WisDOT contract 20260512002 bid tabulation
5155-02-74. Let by Wisconsin DOT on May 12, 2026, Rock. 5 bids received; low bid $4,955,953 by Mashuda Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 12 MAY 2026
- Pay items
- 106
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mashuda Contractors, Inc. | $4,955,953 | Low |
| 2 | Payne and Dolan, Inc | $4,968,254 | 0.0% |
| 3 | James Peterson Sons, Inc. | $5,110,551 | +3.0% |
| 4 | Rock Road Companies, Inc. | $5,349,831 | +8.0% |
| 5 | Hoffman Construction Company | $5,894,277 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mashuda Contractors, Inc. | 2. Payne and Dolan, Inc | 3. James Peterson Sons, Inc. | 4. Rock Road Companies, Inc. | 5. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 17 | $340.00 | $345.00 | $450.00 | $345.00 | $345.00 |
| 2 | Grubbing (201.0220) | ID | 48 | $55.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 11 | $395.00 | $395.00 | $675.00 | $477.61 | $550.00 |
| 4 | Removing structure (structure) 01. C-13-2043 (203.0220) | EACH | 1 | $1,750.00 | $1,750.00 | $6,000.00 | $9,194.02 | $3,200.00 |
| 5 | Removing concrete pavement (204.0100) | SY | 12,200 | $0.70 | $0.70 | $1.20 | $3.12 | $20.00 |
| 6 | Removing asphaltic surface (204.0110) | SY | 230 | $5.00 | $5.00 | $33.24 | $14.99 | $4.50 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 141 | $0.10 | $0.10 | $0.10 | $6.68 | $0.10 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 72,890 | $0.10 | $0.10 | $0.10 | $0.75 | $0.10 |
| 9 | Excavation common (205.0100) | CY | 69,340 | $6.75 | $6.75 | $8.40 | $10.38 | $20.00 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 5155-02-74 (211.0101) | EACH | 1 | $100.00 | $0.01 | $29,300 | $0.01 | $500.00 |
| 11 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 360 | $50.00 | $50.00 | $50.00 | $10.04 | $50.00 |
| 12 | Finishing roadway (project) 01. 5155-02-74 (213.0100) | EACH | 1 | $400.00 | $0.01 | $3,100.00 | $4,405.42 | $500.00 |
| 13 | Finishing roadway (project) 02. 5155-02-75 (213.0100) | EACH | 1 | $400.00 | $0.01 | $1,250.00 | $4,405.42 | $500.00 |
| 14 | Obliterating old road (214.0100) | STA | 4 | $400.00 | $400.00 | $550.00 | $0.01 | $1,000.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,080 | $24.34 | $24.34 | $26.30 | $28.64 | $25.30 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 39,979 | $15.11 | $15.11 | $13.72 | $9.63 | $0.23 |
| 17 | Base aggregate dense 3-inch (305.0130) | TON | 1,910 | $17.26 | $17.26 | $16.00 | $14.36 | $16.47 |
| 18 | Select crushed material (312.0110) | TON | 26,740 | $15.58 | $15.58 | $13.67 | $13.61 | $0.01 |
| 19 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 42 | $673.00 | $673.00 | $725.00 | $396.05 | $620.83 |
| 20 | HMA cold weather paving (450.4000) | TON | 3,518 | $2.00 | $2.00 | $2.00 | $0.01 | $2.00 |
| 21 | Tack coat (455.0605) | GAL | 14,271 | $0.01 | $0.01 | $0.01 | $3.40 | $0.01 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $100.00 | $100.00 | $100.00 | $3,500.00 | $100.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $100.00 | $100.00 | $100.00 | $3,500.00 | $100.00 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 2,620 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,840 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 10,057 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 26,955 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 17,896 | $73.45 | $75.45 | $73.45 | $72.13 | $73.45 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 13,010 | $74.65 | $76.65 | $74.65 | $74.88 | $74.65 |
| 30 | Asphaltic surface (465.0105) | TON | 415 | $91.10 | $91.10 | $91.10 | $99.42 | $91.10 |
| 31 | Asphaltic surface driveways and field entrances (465.0120) | TON | 205 | $150.00 | $150.00 | $150.00 | $135.06 | $150.00 |
| 32 | Asphaltic flumes (465.0315) | SY | 138 | $50.00 | $18.46 | $50.00 | $61.34 | $50.00 |
| 33 | Asphaltic rumble strips, shoulder (465.0520) | LF | 37,190 | $0.32 | $0.30 | $0.32 | $0.18 | $0.21 |
| 34 | Asphaltic rumble strips, centerline (465.0560) | LF | 21,567 | $0.32 | $0.46 | $0.32 | $0.18 | $0.24 |
| 35 | Resin binder high friction surface treatment (490.0100.S) | SY | 4,100 | $23.00 | $23.00 | $21.97 | $22.43 | $23.00 |
| 36 | Concrete collars for pipe (520.8000) | EACH | 1 | $750.00 | $750.00 | $1,000.00 | $981.35 | $700.00 |
| 37 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 20 | $412.00 | $412.00 | $264.00 | $504.20 | $450.00 |
| 38 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $470.00 | $470.00 | $373.00 | $642.74 | $550.00 |
| 39 | Apron endwalls for pipe arch steel 28X20-inch (521.1228) | EACH | 2 | $451.00 | $451.00 | $353.00 | $513.51 | $500.00 |
| 40 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 356 | $65.50 | $65.50 | $64.64 | $76.38 | $70.00 |
| 41 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 28 | $83.50 | $83.50 | $76.42 | $79.92 | $72.00 |
| 42 | Pipe arch corrugated steel 28X20- inch (521.3728) | LF | 54 | $83.25 | $53.25 | $77.35 | $89.58 | $70.00 |
| 43 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 14X23-inch (522.2314) | LF | 68 | $120.75 | $120.75 | $110.95 | $129.44 | $110.00 |
| 44 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (522.2414) | LF | 146 | $114.50 | $114.50 | $115.79 | $144.31 | $130.00 |
| 45 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 174 | $146.00 | $146.00 | $142.53 | $171.86 | $150.00 |
| 46 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614) | EACH | 6 | $791.00 | $791.00 | $1,295.00 | $977.61 | $1,800.00 |
| 47 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 4 | $985.00 | $985.00 | $1,485.00 | $1,163.94 | $2,000.00 |
| 48 | Culvert pipe salvaged 18-inch (524.0118) | LF | 50 | $58.50 | $58.50 | $78.00 | $58.26 | $48.00 |
| 49 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 471 | $37.50 | $37.50 | $37.50 | $37.50 | $37.50 |
| 50 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 476 | $37.50 | $37.50 | $37.50 | $37.50 | $37.50 |
| 51 | Maintenance and repair of haul roads (project) 01. 5155-02-74 (618.0100) | EACH | 1 | $1.00 | $0.01 | $750.00 | $0.01 | $500.00 |
| 52 | Maintenance and repair of haul roads (project) 02. 5155-02-75 (618.0100) | EACH | 1 | $1.00 | $0.01 | $750.00 | $0.01 | $500.00 |
| 53 | Mobilization (619.1000) | EACH | 1 | $173,673 | $125,000 | $253,092 | $499,000 | $749,404 |
| 54 | Water (624.0100) | MGAL | 594 | $30.00 | $30.00 | $7.50 | $0.01 | $110.00 |
| 55 | Salvaged topsoil (625.0500) | SY | 41,440 | $0.01 | $0.01 | $0.59 | $0.01 | $4.50 |
| 56 | Silt fence (628.1504) | LF | 3,490 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 57 | Silt fence maintenance (628.1520) | LF | 3,490 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 58 | Mobilizations erosion control (628.1905) | EACH | 9 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 59 | Mobilizations emergency erosion control (628.1910) | EACH | 9 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 60 | Erosion mat class I type B (628.2004) | SY | 41,440 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 61 | Temporary ditch checks (628.7504) | LF | 64 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 62 | Culvert pipe checks (628.7555) | EACH | 17 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 63 | Fertilizer type B (629.0210) | CWT | 33 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 64 | Seeding mixture no. 30 (630.0130) | LB | 1,011 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 65 | Seeding temporary (630.0200) | LB | 1,011 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 66 | Seed water (630.0500) | MGAL | 1,272 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 67 | Markers culvert end (633.5200) | EACH | 13 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 68 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 20 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 69 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 17 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 70 | Signs type II reflective H (637.2210) | SF | 45 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 71 | Moving signs type II (638.2102) | EACH | 27 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 72 | Removing signs type II (638.2602) | EACH | 1 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 73 | Removing small sign supports (638.3000) | EACH | 32 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 74 | Field office type B (642.5001) | EACH | 1 | $10,500 | $14,550 | $10,250 | $8,100.00 | $5,000.00 |
| 75 | Traffic control drums (643.0300) | DAY | 1,475 | $0.28 | $0.25 | $0.25 | $0.25 | $0.28 |
| 76 | Traffic control barricades type III (643.0420) | DAY | 2,490 | $0.75 | $0.55 | $0.55 | $0.55 | $0.75 |
| 77 | Traffic control warning lights type A (643.0705) | DAY | 4,980 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 78 | Traffic control signs (643.0900) | DAY | 45,215 | $0.31 | $0.14 | $0.14 | $0.14 | $0.31 |
| 79 | Traffic control covering signs type I (643.0910) | EACH | 4 | $200.00 | $285.00 | $285.00 | $285.00 | $200.00 |
| 80 | Traffic control covering signs type II (643.0920) | EACH | 17 | $35.00 | $100.00 | $100.00 | $100.00 | $35.00 |
| 81 | Traffic control signs fixed message (643.1000) | SF | 1 | $20.00 | $1,315.00 | $1,315.00 | $1,315.00 | $20.00 |
| 82 | Traffic control signs PCMS (643.1050) | DAY | 35 | $65.00 | $12.50 | $12.50 | $12.50 | $65.00 |
| 83 | Temporary marking line paint 6- inch (643.3165) | LF | 75,268 | $0.40 | $0.21 | $0.21 | $0.21 | $0.21 |
| 84 | Traffic control (643.5000) | EACH | 1 | $15,695 | $44,000 | $44,000 | $50,205 | $15,695 |
| 85 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 103,922 | $1.31 | $1.18 | $1.18 | $1.26 | $1.18 |
| 86 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,455 | $2.75 | $2.71 | $2.71 | $2.71 | $2.71 |
| 87 | Marking arrow epoxy (646.5020) | EACH | 14 | $230.00 | $368.73 | $368.73 | $368.73 | $368.73 |
| 88 | Marking word epoxy (646.5120) | EACH | 7 | $250.00 | $373.20 | $373.20 | $373.20 | $373.20 |
| 89 | Marking stop line epoxy 18-inch (646.6120) | LF | 164 | $12.00 | $15.46 | $15.46 | $15.46 | $15.46 |
| 90 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,487 | $9.75 | $11.77 | $11.77 | $11.77 | $11.77 |
| 91 | Locating no-passing zones (648.0100) | MI | 6 | $375.00 | $485.20 | $485.20 | $485.20 | $485.20 |
| 92 | Construction staking subgrade (650.4500) | LF | 8,706 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 93 | Construction staking base (650.5000) | LF | 8,872 | $1.15 | $1.15 | $1.15 | $0.01 | $1.15 |
| 94 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 947 | $2.00 | $2.00 | $2.00 | $0.20 | $2.00 |
| 95 | Construction staking pipe culverts (650.6000) | EACH | 17 | $300.00 | $300.00 | $300.00 | $15.00 | $300.00 |
| 96 | Construction staking resurfacing reference (650.8000) | LF | 24,342 | $0.13 | $0.13 | $0.13 | $0.03 | $0.13 |
| 97 | Construction staking supplemental control (project) 01. 5155-02-74 (650.9911) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 98 | Construction staking supplemental control (project) 02. 5155-02-75 (650.9911) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 99 | Construction staking slope stakes (650.9920) | LF | 12,822 | $1.00 | $1.00 | $1.00 | $0.11 | $1.00 |
| 100 | Sawing asphalt (690.0150) | LF | 1,894 | $1.35 | $1.35 | $1.35 | $1.69 | $1.35 |
| 101 | Sawing concrete (690.0250) | LF | 80 | $2.30 | $2.30 | $2.30 | $2.50 | $2.30 |
| 102 | Incentive iri ride (740.0440) | DOL | 21,131 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 3,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 104 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 105 | Special 01. verify landmark reference monuments (SPV.0060) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $250.00 | $1,000.00 |
| 106 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 3,656 | $2.00 | $2.00 | $2.00 | $5.22 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.