |
| 54 | Erosion mat class I type B (628.2004) | SY | 2,663 | $1.00 | $2.25 |
| 55 | Erosion mat urban class I type B (628.2008) | SY | 538 | $2.00 | $3.10 |
| 56 | Inlet protection type B (628.7010) | EACH | 3 | $60.00 | $75.00 |
| 57 | Culvert pipe checks (628.7555) | EACH | 12 | $30.00 | $50.00 |
| 58 | Fertilizer type B (629.0210) | CWT | 3 | $100.00 | $145.00 |
| 59 | Seeding mixture no. 20 (630.0120) | LB | 79 | $7.90 | $14.00 |
| 60 | Seed water (630.0500) | MGAL | 66 | $0.01 | $77.00 |
| 61 | Markers culvert end (633.5200) | EACH | 6 | $60.00 | $70.00 |
| 62 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 7 | $100.00 | $105.00 |
| 63 | Signs type II reflective H (637.2210) | SF | 52.38 | $28.00 | $38.15 |
| 64 | Removing signs type II (638.2602) | EACH | 12 | $30.00 | $41.00 |
| 65 | Removing small sign supports (638.3000) | EACH | 8 | $30.00 | $36.90 |
| 66 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $14,228 |
| 67 | Traffic control drums (643.0300) | DAY | 407 | $0.35 | $0.55 |
| 68 | Traffic control barricades type III (643.0420) | DAY | 432 | $0.70 | $0.80 |
| 69 | Traffic control warning lights type A (643.0705) | DAY | 499 | $0.11 | $0.55 |
| 70 | Traffic control signs (643.0900) | DAY | 4,184 | $0.51 | $0.65 |
| 71 | Traffic control covering signs type II (643.0920) | EACH | 12 | $42.14 | $103.00 |
| 72 | Traffic control signs fixed message (643.1000) | SF | 108 | $40.00 | $32.25 |
| 73 | Temporary marking line paint 6- inch (643.3165) | LF | 49,588 | $0.40 | $0.40 |
| 74 | Traffic control (643.5000) | EACH | 1 | $25,452 | $3,212.00 |
| 75 | Temporary pedestrian barricade (644.1810) | LF | 205 | $6.00 | $12.25 |
| 76 | Geotextile type R (645.0130) | SY | 232 | $5.50 | $5.25 |
| 77 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 122,078 | $1.24 | $1.55 |
| 78 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 412 | $2.21 | $3.05 |
| 79 | Marking stop line epoxy 18-inch (646.6120) | LF | 59 | $18.21 | $16.25 |
| 80 | Cold weather marking epoxy 6-inch (646.6466) | LF | 31,000 | $0.01 | $0.20 |
| 81 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 377 | $18.81 | $11.00 |
| 82 | Marking parking stall epoxy (646.8320) | LF | 53 | $37.55 | $7.00 |
| 83 | Construction staking base (650.5000) | LF | 519 | $0.01 | $1.55 |
| 84 | Construction staking pipe culverts (650.6000) | EACH | 3 | $115.93 | $115.00 |
| 85 | Construction staking resurfacing reference (650.8000) | LF | 37,493 | $0.15 | $0.15 |
| 86 | Construction staking curb ramps (650.9000) | EACH | 6 | $200.00 | $125.00 |
| 87 | Construction staking sidewalk (project) 01. 6530-01-70 (650.9500) | EACH | 1 | $219.36 | $310.00 |
| 88 | Construction staking supplemental control (project) 01. 6530-01-70 (650.9911) | EACH | 1 | $560.39 | $1,220.00 |
| 89 | Construction staking slope stakes (650.9920) | LF | 964 | $0.93 | $2.10 |
| 90 | Public land survey monument verify and reset (680.0100) | EACH | 6 | $856.18 | $852.00 |
| 91 | Sawing asphalt (690.0150) | LF | 913 | $1.74 | $1.90 |
| 92 | Sawing concrete (690.0250) | LF | 87 | $3.50 | $2.35 |
| 93 | Incentive iri ride (740.0440) | DOL | 28,100 | $1.00 | $1.00 |
| 94 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 293 | $0.01 | $6.00 |
| 95 | Special 01. remove, salvage, and reinstall riprap light (SPV.0035) | CY | 50 | $120.00 | $166.00 |
| 96 | Special 01. mortar pipe joint (SPV.0060) | EACH | 1 | $1,500.00 | $2,300.00 |
| 97 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 2,000 | $5.00 | $8.45 |