WisDOT contract 20260915012 bid tabulation
Random Lake-Waldo; Scl-STH 28 (STH 057, Sheboygan County Random Lake - Waldo). Let by Wisconsin DOT on September 15, 2026, Sheboygan. 3 bids received; low bid $8,643,859 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 96
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $8,643,859 | Low |
| 2 | Stark Pavement Corporation | $9,078,469 | +5.0% |
| 3 | Rock Road Companies, Inc. | $9,370,218 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Stark Pavement Corporation | 3. Rock Road Companies, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 3 | $1,500.00 | $1,684.95 | $1,500.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 400 | $6.00 | $2.50 | $6.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 180 | $5.00 | $10.00 | $5.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 2,010 | $2.90 | $8.55 | $5.31 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 328,790 | $0.85 | $1.60 | $1.20 |
| 6 | Removing curb (204.0130) | LF | 24 | $50.00 | $15.00 | $50.00 |
| 7 | Removing guardrail (204.0165) | LF | 2,224 | $1.75 | $1.75 | $1.65 |
| 8 | Excavation common (205.0100) | CY | 536 | $26.19 | $31.21 | $26.19 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 4015-22-71 (211.0101) | EACH | 1 | $10,950 | $34,468 | $0.01 |
| 10 | Finishing roadway (project) 01. 4015-22-71 (213.0100) | EACH | 1 | $3,675.00 | $4,800.00 | $3,664.83 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 15,800 | $26.10 | $25.70 | $26.10 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 600 | $21.32 | $22.37 | $21.32 |
| 13 | Base patching concrete hes (390.0305) | CY | 400 | $125.00 | $350.00 | $125.00 |
| 14 | Drilled tie bars (416.0610) | EACH | 105 | $8.00 | $10.50 | $8.00 |
| 15 | Drilled dowel bars (416.0620) | EACH | 354 | $17.00 | $19.50 | $17.00 |
| 16 | Concrete pavement repair (416.1710) | SY | 50 | $109.00 | $108.60 | $109.00 |
| 17 | Concrete pavement replacement (416.1720) | SY | 430 | $109.00 | $112.46 | $109.00 |
| 18 | HMA cold weather paving (450.4000) | TON | 10,000 | $2.00 | $0.01 | $0.01 |
| 19 | Tack coat (455.0605) | GAL | 38,860 | $3.00 | $2.90 | $3.51 |
| 20 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,250.00 | $2,863.00 | $3,500.00 |
| 21 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 4 | $3,275.00 | $3,555.00 | $3,500.00 |
| 22 | Incentive density PWL HMA pavement (460.2005) | DOL | 54,687 | $1.00 | $1.00 | $1.00 |
| 23 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 30,746 | $1.00 | $1.00 | $1.00 |
| 24 | Incentive air voids HMA pavement (460.2010) | DOL | 85,605 | $1.00 | $1.00 | $1.00 |
| 25 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 35,221 | $64.30 | $66.80 | $72.82 |
| 26 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 50,389 | $73.10 | $69.55 | $81.79 |
| 27 | Asphaltic surface (465.0105) | TON | 9 | $525.00 | $437.00 | $353.75 |
| 28 | Asphaltic surface safety islands (465.0305) | TON | 2 | $625.00 | $337.00 | $359.79 |
| 29 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 118,850 | $0.19 | $0.12 | $0.13 |
| 30 | Culvert pipe liners (size) 01. 18- inch (520.9700.S) | LF | 106 | $150.00 | $328.95 | $189.00 |
| 31 | Culvert pipe liners (size) 02. 30- inch (520.9700.S) | LF | 80 | $290.00 | $425.55 | $287.00 |
| 32 | Culvert pipe liners (size) 03. 42- inch (520.9700.S) | LF | 82 | $400.00 | $556.65 | $448.00 |
| 33 | Cleaning culvert pipes for liner verification (520.9750.S) | EACH | 3 | $2,000.00 | $3,720.00 | $1,340.00 |
| 34 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $1,250.00 | $1,219.30 | $1,250.00 |
| 35 | Apron endwalls for culvert pipe steel 42-inch (521.1042) | EACH | 1 | $2,750.00 | $2,742.28 | $2,750.00 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $2,000.00 | $2,404.53 | $2,000.00 |
| 37 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $2,950.00 | $3,173.75 | $2,950.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $3,750.00 | $4,414.59 | $3,750.00 |
| 39 | Concrete curb type J (601.0120) | LF | 24 | $99.00 | $95.00 | $99.00 |
| 40 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 86 | $305.00 | $312.22 | $305.00 |
| 41 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 92 | $165.00 | $155.23 | $165.00 |
| 42 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 90 | $355.00 | $261.83 | $355.00 |
| 43 | Reconstructing inlets (611.0430) | EACH | 2 | $1,000.00 | $1,362.50 | $1,000.00 |
| 44 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $5,139.61 | $8,700.00 | $5,429.61 |
| 45 | MGS guardrail 3 (614.2300) | LF | 1,855 | $27.00 | $27.00 | $27.80 |
| 46 | MGS guardrail 3 K (614.2330) | LF | 100 | $38.00 | $38.00 | $45.00 |
| 47 | MGS guardrail 3 L (614.2340) | LF | 73 | $30.00 | $30.00 | $55.00 |
| 48 | MGS guardrail short radius (614.2350) | LF | 25 | $38.00 | $38.00 | $55.00 |
| 49 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,400.00 | $3,400.00 | $3,690.00 |
| 50 | MGS guardrail terminal type 2 (614.2620) | EACH | 5 | $2,500.00 | $2,500.00 | $2,660.00 |
| 51 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,300.00 | $2,300.00 | $1,985.00 |
| 52 | Maintenance and repair of haul roads (project) 01. 4015-22-71 (618.0100) | EACH | 1 | $1.00 | $1.00 | $0.01 |
| 53 | Mobilization (619.1000) | EACH | 1 | $358,500 | $495,200 | $258,601 |
| 54 | Water (624.0100) | MGAL | 235 | $10.00 | $75.00 | $10.00 |
| 55 | Silt fence (628.1504) | LF | 830 | $1.90 | $1.90 | $2.60 |
| 56 | Silt fence maintenance (628.1520) | LF | 1,660 | $0.01 | $0.01 | $0.10 |
| 57 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $100.00 | $99.00 |
| 58 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $200.00 | $200.00 | $99.00 |
| 59 | Inlet protection type A (628.7005) | EACH | 4 | $118.00 | $118.00 | $80.00 |
| 60 | Temporary ditch checks (628.7504) | LF | 70 | $8.50 | $8.50 | $9.00 |
| 61 | Seed water (630.0500) | MGAL | 29 | $1.00 | $1.00 | $10.00 |
| 62 | Markers culvert end (633.5200) | EACH | 5 | $65.00 | $65.00 | $76.00 |
| 63 | Moving signs type II (638.2102) | EACH | 1 | $150.00 | $150.00 | $300.00 |
| 64 | Moving small sign supports (638.4000) | EACH | 1 | $1.00 | $1.00 | $300.00 |
| 65 | Field office type D (642.5401) | EACH | 1 | $15,000 | $16,500 | $7,500.00 |
| 66 | Traffic control drums (643.0300) | DAY | 68,992 | $0.11 | $0.11 | $0.11 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 4,271 | $0.45 | $0.45 | $0.45 |
| 68 | Traffic control warning lights type A (643.0705) | DAY | 8,542 | $0.10 | $0.10 | $0.10 |
| 69 | Traffic control warning lights type C (643.0715) | DAY | 4,256 | $0.10 | $0.10 | $0.10 |
| 70 | Traffic control connected arrow boards (643.0810) | DAY | 194 | $25.00 | $25.00 | $25.00 |
| 71 | Traffic control signs (643.0900) | DAY | 15,886 | $0.25 | $0.25 | $0.25 |
| 72 | Traffic control covering signs type II (643.0920) | EACH | 2 | $65.00 | $65.00 | $65.00 |
| 73 | Traffic control signs fixed message (643.1000) | SF | 75 | $15.00 | $15.00 | $15.00 |
| 74 | Traffic control signs PCMS (643.1050) | DAY | 63 | $50.00 | $50.00 | $50.00 |
| 75 | Traffic control cones 42-inch (643.1070) | DAY | 55,708 | $0.12 | $0.12 | $0.12 |
| 76 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 304 | $7.25 | $7.25 | $7.25 |
| 77 | Temporary marking line paint 6- inch (643.3165) | LF | 146,360 | $0.33 | $0.50 | $0.21 |
| 78 | Traffic control (643.5000) | EACH | 1 | $20,998 | $20,998 | $20,998 |
| 79 | Marking line epoxy 4-inch (646.1020) | LF | 133 | $5.00 | $0.45 | $5.00 |
| 80 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 19,643 | $0.74 | $0.70 | $0.74 |
| 81 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 146,360 | $1.17 | $1.25 | $1.17 |
| 82 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 19,643 | $7.46 | $6.25 | $7.46 |
| 83 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 11,476 | $13.30 | $10.50 | $13.30 |
| 84 | Marking stop line epoxy 18-inch (646.6120) | LF | 73 | $17.27 | $20.00 | $17.27 |
| 85 | Construction staking storm sewer (650.4000) | EACH | 3 | $50.00 | $100.00 | $100.00 |
| 86 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 24 | $5.00 | $0.75 | $0.75 |
| 87 | Construction staking resurfacing reference (650.8000) | LF | 78,215 | $0.12 | $0.14 | $0.14 |
| 88 | Construction staking supplemental control (project) 01. 4015-22-71 (650.9911) | EACH | 1 | $760.39 | $10.00 | $10.00 |
| 89 | Sawing asphalt (690.0150) | LF | 390 | $1.55 | $1.55 | $2.00 |
| 90 | Sawing concrete (690.0250) | LF | 1,050 | $2.85 | $2.85 | $2.75 |
| 91 | Incentive iri ride (740.0440) | DOL | 118,509.09 | $1.00 | $1.00 | $1.00 |
| 92 | Special 01. foundation backfill (SPV.0035) | CY | 220 | $38.70 | $44.74 | $38.70 |
| 93 | Special 01. grading shaping finishing endwalls (SPV.0060) | EACH | 5 | $1,600.00 | $1,300.00 | $1,600.00 |
| 94 | Special 02. abandon cattle pass (SPV.0060) | EACH | 1 | $37,500 | $62,000 | $37,500 |
| 95 | Special 03. median inlet restoration (SPV.0060) | EACH | 4 | $1,600.00 | $1,100.00 | $100.00 |
| 96 | Special 01. grading shaping for ditch (SPV.0090) | LF | 1,150 | $39.12 | $16.25 | $40.17 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.