WisDOT contract 20260512009 bid tabulation

Division Rd Wetland Mitigation Site; Cedar Lane to Spring Valley Road (NON HWY, Washington County Division Rd Wetland Mitigation Site). Let by Wisconsin DOT on May 12, 2026, Washington. 3 bids received; low bid $999,951 by Mashuda Contractors, Inc..

Owner
Wisconsin DOT
Letting
12 MAY 2026
Pay items
36
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mashuda Contractors, Inc.$999,951Low
2Super Western, Inc.$1,044,168+4.0%
3Musson Bros., Inc.$1,282,943+28%
WisDOT contract 20260512009: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mashuda Contractors, Inc.2. Super Western, Inc.3. Musson Bros., Inc.
1Clearing (201.0115)ACRE6.80$4,009.00$4,009.00$4,009.00
2Grubbing (201.0215)ACRE6.80$1,055.00$1,055.00$1,055.00
3Removing small pipe culverts (203.0100)EACH6$500.00$398.73$196.28
4Excavation common (205.0100)CY49,000$9.21$8.38$8.72
5Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH2$461.00$956.00$400.02
6Culvert pipe corrugated steel 12- inch (521.3112)LF19$126.00$88.00$103.43
7Riprap medium (606.0200)CY143$160.00$138.29$137.13
8Fence temporary (616.0600.S)LF2,674$4.00$15.00$4.00
9Maintenance and repair of haul roads (project) 01. 1009-23-72 (618.0100)EACH1$1.00$1.00$100.00
10Mobilization (619.1000)EACH1$64,378$222,248$235,851
11Salvaged topsoil (625.0500)SY32,100$1.25$4.90$1.12
12Mulching (627.0200)SY12,900$0.60$0.30$0.60
13Silt fence (628.1504)LF8,426$1.70$1.90$1.70
14Silt fence maintenance (628.1520)LF8,426$0.10$0.01$0.10
15Mobilizations erosion control (628.1905)EACH2$250.00$100.00$250.00
16Mobilizations emergency erosion control (628.1910)EACH3$125.00$100.00$125.00
17Temporary ditch checks (628.7504)LF920$9.20$7.00$9.20
18Culvert pipe checks (628.7555)EACH1$65.00$20.00$65.00
19Tracking pads (628.7560)EACH3$3,500.00$1.00$100.00
20Field office type C (642.5201)EACH1$10,500$11,587$12,500
21Traffic control barricades type III (643.0420)DAY184$0.50$0.50$0.50
22Traffic control signs (643.0900)DAY828$0.50$0.50$0.50
23Traffic control (643.5000)EACH1$1,650.00$1,650.00$1,650.00
24Geotextile type HR (645.0120)SY219$10.00$7.44$4.77
25Construction staking pipe culverts (650.6000)EACH1$750.00$1,000.00$1,000.00
26Construction staking supplemental control (project) 01. 1009-23-72 (650.9911)EACH1$1,250.00$4,000.00$1,500.00
27Special 01. clay borrow material (SPV.0035)CY102$95.00$21.04$59.09
28Special 02. removal of unsuitable materials (SPV.0035)CY40$100.00$34.43$241.17
29Special 01. construction staking wetland site (SPV.0060)EACH1$4,577.00$5,000.00$4,577.00
30Special 01. seeding temporary (SPV.0085)LB9,800$5.18$1.00$5.18
31Special 02. wetland meadow native seeding mixture A (SPV.0085)LB650$186.19$15.00$186.19
32Special 03. wooded swamp/shrub swamp native seeding mixture B (SPV.0085)LB111$230.28$20.00$230.28
33Special 04. upland buffer prairie native seeding mixture C (SPV.0085)LB9$299.02$50.00$299.02
34Special 05. upland buffer forest native seeding mixture D (SPV.0085)LB9$325.97$50.00$325.97
35Special 06. wetland meadow no credit areas native seeding mixture E (SPV.0085)LB37$178.79$50.00$178.79
36Special 01. microtopography grading (SPV.0180)SY178,950$0.46$0.41$1.31
WisDOT contract 20260512009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy