WisDOT contract 20260811018 bid tabulation

Waupaca - Appleton; Appletree Lane to Old STH 49, Eb (USH 010, Waupaca County Waupaca - Appleton). Let by Wisconsin DOT on August 11, 2026, Waupaca. 3 bids received; low bid $7,595,454 by Chippewa Concrete Services, Inc..

Owner
Wisconsin DOT
Letting
11 AUG 2026
Pay items
168
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Chippewa Concrete Services, Inc.$7,595,454Low
2Vinton Construction Company$7,843,539+3.0%
3Zignego Company, Inc.$8,172,704+8.0%
WisDOT contract 20260811018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Chippewa Concrete Services, Inc.2. Vinton Construction Company3. Zignego Company, Inc.
1Removing small pipe culverts (203.0100)EACH2$511.00$1,022.50$1,000.00
2Removing structure (structure) 01. B-68-104 (203.0220)EACH1$10,322$10,100$10,100
3Removing concrete pavement (204.0100)SY25,375$12.13$8.55$15.00
4Removing asphaltic surface (204.0110)SY16$15.33$30.69$100.00
5Removing asphaltic surface butt joints (204.0115)SY2,850$6.86$5.42$2.85
6Removing asphaltic surface milling (204.0120)SY23,310$4.04$4.31$3.40
7Removing curb & gutter (204.0150)LF114$10.22$10.00$100.00
8Removing guardrail (204.0165)LF1,530$3.58$3.50$3.50
9Removing delineators and markers (204.0180)EACH35$30.30$29.65$29.65
10Removing surface drains (204.0190)EACH1$613.20$500.00$1,000.00
11Removing inlets (204.0220)EACH1$408.80$728.30$1,000.00
12Removing storm sewer (size) 01. 12-inch (204.0245)LF179$8.18$16.03$100.00
13Removing (item description) 01. pipe handrail (204.9090.S)LF16$51.10$10.00$200.00
14Excavation common (205.0100)CY12,040$27.03$31.34$18.00
15Excavation for structures bridges (structure) 01. B-68-104 (206.1001)EACH1$8,891.40$8,700.00$10,000
16Borrow (208.0100)CY440$19.42$0.01$50.00
17Backfill structure type A (210.1500)TON212$53.14$52.00$40.00
18Prepare foundation for asphaltic shoulders (211.0400)STA4,140$0.01$5.00$1.00
19Finishing roadway (project) 01. 1510-02-60 (213.0100)EACH1$7,665.00$5,000.00$1,000.00
20Base aggregate dense 3/4-inch (305.0110)TON10,710$22.38$7.95$35.00
21Base aggregate dense 1 1/4-inch (305.0120)TON8,530$17.23$17.40$24.00
22Concrete pavement 7-inch (415.0070)SY61$140.42$105.00$200.00
23Concrete pavement 12-inch (415.0120)SY40$161.28$120.00$200.00
24Concrete pavement gaps (415.0210)EACH5$2,555.00$0.01$1,000.00
25Concrete pavement approach slab (415.0410)SY514$305.55$240.00$250.00
26Drilled tie bars (416.0610)EACH9,740$11.27$10.00$10.00
27Drilled dowel bars (416.0620)EACH7,640$15.93$17.50$20.00
28Concrete pavement repair (416.1710)SY2,700$121.52$103.42$105.00
29Concrete pavement replacement (416.1720)SY7,042$121.52$106.42$105.00
30Continuous diamond grinding concrete pavement (420.1000)SY14,830$6.29$6.22$6.15
31HMA cold weather paving (450.4000)TON3,650$1.02$1.00$3.40
32Tack coat (455.0605)GAL1,610$4.95$4.84$3.00
33Incentive density HMA pavement (460.2000)DOL8,960$1.00$1.00$1.00
34HMA pavement 4 LT 58-28 S (460.5224)TON14,000$85.05$83.22$83.30
35Asphaltic surface (465.0105)TON8$261.04$255.42$319.50
36Asphaltic surface temporary (465.0125)TON3,230$75.69$74.06$81.10
37Asphaltic rumble strips, shoulder divided roadway (465.0510)LF47,180$0.14$0.14$0.25
38Concrete masonry bridges (502.0100)CY19$2,146.20$2,100.00$2,100.00
39Pigmented surface sealer reseal (502.3205)SY126$16.35$16.00$16.00
40Pigmented surface sealer (502.3210)SY18$16.35$16.00$16.00
41Adhesive anchors no. 5 bar (502.4205)EACH56$37.81$37.00$37.00
42Adhesive anchors no. 8 bar (502.4208)EACH4$55.19$54.00$54.00
43Bar steel reinforcement HS coated structures (505.0600)LB4,480$1.94$1.90$1.90
44Preparation decks type 1 (509.0301)SY6$592.76$580.00$580.00
45Preparation decks type 2 (509.0302)SY3$766.50$750.00$750.00
46Sawing pavement deck preparation areas (509.0310.S)LF60$15.33$15.00$15.00
47Concrete surface repair (509.1500)SF23$306.60$300.00$300.00
48Concrete masonry deck repair (509.2100.S)CY1$7,358.40$7,200.00$7,200.00
49Polymer overlay (509.5100.S)SY565$37.01$36.21$36.21
50Removing polymer overlay (structure) 01. B-68-104 (509.9015.S)SY565$19.05$18.64$18.64
51Rubberized membrane waterproofing (516.0500)SY8$69.50$68.00$68.00
52Culvert pipe temporary 18-inch (520.2018)LF194$56.82$97.29$150.00
53Concrete collars for pipe (520.8000)EACH1$996.45$984.00$1,000.00
54Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH3$511.00$745.67$1,500.00
55Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF120$173.18$197.39$150.00
56Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,844.71$2,304.92$2,000.00
57Culvert pipe corrugated polyethylene 12-inch (530.0112)LF371$104.24$99.39$150.00
58Concrete curb integral type D (601.0150)LF13$96.29$65.00$200.00
59Concrete curb & gutter 30-inch type D (601.0411)LF30$102.16$85.00$200.00
60Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF258$74.24$75.00$60.00
61Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586)LF120$74.24$65.00$60.00
62Concrete sidewalk 5-inch (602.0410)SF382$24.82$15.00$10.00
63Curb ramp detectable warning field yellow (602.0505)SF62$61.86$45.00$100.00
64Curb ramp detectable warning field radial yellow (602.0605)SF25$69.33$70.00$200.00
65Concrete rumble strips, shoulder divided roadway (602.3210)LF47,180$0.82$0.80$0.82
66Concrete barrier temporary precast delivered (603.8000)LF2,550$14.89$16.50$20.00
67Concrete barrier temporary precast installed (603.8125)LF2,550$6.79$7.00$10.00
68Anchoring concrete barrier temporary precast (603.8500)LF260$15.59$19.25$20.00
69Riprap medium (606.0200)CY6$204.40$250.00$300.00
70Inlet covers type HM-GJ (611.0630)EACH1$1,022.00$742.45$1,500.00
71Inlet covers type V (611.0654)EACH4$868.70$1,078.73$1,500.00
72Inlets 2X2-FT (611.3220)EACH5$2,018.45$3,012.20$5,000.00
73Adjusting inlet covers (611.8115)EACH6$613.20$540.00$1,200.00
74Pipe underdrain unperforated 12- inch (612.0212)LF371$104.24$8.82$100.00
75Pipe underdrain wrapped 6-inch (612.0406)LF100$7.15$7.00$100.00
76Barrier system grading shaping finishing (614.0010)EACH5$2,810.50$4,800.00$7,500.00
77Anchor assemblies for steel plate beam guard (614.0150)EACH2$398.58$390.00$390.00
78Guardrail mow strip emulsified asphalt (614.0397)SY647$13.29$13.00$13.00
79MGS guardrail 3 (614.2300)LF1,112.50$27.59$27.00$27.00
80MGS thrie beam transition (614.2500)LF197$96.07$94.00$94.00
81MGS guardrail terminal eat (614.2610)EACH5$3,919.37$3,835.00$3,835.00
82Maintenance and repair of haul roads (project) 01. 1510-02-60 (618.0100)EACH1$1.02$0.01$1.00
83Mobilization (619.1000)EACH1$320,001$788,600$526,000
84Water (624.0100)MGAL175$49.06$40.00$150.00
85Topsoil (625.0100)SY18,977$2.53$0.01$6.00
86Mulching (627.0200)SY6,918$0.46$0.45$0.45
87Silt fence (628.1504)LF1,336$2.25$2.20$2.20
88Silt fence maintenance (628.1520)LF1,336$0.01$0.01$0.01
89Mobilizations erosion control (628.1905)EACH3$511.00$500.00$500.00
90Mobilizations emergency erosion control (628.1910)EACH2$204.40$200.00$200.00
91Erosion mat urban class I type B (628.2008)SY12,059$2.10$2.05$2.05
92Inlet protection type A (628.7005)EACH1$108.33$106.00$106.00
93Culvert pipe checks (628.7555)EACH10$16.35$16.00$16.00
94Rock bags (628.7570)EACH242$13.29$13.00$13.00
95Fertilizer type B (629.0210)CWT7.61$98.11$96.00$96.00
96Seeding mixture no. 20 (630.0120)LB474$6.90$6.75$6.75
97Seeding mixture no. 30 (630.0130)LB259$8.18$8.00$8.00
98Seeding temporary (630.0200)LB189$3.63$3.55$3.55
99Seed water (630.0500)MGAL426.60$1.02$1.00$1.00
100Delineator posts steel (633.0100)EACH88$36.79$36.00$36.00
101Delineator reflectors (633.0500)EACH88$11.24$11.00$11.00
102Delineators temporary (633.1100)EACH67$36.69$35.90$35.90
103Markers culvert end (633.5200)EACH3$72.56$71.00$71.00
104Posts wood 4X6-inch X 14-FT (634.0614)EACH1$97.09$95.00$95.00
105Moving signs type II (638.2102)EACH1$121.62$119.00$119.00
106Field office type C (642.5201)EACH1$12,775$15,000$20,000
107Traffic control drums (643.0300)DAY67,018$0.26$0.25$0.25
108Digital speed reduction system (DSRS) (643.0370.S)DAY317$22.82$22.33$22.33
109Traffic control barricades type III (643.0420)DAY4,922$0.72$0.70$0.70
110Traffic control flexible tubular marker posts (643.0500)EACH312$2.04$2.00$2.00
111Traffic control flexible tubular marker bases (643.0600)EACH312$5.11$5.00$5.00
112Traffic control warning lights type A (643.0705)DAY8,382$0.01$0.01$0.01
113Traffic control warning lights type C (643.0715)DAY12,134$0.01$0.01$0.01
114Traffic control connected arrow boards (643.0810)DAY425$19.45$19.03$19.03
115Traffic control signs (643.0900)DAY33,685$0.26$0.25$0.25
116Traffic control covering signs type II (643.0920)EACH47$30.66$30.00$30.00
117Traffic control signs fixed message (643.1000)SF226$13.29$13.00$13.00
118Basic traffic queue warning system (643.1205.S)DAY292$63.71$62.34$62.34
119Traffic control connected work zone start and end location markers (643.1220)DAY632$4.09$4.00$4.00
120Temporary marking line epoxy 6- inch (643.3170)LF60,335$0.87$0.49$0.49
121Temporary marking line removable tape 6-inch (643.3180)LF10,875$2.04$2.00$2.00
122Traffic control (643.5000)EACH1$133,371$130,500$130,500
123Temporary pedestrian barricade (644.1810)LF24$6.13$6.00$6.00
124Geotextile type DF schedule A (645.0111)SY38$5.11$5.90$10.00
125Geotextile type HR (645.0120)SY12$20.44$10.00$10.00
126Marking line grooved black epoxy 6-inch (646.2025)LF16,308$1.23$0.73$0.73
127Marking line grooved wet ref epoxy 6-inch (646.2040)LF148,130$1.53$1.16$1.16
128Marking line grooved permanent tape 6-inch (646.2050)LF16,308$7.41$7.39$7.39
129Marking line grooved permanent tape 10-inch (646.4050)LF9,588$12.52$13.16$13.16
130Marking arrow epoxy (646.5020)EACH1$357.70$210.69$210.69
131Marking aerial enforcement bar epoxy (646.5420)EACH2$281.05$405.96$405.96
132Cold weather marking epoxy 6-inch (646.6466)LF81,000$0.66$0.49$0.49
133Marking chevron epoxy 24-inch (646.7220)LF588$13.29$28.07$28.07
134Marking removal line 4-inch (646.9000)LF7,650$0.41$0.40$0.40
135Marking removal line grooved contrast permanent tape 4-inch (646.9055)LF16,308$0.18$0.18$0.18
136Construction staking storm sewer (650.4000)EACH6$189.07$50.00$50.00
137Construction staking subgrade (650.4500)LF8,247$0.01$0.01$0.01
138Construction staking base (650.5000)LF8,247$0.87$0.29$0.29
139Construction staking curb gutter and curb & gutter (650.5500)LF408$1.28$1.00$1.00
140Construction staking pipe culverts (650.6000)EACH6$189.07$50.00$50.00
141Construction staking structure layout (structure) 01. B-68-104 (650.6501)EACH1$1.02$200.00$200.00
142Construction staking concrete pavement (650.7000)LF8,906$1.12$2.50$1.04
143Construction staking resurfacing reference (650.8000)LF47,350$0.14$0.15$0.15
144Construction staking curb ramps (650.9000)EACH4$158.41$150.00$150.00
145Construction staking sidewalk (project) 01. 1510-02-60 (650.9500)EACH1$817.60$100.00$100.00
146Construction staking supplemental control (project) 01. 1510-02-60 (650.9911)EACH1$1,226.40$10.00$10.00
147Construction staking slope stakes (650.9920)LF14,025$0.84$0.30$0.30
148Sawing asphalt (690.0150)LF1,968$1.43$1.39$1.39
149Sawing concrete (690.0250)LF30,742$2.25$2.25$2.25
150Incentive flexural strength concrete pavement (715.0715)DOL7,470$1.00$1.00$1.00
151Incentive iri ride (740.0440)DOL3,200$1.00$1.00$1.00
152On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00
153On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,760$5.00$5.00$5.00
154Special 01. asphalt mastic joint sealing (SPV.0030)CWT100$446.77$441.53$437.15
155Special 01. grading shaping and finishing culvert replacements (SPV.0060)EACH3$1,030.18$2,758.00$5,000.00
156Special 02. grading shaping and finishing structure wingwalls (SPV.0060)EACH2$1,490.08$2,758.00$10,000
157Special 03. temporary apron endwalls for culver pipe sloped steel 18-inch 10 to 1 (SPV.0060)EACH1$2,861.60$2,546.20$2,000.00
158Special 04. temporary inlets median 1 grate (SPV.0060)EACH1$3,970.47$5,460.98$10,000
159Special 05. temporary inlet covers type MS (SPV.0060)EACH1$919.80$603.65$1,500.00
160Special 06. cleaning storm sewer structures (SPV.0060)EACH3$3,832.50$866.67$750.00
161Special 07. concrete base handrail (SPV.0060)EACH3$700.49$985.00$1,000.00
162Special 08. mountable curb plate (SPV.0060)EACH1$534.61$685.75$1,000.00
163Special 09. removing raised pavement markers and filling voids (SPV.0060)EACH70$76.65$155.00$50.00
164Special 01. salvage and reinstall high tension cable barrier (SPV.0090)LF775$23.51$23.00$23.00
165Special 02. 42-inch handrail (SPV.0090)LF16$459.90$715.00$500.00
166Special 03. concrete joint and crack cleaning (SPV.0090)LF1,600$4.21$4.12$8.93
167Special 01. HPC pavement 10-inch (SPV.0180)SY24,800$49.05$62.95$59.00
168Special 01. concrete joint and crack repair (HMA) (SPV.0195)TON20$346.34$338.88$500.00
WisDOT contract 20260811018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy