WisDOT contract 20260915004 bid tabulation
City of Monona, Tecumseh Avenue; Lagoon Du Nord Bridge B-13-0906 (LOC STR, Dane County City of Monona, Tecumseh Avenue). Let by Wisconsin DOT on September 15, 2026, Dane. 2 bids received; low bid $2,108,242 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 111
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $2,108,242 | Low |
| 2 | R.G. Huston Company, Inc. | $2,228,700 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. R.G. Huston Company, Inc. |
|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 190 | $52.75 | $30.00 |
| 2 | Grubbing (201.0220) | ID | 190 | $11.61 | $25.00 |
| 3 | Removing structure over waterway debris capture (structure) 01. B-13- 74 (203.0270) | EACH | 1 | $241,700 | $600,300 |
| 4 | Removing concrete pavement (204.0100) | SY | 10 | $300.00 | $43.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 502 | $20.00 | $9.00 |
| 6 | Removing (item description) 01. timber box (204.9060.S) | EACH | 1 | $500.00 | $350.00 |
| 7 | Excavation common (205.0100) | CY | 354 | $200.00 | $19.00 |
| 8 | Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S) | TON | 332 | $120.00 | $85.00 |
| 9 | Excavation for structures bridges (structure) 01. B-13-906 (206.1001) | EACH | 1 | $126,000 | $24,200 |
| 10 | Backfill granular grade 1 (209.1100) | CY | 500 | $80.00 | $74.00 |
| 11 | Backfill structure type A (210.1500) | TON | 420 | $60.00 | $50.00 |
| 12 | Finishing roadway (project) 01. 5994-01-70 (213.0100) | EACH | 1 | $1,000.00 | $3,100.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 415 | $62.00 | $26.00 |
| 14 | Select crushed material (312.0110) | TON | 556 | $62.00 | $24.00 |
| 15 | HMA cold weather paving (450.4000) | TON | 44 | $5.00 | $5.00 |
| 16 | Tack coat (455.0605) | GAL | 40 | $2.00 | $2.00 |
| 17 | Asphaltic surface (465.0105) | TON | 173 | $107.50 | $107.50 |
| 18 | Asphaltic surface driveways and field entrances (465.0120) | TON | 3 | $200.00 | $200.00 |
| 19 | Concrete masonry bridges (502.0100) | CY | 262 | $1,100.00 | $1,828.00 |
| 20 | Protective surface treatment (502.3200) | SY | 170 | $5.30 | $7.50 |
| 21 | Pigmented surface sealer (502.3210) | SY | 82 | $13.00 | $15.50 |
| 22 | Bar steel reinforcement HS structures (505.0400) | LB | 13,520 | $1.16 | $1.65 |
| 23 | Bar steel reinforcement HS coated structures (505.0600) | LB | 31,200 | $1.27 | $1.74 |
| 24 | Bar couplers no. 4 (505.0904) | EACH | 8 | $25.00 | $31.00 |
| 25 | Bar couplers no. 5 (505.0905) | EACH | 111 | $33.00 | $39.00 |
| 26 | Bar couplers no. 6 (505.0906) | EACH | 24 | $34.00 | $43.00 |
| 27 | Bar couplers no. 9 (505.0909) | EACH | 16 | $93.00 | $131.00 |
| 28 | Temporary shoring (structure) 01. B-13-906 (511.1200) | SF | 628 | $39.00 | $34.00 |
| 29 | Railing steel type C5 (513.7026) | LF | 179 | $280.00 | $340.00 |
| 30 | Rubberized membrane waterproofing (516.0500) | SY | 28 | $68.00 | $35.00 |
| 31 | Piling cip concrete 10 3/4 X 0.365- inch (550.2106) | LF | 920 | $21.00 | $117.00 |
| 32 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 370 | $121.00 | $51.21 |
| 33 | Concrete barrier temporary precast delivered (603.8000) | LF | 225 | $30.00 | $26.00 |
| 34 | Concrete barrier temporary precast installed (603.8125) | LF | 400 | $20.00 | $26.00 |
| 35 | Anchoring concrete barrier temporary precast (603.8500) | LF | 125 | $30.00 | $22.00 |
| 36 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 25 | $50.00 | $100.00 |
| 37 | Riprap heavy (606.0300) | CY | 182 | $300.00 | $108.00 |
| 38 | Storm sewer pipe composite 8-inch (608.6008) | LF | 18 | $300.00 | $72.00 |
| 39 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 228 | $35.00 | $4.00 |
| 40 | Maintenance and repair of haul roads (project) 01. 5994-01-70 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 41 | Mobilization (619.1000) | EACH | 1 | $420,000 | $66,662 |
| 42 | Water (624.0100) | MGAL | 20 | $30.00 | $84.00 |
| 43 | Salvaged topsoil (625.0500) | SY | 593 | $15.00 | $5.50 |
| 44 | Silt fence (628.1504) | LF | 529 | $2.05 | $3.00 |
| 45 | Silt fence maintenance (628.1520) | LF | 529 | $0.01 | $0.01 |
| 46 | Mobilizations erosion control (628.1905) | EACH | 5 | $250.00 | $1.00 |
| 47 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $250.00 | $1.00 |
| 48 | Erosion mat urban class I type B (628.2008) | SY | 593 | $1.75 | $3.00 |
| 49 | Turbidity barriers (628.6005) | SY | 305 | $35.00 | $47.50 |
| 50 | Inlet protection type C (628.7015) | EACH | 9 | $65.00 | $70.00 |
| 51 | Culvert pipe checks (628.7555) | EACH | 3 | $18.00 | $25.00 |
| 52 | Fertilizer type B (629.0210) | CWT | 0.70 | $85.00 | $150.00 |
| 53 | Seeding mixture no. 40 (630.0140) | LB | 26.90 | $12.00 | $20.00 |
| 54 | Seeding temporary (630.0200) | LB | 16.30 | $10.00 | $10.00 |
| 55 | Seed water (630.0500) | MGAL | 13.50 | $10.00 | $1.00 |
| 56 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $95.00 | $100.00 |
| 57 | Signs type II reflective F (637.2230) | SF | 12 | $35.00 | $30.00 |
| 58 | Moving signs type II (638.2102) | EACH | 7 | $110.00 | $200.00 |
| 59 | Moving small sign supports (638.4000) | EACH | 6 | $110.00 | $100.00 |
| 60 | Field office type B (642.5001) | EACH | 1 | $20,000 | $1,100.00 |
| 61 | Traffic control drums (643.0300) | DAY | 2,734 | $0.15 | $0.15 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 167 | $0.40 | $0.40 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 333 | $0.10 | $0.10 |
| 64 | Traffic control warning lights type C (643.0715) | DAY | 2,494 | $0.10 | $0.10 |
| 65 | Traffic control signs (643.0900) | DAY | 6,937 | $0.15 | $0.15 |
| 66 | Traffic control signs fixed message (643.1000) | SF | 72 | $14.75 | $14.90 |
| 67 | Temporary marking line removable tape 6-inch (643.3180) | LF | 340 | $2.30 | $2.32 |
| 68 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 24 | $7.30 | $7.37 |
| 69 | Traffic control (643.5000) | EACH | 1 | $23,600 | $23,838 |
| 70 | Geotextile type DF schedule A (645.0111) | SY | 74 | $10.00 | $2.00 |
| 71 | Geotextile type HR (645.0120) | SY | 303 | $10.00 | $5.00 |
| 72 | Geogrid type SR (645.0220) | SY | 1,902 | $1.00 | $2.40 |
| 73 | Marking line epoxy 6-inch (646.2020) | LF | 275 | $0.85 | $8.00 |
| 74 | Marking diagonal epoxy 6-inch (646.7020) | LF | 207 | $20.65 | $15.00 |
| 75 | Construction staking storm sewer (650.4000) | EACH | 2 | $200.00 | $225.00 |
| 76 | Construction staking subgrade (650.4500) | LF | 233 | $0.01 | $0.01 |
| 77 | Construction staking base (650.5000) | LF | 233 | $2.00 | $0.01 |
| 78 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 370 | $1.50 | $2.01 |
| 79 | Construction staking structure layout (structure) 01. B-13-0906 (650.6501) | EACH | 1 | $2,000.00 | $2,000.00 |
| 80 | Construction staking supplemental control (project) 01. 5994-01-70 (650.9911) | EACH | 1 | $3,000.00 | $800.00 |
| 81 | Construction staking slope stakes (650.9920) | LF | 185 | $2.00 | $0.01 |
| 82 | Temporary traffic signals for bridges (structure) 01. B-13-0906 (661.0101) | EACH | 1 | $12,250 | $12,374 |
| 83 | Sawing asphalt (690.0150) | LF | 71 | $2.00 | $2.00 |
| 84 | Sawing concrete (690.0250) | LF | 10 | $2.75 | $2.75 |
| 85 | Incentive strength concrete structures (715.0502) | DOL | 1,572 | $1.00 | $1.00 |
| 86 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 87 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 88 | Special 01. driveway assistance device system (SPV.0045) | DAY | 333 | $16.00 | $16.16 |
| 89 | Special 01. temporary support B- 13-74 (SPV.0060) | EACH | 1 | $14,900 | $94,100 |
| 90 | Special 02. salvage and stockpile signs (SPV.0060) | EACH | 4 | $130.00 | $60.00 |
| 91 | Special 03. salvage and stockpile masonry block wall (SPV.0060) | EACH | 1 | $3,500.00 | $900.00 |
| 92 | Special 04. valve 8-inch (SPV.0060) | EACH | 1 | $3,500.00 | $4,100.00 |
| 93 | Special 05. water valve manhole 60-inch complete (SPV.0060) | EACH | 1 | $22,500 | $21,900 |
| 94 | Special 06. watermain bend 8-inch (SPV.0060) | EACH | 8 | $1,000.00 | $1,000.00 |
| 95 | Special 07. connect to existing watermain (SPV.0060) | EACH | 2 | $5,000.00 | $4,200.00 |
| 96 | Special 08. remove existing watermain (SPV.0060) | EACH | 1 | $1,000.00 | $23,000 |
| 97 | Special 09. remove existing water valve manhole (SPV.0060) | EACH | 1 | $1,000.00 | $1,100.00 |
| 98 | Special 10. reconnect existing water service (SPV.0060) | EACH | 1 | $1,000.00 | $900.00 |
| 99 | Special 11. corporation 1-inch (SPV.0060) | EACH | 1 | $500.00 | $900.00 |
| 100 | Special 12. curb stop and box 1- inch (SPV.0060) | EACH | 1 | $500.00 | $1,400.00 |
| 101 | Special 13. temporary shoring - watermain (SPV.0060) | EACH | 1 | $1.00 | $79,700 |
| 102 | Special 14. temporary water service (SPV.0060) | EACH | 1 | $30,000 | $13,700 |
| 103 | Special 15. watermain flushing and pressure testing (SPV.0060) | EACH | 1 | $2,000.00 | $3,900.00 |
| 104 | Special 16. adjusting sanitary manhole covers (SPV.0060) | EACH | 1 | $1,000.00 | $900.00 |
| 105 | Special 17. reconstructing sanitary manhole covers (SPV.0060) | EACH | 1 | $3,000.00 | $1,500.00 |
| 106 | Special 01. removing existing steel piling (SPV.0090) | LF | 160 | $47.00 | $257.00 |
| 107 | Special 02. watermain ductile iron 8-inch (restrained) (SPV.0090) | LF | 75 | $659.48 | $197.00 |
| 108 | Special 03. watermain ductile iron 8-inch (SPV.0090) | LF | 160 | $595.03 | $320.00 |
| 109 | Special 04. casing pipe 24-inch (SPV.0090) | LF | 64 | $1,093.75 | $1,378.00 |
| 110 | Special 05. water service copper 1- inch (SPV.0090) | LF | 25 | $350.00 | $115.00 |
| 111 | Special 01. rigid insulation 2-inch (SPV.0165) | SF | 96 | $40.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.