WisDOT contract 20260915033 bid tabulation
Suamico - Abrams; CTH D Interchange (USH 041, Oconto County Suamico - Abrams). Let by Wisconsin DOT on September 15, 2026, Oconto. 4 bids received; low bid $200,000 by Highway Landscapers, Inc..
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 55
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Highway Landscapers, Inc. | $200,000 | Low |
| 2 | Peters Concrete Company | $269,129 | +35% |
| 3 | Vinton Construction Company | $292,054 | +46% |
| 4 | Northeast Asphalt, Inc | $293,508 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Highway Landscapers, Inc. | 2. Peters Concrete Company | 3. Vinton Construction Company | 4. Northeast Asphalt, Inc |
|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $750.00 | $250.00 | $1,000.00 | $605.99 |
| 2 | Removing guardrail (204.0165) | LF | 80 | $10.00 | $5.00 | $5.00 | $5.00 |
| 3 | Excavation common (205.0100) | CY | 1,495 | $18.50 | $31.42 | $30.00 | $20.00 |
| 4 | Finishing roadway (project) 01. 1490-16-70 (213.0100) | EACH | 1 | $1.00 | $1,500.00 | $1,500.00 | $1,800.00 |
| 5 | Base aggregate dense 3/4-inch (305.0110) | TON | 2 | $200.00 | $200.00 | $100.00 | $163.99 |
| 6 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 38 | $28.00 | $65.00 | $30.00 | $51.72 |
| 7 | Select crushed material (312.0110) | TON | 2,300 | $24.00 | $25.85 | $23.66 | $31.42 |
| 8 | HMA cold weather paving (450.4000) | TON | 10 | $1.00 | $18.15 | $0.01 | $18.15 |
| 9 | Asphaltic surface (465.0105) | TON | 10 | $500.00 | $385.00 | $250.00 | $385.00 |
| 10 | Culvert pipe temporary 18-inch (520.2018) | LF | 50 | $1.00 | $15.00 | $33.00 | $50.92 |
| 11 | Cleaning culvert pipes (520.8700) | EACH | 1 | $500.00 | $2,000.00 | $1,000.00 | $2,000.00 |
| 12 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 160 | $95.00 | $70.00 | $95.00 | $70.00 |
| 13 | Concrete surface drains (602.3010) | CY | 4 | $2,200.00 | $2,370.00 | $2,000.00 | $2,370.00 |
| 14 | Riprap light (606.0100) | CY | 550 | $66.50 | $66.75 | $88.00 | $90.29 |
| 15 | Riprap medium (606.0200) | CY | 1 | $500.00 | $250.00 | $200.00 | $341.12 |
| 16 | MGS guardrail 3 (614.2300) | LF | 87.50 | $40.00 | $30.00 | $30.00 | $30.00 |
| 17 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $4,000.00 | $3,250.00 | $3,250.00 | $3,250.00 |
| 18 | Mobilization (619.1000) | EACH | 1 | $14,467 | $45,300 | $56,500 | $55,000 |
| 19 | Water (624.0100) | MGAL | 1 | $1.00 | $100.00 | $0.01 | $233.08 |
| 20 | Topsoil (625.0100) | SY | 680 | $4.00 | $4.50 | $5.00 | $6.00 |
| 21 | Silt fence (628.1504) | LF | 520 | $2.00 | $2.00 | $2.00 | $2.00 |
| 22 | Silt fence maintenance (628.1520) | LF | 520 | $0.01 | $0.01 | $0.01 | $0.01 |
| 23 | Mobilizations erosion control (628.1905) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 24 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Erosion mat class I type A (628.2002) | SY | 680 | $1.00 | $2.00 | $2.00 | $2.00 |
| 26 | Temporary ditch checks (628.7504) | LF | 40 | $10.00 | $10.00 | $10.00 | $10.00 |
| 27 | Culvert pipe checks (628.7555) | EACH | 3 | $15.00 | $15.00 | $15.00 | $15.00 |
| 28 | Tracking pads (628.7560) | EACH | 1 | $1.00 | $2,000.00 | $8,500.00 | $2,438.59 |
| 29 | Fertilizer type B (629.0210) | CWT | 5 | $1.00 | $1.00 | $1.00 | $1.00 |
| 30 | Seeding mixture no. 30 (630.0130) | LB | 35 | $10.00 | $15.00 | $15.00 | $15.00 |
| 31 | Seed water (630.0500) | MGAL | 10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | Moving signs type II (638.2102) | EACH | 1 | $50.00 | $50.00 | $50.00 | $50.00 |
| 33 | Removing small sign supports (638.3000) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 34 | Field office type C (642.5201) | EACH | 1 | $1.00 | $5,000.00 | $5,000.00 | $6,003.53 |
| 35 | Traffic control drums (643.0300) | DAY | 4,300 | $0.01 | $0.20 | $0.20 | $0.20 |
| 36 | Traffic control barricades type III (643.0420) | DAY | 330 | $0.01 | $0.75 | $0.75 | $0.75 |
| 37 | Traffic control warning lights type A (643.0705) | DAY | 660 | $0.01 | $0.11 | $0.11 | $0.11 |
| 38 | Traffic control warning lights type C (643.0715) | DAY | 1,323 | $0.01 | $0.13 | $0.13 | $0.13 |
| 39 | Traffic control connected arrow boards (643.0810) | DAY | 66 | $0.01 | $17.25 | $17.25 | $17.25 |
| 40 | Traffic control signs (643.0900) | DAY | 825 | $0.01 | $0.30 | $0.30 | $0.30 |
| 41 | Traffic control covering signs type II (643.0920) | EACH | 1 | $0.01 | $50.00 | $50.00 | $50.00 |
| 42 | Basic traffic queue warning system (643.1205.S) | DAY | 33 | $0.01 | $75.00 | $75.00 | $75.00 |
| 43 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,040 | $0.01 | $2.25 | $2.25 | $2.25 |
| 44 | Temporary marking line removable tape 10-inch (643.3280) | LF | 200 | $0.01 | $5.00 | $5.00 | $5.00 |
| 45 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 260 | $0.01 | $5.00 | $5.00 | $5.00 |
| 46 | Traffic control (643.5000) | EACH | 1 | $10,000 | $11,000 | $11,000 | $11,000 |
| 47 | Geotextile type HR (645.0120) | SY | 10 | $4.00 | $5.00 | $10.00 | $10.43 |
| 48 | Geotextile type R (645.0130) | SY | 1,490 | $4.00 | $2.00 | $2.50 | $2.78 |
| 49 | Construction staking subgrade (650.4500) | LF | 200 | $0.01 | $0.01 | $0.01 | $5.94 |
| 50 | Construction staking base (650.5000) | LF | 200 | $0.01 | $5.00 | $2.00 | $2.00 |
| 51 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 160 | $0.01 | $6.00 | $2.50 | $2.50 |
| 52 | Construction staking supplemental control (project) 01. 1490-16-70 (650.9911) | EACH | 1 | $1,750.00 | $10.00 | $800.00 | $800.00 |
| 53 | Construction staking slope stakes (650.9920) | LF | 200 | $2.00 | $5.00 | $2.00 | $2.00 |
| 54 | Sawing asphalt (690.0150) | LF | 205 | $4.00 | $2.25 | $5.00 | $2.25 |
| 55 | Sawing concrete (690.0250) | LF | 5 | $10.00 | $3.00 | $5.00 | $2.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.