WisDOT contract 20260915009 bid tabulation
3180-03-74. Let by Wisconsin DOT on September 15, 2026, Walworth. 3 bids received; low bid $2,973,368 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 126
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $2,973,368 | Low |
| 2 | Rock Road Companies, Inc. | $3,193,809 | +7.0% |
| 3 | Stark Pavement Corporation | $3,233,333 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation |
|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $3,939.39 | $0.01 | $3,900.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 4 | $252.53 | $1,286.75 | $1,869.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-64- 007 (203.0260) | EACH | 1 | $10,000 | $50,000 | $50,000 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 70 | $0.01 | $56.30 | $16.15 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 65,087 | $2.65 | $2.50 | $2.65 |
| 6 | Removing curb & gutter (204.0150) | LF | 123 | $12.00 | $12.00 | $12.00 |
| 7 | Removing guardrail (204.0165) | LF | 684 | $3.00 | $3.00 | $3.00 |
| 8 | Removing fence (204.0170) | LF | 150 | $1.00 | $1.00 | $1.00 |
| 9 | Excavation common (205.0100) | CY | 810 | $21.00 | $12.84 | $19.00 |
| 10 | Excavation for structures bridges (structure) 01. B-64-211 (206.1001) | EACH | 1 | $10,000 | $20,000 | $20,000 |
| 11 | Borrow (208.0100) | CY | 1,099 | $14.00 | $0.01 | $14.00 |
| 12 | Backfill structure type A (210.1500) | TON | 220 | $20.00 | $20.00 | $20.00 |
| 13 | Finishing roadway (project) 01. 3180-05-71 (213.0100) | EACH | 1 | $1,660.00 | $2,845.67 | $2,650.00 |
| 14 | Finishing roadway (project) 02. 3180-03-74 (213.0100) | EACH | 1 | $2,300.00 | $2,845.67 | $1,800.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,286 | $65.00 | $29.92 | $28.80 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,743 | $23.00 | $17.02 | $23.00 |
| 17 | Concrete pavement 8-inch (415.0080) | SY | 49 | $160.00 | $160.00 | $250.00 |
| 18 | Concrete pavement approach slab (415.0410) | SY | 80 | $300.00 | $300.00 | $315.00 |
| 19 | Tack coat (455.0605) | GAL | 10,153 | $2.10 | $3.50 | $1.60 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 11,782 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 11,167 | $71.35 | $83.87 | $75.10 |
| 22 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 7,297 | $84.65 | $90.87 | $87.20 |
| 23 | Asphaltic surface temporary (465.0125) | TON | 4 | $133.95 | $110.00 | $280.00 |
| 24 | Asphaltic rumble strips, centerline (465.0560) | LF | 17,940 | $0.60 | $0.20 | $0.27 |
| 25 | Concrete masonry bridges (502.0100) | CY | 303 | $950.00 | $950.00 | $950.00 |
| 26 | Protective surface treatment (502.3200) | SY | 383 | $7.00 | $7.00 | $7.00 |
| 27 | Pigmented surface sealer (502.3210) | SY | 80 | $8.00 | $8.00 | $8.00 |
| 28 | Prestressed girder type I 28-inch (503.0128) | LF | 156 | $417.00 | $417.00 | $417.00 |
| 29 | Bar steel reinforcement HS structures (505.0400) | LB | 5,070 | $1.40 | $1.40 | $1.40 |
| 30 | Bar steel reinforcement HS coated structures (505.0600) | LB | 29,040 | $1.60 | $1.60 | $1.60 |
| 31 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,430 | $3.25 | $3.25 | $3.25 |
| 32 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 8 | $150.00 | $150.00 | $150.00 |
| 33 | Steel diaphragms (structure) 01. B- 64-211 (506.4000) | EACH | 3 | $2,500.00 | $2,500.00 | $2,500.00 |
| 34 | Rubberized membrane waterproofing (516.0500) | SY | 24 | $44.00 | $44.00 | $44.00 |
| 35 | Cleaning culvert pipes (520.8700) | EACH | 1 | $4,545.45 | $700.00 | $700.00 |
| 36 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $222.22 | $647.06 | $535.00 |
| 37 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 70 | $248.48 | $215.73 | $172.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,373.74 | $1,586.33 | $2,367.00 |
| 39 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 308 | $257.58 | $175.30 | $180.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 8 | $2,146.47 | $1,541.17 | $1,729.00 |
| 41 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 44 | $80.81 | $98.50 | $87.00 |
| 42 | Pile points (550.0500) | EACH | 14 | $250.00 | $250.00 | $250.00 |
| 43 | Piling cip concrete 10 3/4 X 0.50- inch (550.2108) | LF | 945 | $100.00 | $100.00 | $100.00 |
| 44 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 123 | $75.00 | $75.00 | $95.00 |
| 45 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 74 | $75.00 | $75.00 | $95.00 |
| 46 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 30 | $75.00 | $75.00 | $95.00 |
| 47 | Riprap light (606.0100) | CY | 32 | $85.86 | $126.37 | $243.00 |
| 48 | Riprap heavy (606.0300) | CY | 215 | $142.00 | $107.89 | $142.00 |
| 49 | Inlet covers type VV-B (611.0656) | EACH | 2 | $4,292.93 | $3,469.52 | $3,256.00 |
| 50 | Inlets 2X3.5-FT (611.3260) | EACH | 2 | $2,994.95 | $4,988.16 | $3,405.00 |
| 51 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 200 | $8.00 | $8.00 | $8.00 |
| 52 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $275.00 | $275.00 | $275.00 |
| 53 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 171 | $35.00 | $35.00 | $35.00 |
| 54 | MGS guardrail 3 (614.2300) | LF | 75 | $27.75 | $27.75 | $27.75 |
| 55 | MGS thrie beam transition (614.2500) | LF | 160 | $95.00 | $95.00 | $95.00 |
| 56 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,450.00 | $3,450.00 | $3,450.00 |
| 57 | Maintenance and repair of haul roads (project) 01. 3180-05-71 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 |
| 58 | Maintenance and repair of haul roads (project) 02. 3180-03-74 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 |
| 59 | Mobilization (619.1000) | EACH | 1 | $50,000 | $182,579 | $272,718 |
| 60 | Water (624.0100) | MGAL | 711 | $0.01 | $0.01 | $0.05 |
| 61 | Topsoil (625.0100) | SY | 80 | $45.00 | $0.01 | $45.00 |
| 62 | Salvaged topsoil (625.0500) | SY | 3,538 | $4.00 | $0.01 | $4.00 |
| 63 | Mulching (627.0200) | SY | 214 | $1.00 | $1.00 | $1.00 |
| 64 | Silt fence (628.1504) | LF | 1,462 | $1.90 | $1.90 | $1.90 |
| 65 | Silt fence maintenance (628.1520) | LF | 1,462 | $0.01 | $0.01 | $0.01 |
| 66 | Mobilizations erosion control (628.1905) | EACH | 9 | $1.00 | $1.00 | $1.00 |
| 67 | Mobilizations emergency erosion control (628.1910) | EACH | 9 | $1.00 | $1.00 | $1.00 |
| 68 | Erosion mat class I type A (628.2002) | SY | 1,200 | $0.95 | $0.95 | $0.95 |
| 69 | Erosion mat class I type B (628.2004) | SY | 360 | $0.95 | $0.95 | $0.95 |
| 70 | Erosion mat urban class I type B (628.2008) | SY | 795 | $1.95 | $1.95 | $1.95 |
| 71 | Soil stabilizer type A (628.6505) | ACRE | 0.50 | $3,951.61 | $4,000.00 | $4,000.00 |
| 72 | Culvert pipe checks (628.7555) | EACH | 12 | $25.00 | $25.00 | $25.00 |
| 73 | Rock bags (628.7570) | EACH | 70 | $25.00 | $25.00 | $25.00 |
| 74 | Fertilizer type B (629.0210) | CWT | 2.29 | $60.00 | $60.00 | $60.00 |
| 75 | Seeding mixture no. 30 (630.0130) | LB | 240 | $7.50 | $7.50 | $7.50 |
| 76 | Seeding temporary (630.0200) | LB | 125 | $3.00 | $3.00 | $3.00 |
| 77 | Seed water (630.0500) | MGAL | 284 | $1.00 | $1.00 | $1.00 |
| 78 | Markers culvert end (633.5200) | EACH | 6 | $58.00 | $58.00 | $58.00 |
| 79 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 80 | $78.00 | $78.00 | $78.00 |
| 80 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 4 | $130.00 | $130.00 | $130.00 |
| 81 | Signs type II reflective H (637.2210) | SF | 482 | $24.00 | $24.00 | $24.00 |
| 82 | Signs type II reflective F (637.2230) | SF | 161 | $24.50 | $24.50 | $24.50 |
| 83 | Moving signs type II (638.2102) | EACH | 5 | $75.00 | $75.00 | $75.00 |
| 84 | Removing signs type II (638.2602) | EACH | 77 | $25.00 | $25.00 | $25.00 |
| 85 | Removing small sign supports (638.3000) | EACH | 80 | $30.00 | $30.00 | $30.00 |
| 86 | Field office type C (642.5201) | EACH | 1 | $10,000 | $9,450.00 | $12,500 |
| 87 | Traffic control drums (643.0300) | DAY | 2,880 | $0.20 | $0.20 | $0.25 |
| 88 | Traffic control barricades type III (643.0420) | DAY | 1,798 | $0.51 | $0.50 | $0.55 |
| 89 | Traffic control warning lights type A (643.0705) | DAY | 2,108 | $0.12 | $0.12 | $0.10 |
| 90 | Traffic control warning lights type C (643.0715) | DAY | 2,880 | $0.12 | $0.12 | $0.10 |
| 91 | Traffic control signs (643.0900) | DAY | 15,462 | $0.15 | $0.15 | $0.35 |
| 92 | Traffic control covering signs type I (643.0910) | EACH | 1 | $353.54 | $350.00 | $350.00 |
| 93 | Traffic control covering signs type II (643.0920) | EACH | 9 | $111.11 | $110.00 | $65.00 |
| 94 | Traffic control signs fixed message (643.1000) | SF | 85 | $14.90 | $14.75 | $15.00 |
| 95 | Traffic control signs PCMS (643.1050) | DAY | 144 | $30.30 | $30.00 | $25.00 |
| 96 | Temporary marking raised pavement marker type II (643.3770) | EACH | 820 | $5.56 | $5.50 | $7.00 |
| 97 | Traffic control (643.5000) | EACH | 1 | $24,495 | $24,250 | $22,386 |
| 98 | Geotextile type DF schedule A (645.0111) | SY | 74 | $8.00 | $8.00 | $8.00 |
| 99 | Geotextile type HR (645.0120) | SY | 360 | $5.00 | $2.32 | $5.00 |
| 100 | Marking line epoxy 4-inch (646.1020) | LF | 342 | $3.03 | $3.00 | $0.60 |
| 101 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 65,404 | $1.17 | $1.16 | $1.20 |
| 102 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,254 | $2.73 | $2.70 | $2.30 |
| 103 | Marking stop line epoxy 18-inch (646.6120) | LF | 185 | $17.17 | $17.00 | $20.00 |
| 104 | Marking diagonal epoxy 12-inch (646.7120) | LF | 124 | $16.92 | $16.75 | $11.00 |
| 105 | Marking curb epoxy (646.8120) | LF | 100 | $10.10 | $10.00 | $10.00 |
| 106 | Marking island nose epoxy (646.8220) | EACH | 2 | $318.18 | $315.00 | $345.00 |
| 107 | Construction staking storm sewer (650.4000) | EACH | 4 | $120.00 | $25.00 | $120.00 |
| 108 | Construction staking subgrade (650.4500) | LF | 640 | $0.01 | $0.01 | $0.01 |
| 109 | Construction staking base (650.5000) | LF | 610 | $1.50 | $0.01 | $1.50 |
| 110 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 104 | $5.00 | $1.00 | $5.00 |
| 111 | Construction staking pipe culverts (650.6000) | EACH | 5 | $130.00 | $25.00 | $130.00 |
| 112 | Construction staking structure layout (structure) 01. 3180-03-74 (650.6501) | EACH | 1 | $3,500.00 | $2,000.00 | $3,500.00 |
| 113 | Construction staking concrete pavement (650.7000) | LF | 30 | $10.00 | $0.01 | $10.00 |
| 114 | Construction staking resurfacing reference (650.8000) | LF | 17,933 | $0.17 | $0.09 | $0.17 |
| 115 | Construction staking supplemental control (project) 01. 3180-05-71 (650.9911) | EACH | 1 | $1,500.00 | $2,000.00 | $1,500.00 |
| 116 | Construction staking supplemental control (project) 02. 3180-03-74 (650.9911) | EACH | 1 | $1,000.00 | $2,000.00 | $1,000.00 |
| 117 | Construction staking slope stakes (650.9920) | LF | 640 | $0.75 | $0.01 | $0.75 |
| 118 | Sawing asphalt (690.0150) | LF | 80 | $1.20 | $1.20 | $2.00 |
| 119 | Incentive strength concrete structures (715.0502) | DOL | 1,818 | $1.00 | $1.00 | $1.00 |
| 120 | Incentive strength concrete barrier (715.0603) | DOL | 30 | $1.00 | $1.00 | $1.00 |
| 121 | Incentive iri ride (740.0440) | DOL | 12,800 | $1.00 | $1.00 | $1.00 |
| 122 | Special 01. section corner monuments (SPV.0060) | EACH | 8 | $0.01 | $400.00 | $450.00 |
| 123 | Special 01. bar GFRP reinforcement structures (SPV.0090) | LF | 11,918 | $1.75 | $1.75 | $1.75 |
| 124 | Special 01. enhanced turbidity barrier (SPV.0180) | SY | 147 | $54.50 | $54.50 | $54.50 |
| 125 | Special 01. asphalt repair (SPV.0195) | TON | 140 | $250.00 | $212.00 | $187.00 |
| 126 | Special 02. base aggregate dense 1-1/4 inch material for travel corridor (SPV.0195) | TON | 30 | $20.00 | $20.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.