WisDOT contract 20260915024 bid tabulation
Fifield - Woodruff; Price County Line to CTH F (STH 070, Vilas & Oneida Counties Fifield - Woodruff). Let by Wisconsin DOT on September 15, 2026, Vilas. 3 bids received; low bid $2,779,875 by Pitlik & Wick, Inc..
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 79
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pitlik & Wick, Inc. | $2,779,875 | Low |
| 2 | American Asphalt of Wisconsin | $2,802,930 | +1.0% |
| 3 | Northeast Asphalt, Inc | $3,462,065 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pitlik & Wick, Inc. | 2. American Asphalt of Wisconsin | 3. Northeast Asphalt, Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 4 | $2,500.00 | $950.00 | $2,118.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $850.00 | $950.00 | $950.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 350 | $10.00 | $9.50 | $18.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 670 | $14.68 | $3.50 | $8.70 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 194,700 | $0.78 | $0.34 | $2.50 |
| 6 | Removing curb & gutter (204.0150) | LF | 33 | $20.00 | $20.00 | $54.06 |
| 7 | Removing guardrail (204.0165) | LF | 513 | $6.67 | $3.00 | $3.00 |
| 8 | Excavation common (205.0100) | CY | 350 | $25.00 | $25.00 | $47.64 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 9070-03-74 (211.0101) | EACH | 1 | $1,000.00 | $1,000.00 | $6,400.00 |
| 10 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 14 | $200.00 | $242.31 | $390.00 |
| 11 | Finishing roadway (project) 01. 9070-03-74 (213.0100) | EACH | 1 | $1,000.00 | $3,000.00 | $1,500.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 14,900 | $22.21 | $24.85 | $30.10 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 500 | $25.25 | $26.00 | $27.40 |
| 14 | HMA cold weather paving (450.4000) | TON | 5,500 | $1.00 | $0.01 | $3.00 |
| 15 | Tack coat (455.0605) | GAL | 6,420 | $3.25 | $6.31 | $3.25 |
| 16 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,500.00 | $5,000.00 | $2,400.00 |
| 17 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,500.00 | $5,000.00 | $3,470.00 |
| 18 | Incentive density PWL HMA pavement (460.2005) | DOL | 10,670 | $1.00 | $1.00 | $1.00 |
| 19 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 11,150 | $1.00 | $1.00 | $1.00 |
| 20 | Incentive air voids HMA pavement (460.2010) | DOL | 14,090 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 22,010 | $70.10 | $72.20 | $70.90 |
| 22 | Asphaltic surface (465.0105) | TON | 125 | $125.00 | $95.65 | $124.30 |
| 23 | Asphaltic surface patching (465.0110) | TON | 2 | $150.00 | $149.00 | $287.00 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 30 | $150.00 | $233.60 | $181.30 |
| 25 | Asphaltic rumble strips, centerline (465.0560) | LF | 42,600 | $0.45 | $0.32 | $0.32 |
| 26 | Resin binder high friction surface treatment (490.0100.S) | SY | 6,520 | $20.82 | $20.82 | $20.75 |
| 27 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 33 | $125.68 | $125.68 | $125.68 |
| 28 | Riprap medium (606.0200) | CY | 14 | $100.00 | $175.00 | $122.99 |
| 29 | Adjusting catch basin covers (611.8105) | EACH | 2 | $1,500.00 | $600.00 | $1,251.00 |
| 30 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,500.00 | $600.00 | $1,251.00 |
| 31 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 278 | $10.00 | $20.00 | $20.00 |
| 32 | MGS guardrail 3 (614.2300) | LF | 188 | $36.36 | $32.15 | $35.25 |
| 33 | MGS guardrail 3 L (614.2340) | LF | 225 | $42.06 | $34.25 | $39.25 |
| 34 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,888.00 | $3,555.00 | $3,995.00 |
| 35 | Maintenance and repair of haul roads (project) 01. 9070-03-74 (618.0100) | EACH | 1 | $100.00 | $1.00 | $1.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $27,500 | $46,185 | $164,870 |
| 37 | Water (624.0100) | MGAL | 300 | $10.00 | $0.01 | $70.00 |
| 38 | Topsoil (625.0100) | SY | 1,600 | $2.00 | $5.50 | $6.67 |
| 39 | Silt fence (628.1504) | LF | 900 | $3.00 | $3.00 | $3.00 |
| 40 | Silt fence maintenance (628.1520) | LF | 900 | $0.10 | $0.03 | $0.03 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 3 | $500.00 | $293.00 | $293.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $500.00 | $353.00 | $353.00 |
| 43 | Erosion mat urban class I type B (628.2008) | SY | 1,600 | $3.09 | $2.50 | $2.50 |
| 44 | Inlet protection type C (628.7015) | EACH | 3 | $50.00 | $75.00 | $75.00 |
| 45 | Temporary ditch checks (628.7504) | LF | 60 | $14.55 | $8.00 | $8.00 |
| 46 | Rock bags (628.7570) | EACH | 75 | $16.00 | $8.00 | $8.00 |
| 47 | Fertilizer type B (629.0210) | CWT | 1 | $131.00 | $100.00 | $100.00 |
| 48 | Seeding mixture no. 20 (630.0120) | LB | 73 | $3.37 | $11.00 | $11.00 |
| 49 | Seed water (630.0500) | MGAL | 54 | $10.00 | $5.00 | $5.00 |
| 50 | Markers culvert end (633.5200) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 51 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $200.00 | $150.00 | $150.00 |
| 52 | Signs type II reflective H (637.2210) | SF | 16 | $48.00 | $35.00 | $35.00 |
| 53 | Moving signs type II (638.2102) | EACH | 2 | $65.00 | $150.00 | $150.00 |
| 54 | Moving small sign supports (638.4000) | EACH | 1 | $150.00 | $150.00 | $150.00 |
| 55 | Field office type C (642.5201) | EACH | 1 | $5,000.00 | $8,000.00 | $15,200 |
| 56 | Traffic control drums (643.0300) | DAY | 630 | $0.50 | $0.50 | $0.50 |
| 57 | Traffic control barricades type III (643.0420) | DAY | 30 | $1.00 | $1.00 | $1.00 |
| 58 | Traffic control warning lights type A (643.0705) | DAY | 40 | $0.25 | $0.25 | $0.25 |
| 59 | Traffic control warning lights type C (643.0715) | DAY | 35 | $0.35 | $0.35 | $0.35 |
| 60 | Traffic control signs (643.0900) | DAY | 3,180 | $2.40 | $2.40 | $2.40 |
| 61 | Traffic control signs fixed message (643.1000) | SF | 36 | $10.20 | $10.20 | $10.20 |
| 62 | Temporary marking line paint 6- inch (643.3165) | LF | 145,000 | $0.40 | $0.40 | $0.50 |
| 63 | Temporary marking raised pavement marker type II (643.3770) | EACH | 80 | $4.50 | $8.00 | $4.50 |
| 64 | Traffic control (643.5000) | EACH | 1 | $3,700.00 | $3,700.00 | $3,825.00 |
| 65 | Geotextile type HR (645.0120) | SY | 42 | $5.00 | $10.00 | $25.00 |
| 66 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 182,300 | $1.10 | $1.10 | $1.10 |
| 67 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 200 | $2.00 | $2.00 | $2.00 |
| 68 | Construction staking subgrade (650.4500) | LF | 500 | $0.01 | $0.01 | $0.01 |
| 69 | Construction staking base (650.5000) | LF | 500 | $1.00 | $1.00 | $1.00 |
| 70 | Construction staking resurfacing reference (650.8000) | LF | 55,275 | $0.10 | $0.10 | $0.10 |
| 71 | Construction staking supplemental control (project) 01. 9070-03-74 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 72 | Construction staking slope stakes (650.9920) | LF | 500 | $1.00 | $1.00 | $1.00 |
| 73 | Sawing asphalt (690.0150) | LF | 990 | $1.70 | $3.37 | $1.96 |
| 74 | Sawing concrete (690.0250) | LF | 18 | $2.35 | $3.95 | $3.95 |
| 75 | Incentive iri ride (740.0440) | DOL | 42,250 | $1.00 | $1.00 | $1.00 |
| 76 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 |
| 77 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,980 | $5.00 | $5.00 | $5.00 |
| 78 | Special 01. protective thermoplastic coating at snowmobile crossings (SPV.0180) | SY | 72 | $135.00 | $190.00 | $190.00 |
| 79 | Special 01. disintegrated granite (SPV.0195) | TON | 5 | $25.00 | $85.00 | $204.31 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.