WisDOT contract 20260915011 bid tabulation

Fy27 Ser Tree Clearing Project; Various Ser Counties (VAR HWY, Southeast Region Wide SER Tree Clearing). Let by Wisconsin DOT on September 15, 2026, Southeast Region Wide. 3 bids received; low bid $199,177 by Interstate Tree Landscaping.

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
22
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Interstate Tree Landscaping$199,177Low
2Homer Tree Service, Inc.$309,217+55%
3Highway Landscapers, Inc.$331,943+67%
WisDOT contract 20260915011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Interstate Tree Landscaping2. Homer Tree Service, Inc.3. Highway Landscapers, Inc.
1Clearing (201.0105)STA131$1,095.00$1,550.00$1,700.00
2Clearing (201.0120)ID68$35.00$28.00$200.00
3Removing fence (204.0170)LF170$7.50$5.00$15.00
4Finishing roadway (project) 01. 3742-03-71 (213.0100)EACH1$1.00$1,200.00$1.00
5Fence temporary (616.0600.S)LF150$3.50$6.00$10.00
6Maintenance and repair of haul roads (project) 01. 3742-03-71 (618.0100)EACH1$1.00$500.00$1.00
7Silt fence (628.1504)LF100$3.00$3.00$3.00
8Silt fence maintenance (628.1520)LF100$1.00$0.50$0.01
9Mobilizations erosion control (628.1905)EACH5$350.00$450.00$1.00
10Mobilizations emergency erosion control (628.1910)EACH5$350.00$550.00$1.00
11Culvert pipe checks (628.7555)EACH4$125.00$50.00$20.00
12Rock bags (628.7570)EACH5$20.00$18.00$20.00
13Traffic control signs PCMS (643.1050)DAY100$45.00$44.00$1.00
14Special 01. traffic control - lane closure (SPV.0045)DAY5$950.00$1,165.00$500.00
15Special 02. traffic control - shoulder closure (SPV.0045)DAY7$400.00$854.00$500.00
16Special 03. traffic control - ramp closure (SPV.0045)DAY2$950.00$330.00$500.00
17Special 04. traffic control - pedestrian accommodation (SPV.0045)DAY2$550.00$330.00$250.00
18Special 01. frozen ground erosion control (SPV.0060)EACH1$250.00$4,500.00$250.00
19Special 02. semi-frozen ground erosion control (SPV.0060)EACH1$250.00$4,500.00$250.00
20Special 03. thawed ground erosion control (SPV.0060)EACH1$1,500.00$4,000.00$250.00
21Special 04. site mobilization (SPV.0060)EACH5$5,500.00$12,150$16,500
22Special 05. semi-permanent restoration (SPV.0060)EACH1$2,500.00$3,900.00$250.00
WisDOT contract 20260915011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy