WisDOT contract 20260915010 bid tabulation
Richmond - Whitewater; CTH a to STH 11 (STH 089, Walworth County Richmond - Whitewater). Let by Wisconsin DOT on September 15, 2026, Walworth. 2 bids received; low bid $2,540,648 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 82
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $2,540,648 | Low |
| 2 | Payne and Dolan, Inc | $2,563,493 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Payne and Dolan, Inc |
|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 4 | $402.30 | $730.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 427 | $11.70 | $0.01 |
| 3 | Removing asphaltic surface milling (204.0125) | TON | 18,673 | $5.00 | $0.01 |
| 4 | Removing guardrail (204.0165) | LF | 2,198 | $1.75 | $1.75 |
| 5 | Removing (item description) 01. partial traffic signal removal (STH 11/14 & STH 89) (204.9060.S) | EACH | 4 | $357.50 | $353.00 |
| 6 | Finishing roadway (project) 01. 3390-08-70 (213.0100) | EACH | 1 | $5,316.77 | $2,500.00 |
| 7 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,150 | $23.26 | $8.90 |
| 8 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 154 | $21.35 | $28.00 |
| 9 | Shaping shoulders (305.0500) | STA | 476 | $7.58 | $11.15 |
| 10 | Tack coat (455.0605) | GAL | 12,660 | $3.44 | $3.20 |
| 11 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,500.00 | $0.01 |
| 12 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 12,664 | $67.57 | $63.05 |
| 13 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 9,875 | $71.57 | $81.00 |
| 14 | Asphaltic surface driveways and field entrances (465.0120) | TON | 194 | $171.15 | $171.00 |
| 15 | Asphaltic surface temporary (465.0125) | TON | 50 | $72.73 | $95.00 |
| 16 | Asphaltic rumble strips, centerline (465.0560) | LF | 22,825 | $0.20 | $0.29 |
| 17 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 72 | $246.93 | $289.00 |
| 18 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 144 | $121.02 | $179.00 |
| 19 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 120 | $372.88 | $469.00 |
| 20 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 216 | $247.69 | $275.00 |
| 21 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 6 | $1,998.90 | $1,620.00 |
| 22 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $2,751.71 | $2,640.00 |
| 23 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 6 | $3,197.23 | $3,060.00 |
| 24 | Riprap medium (606.0200) | CY | 20 | $127.41 | $272.00 |
| 25 | Barrier system grading shaping finishing (614.0010) | EACH | 8 | $3,565.71 | $4,740.00 |
| 26 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 787 | $18.00 | $16.77 |
| 27 | MGS guardrail 3 (614.2300) | LF | 1,600 | $27.25 | $27.25 |
| 28 | MGS guardrail terminal eat (614.2610) | EACH | 8 | $3,200.00 | $3,200.00 |
| 29 | Maintenance and repair of haul roads (project) 01. 3390-08-70 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 30 | Mobilization (619.1000) | EACH | 1 | $96,547 | $167,000 |
| 31 | Topsoil (625.0100) | SY | 250 | $0.01 | $20.00 |
| 32 | Salvaged topsoil (625.0500) | SY | 989 | $0.01 | $5.50 |
| 33 | Silt fence (628.1504) | LF | 3,935 | $1.90 | $1.90 |
| 34 | Silt fence maintenance (628.1520) | LF | 3,935 | $0.01 | $0.01 |
| 35 | Mobilizations erosion control (628.1905) | EACH | 1 | $400.00 | $400.00 |
| 36 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $400.00 | $400.00 |
| 37 | Erosion mat class I type B (628.2004) | SY | 989 | $1.00 | $1.00 |
| 38 | Culvert pipe checks (628.7555) | EACH | 44 | $20.00 | $20.00 |
| 39 | Fertilizer type B (629.0210) | CWT | 2 | $100.00 | $100.00 |
| 40 | Seeding mixture no. 75 (630.0175) | LB | 20 | $55.00 | $55.00 |
| 41 | Seed water (630.0500) | MGAL | 100 | $1.00 | $1.00 |
| 42 | Markers culvert end (633.5200) | EACH | 8 | $60.00 | $60.00 |
| 43 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 118 | $75.00 | $75.00 |
| 44 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 5 | $130.00 | $130.00 |
| 45 | Sign flags permanent type II (637.0620) | EACH | 4 | $450.00 | $450.00 |
| 46 | Signs type II reflective H (637.2210) | SF | 691.41 | $22.75 | $22.75 |
| 47 | Signs type II reflective F (637.2230) | SF | 279.10 | $23.50 | $23.50 |
| 48 | Moving signs type II (638.2102) | EACH | 7 | $100.00 | $100.00 |
| 49 | Removing signs type II (638.2602) | EACH | 115 | $20.00 | $20.00 |
| 50 | Removing small sign supports (638.3000) | EACH | 121 | $30.00 | $30.00 |
| 51 | Traffic control drums (643.0300) | DAY | 5,000 | $0.20 | $0.20 |
| 52 | Traffic control barricades type III (643.0420) | DAY | 4,006 | $0.60 | $0.61 |
| 53 | Traffic control warning lights type A (643.0705) | DAY | 7,052 | $0.10 | $0.10 |
| 54 | Traffic control warning lights type C (643.0715) | DAY | 5,000 | $0.10 | $0.10 |
| 55 | Traffic control signs (643.0900) | DAY | 20,196 | $0.40 | $0.40 |
| 56 | Traffic control covering signs type II (643.0920) | EACH | 5 | $45.00 | $45.45 |
| 57 | Traffic control signs PCMS (643.1050) | DAY | 14 | $75.00 | $75.76 |
| 58 | Traffic control (643.5000) | EACH | 1 | $13,750 | $13,889 |
| 59 | Geotextile type HR (645.0120) | SY | 15 | $2.73 | $9.80 |
| 60 | Marking line epoxy 4-inch (646.1020) | LF | 620 | $0.65 | $0.65 |
| 61 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 563 | $1.00 | $1.00 |
| 62 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 79,141 | $1.17 | $1.17 |
| 63 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 84 | $2.75 | $2.75 |
| 64 | Marking stop line epoxy 18-inch (646.6120) | LF | 289 | $17.32 | $17.32 |
| 65 | Locating no-passing zones (648.0100) | MI | 4 | $555.93 | $555.93 |
| 66 | Construction staking pipe culverts (650.6000) | EACH | 8 | $150.00 | $160.00 |
| 67 | Construction staking resurfacing reference (650.8000) | LF | 24,502 | $0.15 | $0.15 |
| 68 | Construction staking supplemental control (project) 01. 3390-08-70 (650.9911) | EACH | 1 | $3,000.00 | $2,500.00 |
| 69 | Construction staking slope stakes (650.9920) | LF | 3,100 | $0.15 | $0.75 |
| 70 | Removing pull boxes (653.0905) | EACH | 6 | $200.00 | $386.00 |
| 71 | Public land survey monument verify and reset (680.0100) | EACH | 8 | $200.00 | $0.01 |
| 72 | Sawing asphalt (690.0150) | LF | 240 | $1.60 | $1.60 |
| 73 | Incentive iri ride (740.0440) | DOL | 18,564 | $1.00 | $1.00 |
| 74 | Special .01 HMA pavement PWL QMP, core only project; incentive density PWL HMA pavement (SPV.0055) | DOL | 14,430 | $1.00 | $1.00 |
| 75 | Special .02 HMA pavement PWL QMP, core only project; incentive air voids HMA pavement (SPV.0055) | DOL | 31,539 | $1.00 | $1.00 |
| 76 | Special .03 HMA pavement longitudinal joint density, core only project; incentive densit (SPV.0055) | DOL | 4,910 | $1.00 | $1.00 |
| 77 | Special .01 stop sign traffic flashing beacon system, solar STH 89 SB at STH 11 (SPV.0060) | EACH | 1 | $4,482.00 | $5,432.00 |
| 78 | Special .02 stop sign traffic flashing beacon system, solar ush 14 NB at STH 89 (SPV.0060) | EACH | 1 | $4,482.00 | $5,432.00 |
| 79 | Special .03 stop sign traffic flashing beacon system, solar STH 11 WB at STH 89 (SPV.0060) | EACH | 1 | $4,482.00 | $5,432.00 |
| 80 | Special .04 stop sign traffic flashing beacon system, solar STH 11 EB at STH 89 (SPV.0060) | EACH | 1 | $4,482.00 | $5,432.00 |
| 81 | Special .05 field office type T (SPV.0060) | EACH | 1 | $6,000.00 | $9,500.00 |
| 82 | Special .01 asphaltic repair (SPV.0195) | TON | 167 | $134.83 | $195.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.