WisDOT contract 20261013001 bid tabulation
Baraboo - Sauk City; Bridges-Terrytown Rd to Lehman Rd (USH 012, Sauk County Baraboo - Sauk City). Let by Wisconsin DOT on October 13, 2026, Sauk. 3 bids received; low bid $760,634 by Norcon Corporation.
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 22
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Norcon Corporation | $760,634 | Low |
| 2 | Ram Construction Services of Michigan, Inc. | $797,245 | +5.0% |
| 3 | Truesdell Corporation of Wisconsin, Inc. | $1,089,089 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Norcon Corporation | 2. Ram Construction Services of Michigan, Inc. | 3. Truesdell Corporation of Wisconsin, Inc. |
|---|---|---|---|---|---|---|
| 1 | Finishing roadway (project) 01. 1670-04-82 (213.0100) | EACH | 1 | $2,500.00 | $500.00 | $2,500.00 |
| 2 | Concrete surface repair (509.1500) | SF | 14 | $145.00 | $274.00 | $950.00 |
| 3 | Polymer overlay (509.5100.S) | SY | 19,160 | $32.98 | $32.40 | $42.00 |
| 4 | Maintenance and repair of haul roads (project) 01. 1670-04-82 (618.0100) | EACH | 1 | $1.00 | $500.00 | $2,500.00 |
| 5 | Mobilization (619.1000) | EACH | 1 | $41,040 | $68,000 | $97,827 |
| 6 | Field office type B (642.5001) | EACH | 1 | $4,500.00 | $1,000.00 | $6,500.00 |
| 7 | Traffic control drums (643.0300) | DAY | 3,748 | $1.00 | $0.50 | $0.25 |
| 8 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 32 | $225.00 | $250.00 | $165.00 |
| 9 | Traffic control barricades type III (643.0420) | DAY | 82 | $2.00 | $3.00 | $1.00 |
| 10 | Traffic control warning lights type A (643.0705) | DAY | 132 | $5.00 | $0.10 | $1.00 |
| 11 | Traffic control warning lights type C (643.0715) | DAY | 828 | $2.00 | $0.10 | $1.00 |
| 12 | Traffic control connected arrow boards (643.0810) | DAY | 32 | $25.00 | $60.00 | $11.00 |
| 13 | Traffic control signs (643.0900) | DAY | 448 | $2.00 | $1.25 | $1.00 |
| 14 | Traffic control covering signs type II (643.0920) | EACH | 18 | $35.00 | $55.00 | $130.00 |
| 15 | Traffic control signs PCMS (643.1050) | DAY | 36 | $75.00 | $175.00 | $40.00 |
| 16 | Traffic control cones 42-inch (643.1070) | DAY | 690 | $1.00 | $0.35 | $1.00 |
| 17 | Basic traffic queue warning system (643.1205.S) | DAY | 32 | $500.00 | $250.00 | $330.00 |
| 18 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 32 | $25.00 | $50.00 | $13.00 |
| 19 | Traffic control (643.5000) | EACH | 1 | $25,000 | $55,000 | $102,000 |
| 20 | Marking line epoxy 6-inch (646.2020) | LF | 9,888 | $1.50 | $1.50 | $3.20 |
| 21 | Marking line epoxy 10-inch (646.4020) | LF | 856 | $2.50 | $2.50 | $4.20 |
| 22 | Construction staking supplemental control (project) 01. 1670-04-82 (650.9911) | EACH | 1 | $750.00 | $825.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.