WisDOT contract 20261013015 bid tabulation
Nc Region, Epoxy Pavement Marking; Locations On Stn Per Annual Plan (VAR HWY, North Central Region Wide NC Region, Epoxy Pavement Marking). Let by Wisconsin DOT on October 13, 2026, North Central Region Wide. 2 bids received; low bid $2,276,148 by Century Traffic, LLC.
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 12
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Century Traffic, LLC | $2,276,148 | Low |
| 2 | Forward Traffic & Marking LLC | $2,522,197 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Century Traffic, LLC | 2. Forward Traffic & Marking LLC |
|---|---|---|---|---|---|
| 1 | Mobilization (619.1000) | EACH | 1 | $16,600 | $15,000 |
| 2 | Marking arrow epoxy (646.5020) | EACH | 315 | $255.00 | $195.32 |
| 3 | Marking word epoxy (646.5120) | EACH | 73 | $260.00 | $260.83 |
| 4 | Marking railroad crossing epoxy (646.5320) | EACH | 6 | $1,700.00 | $1,888.47 |
| 5 | Marking stop line epoxy 18-inch (646.6120) | LF | 3,719 | $20.00 | $11.63 |
| 6 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 332 | $20.00 | $15.84 |
| 7 | Marking diagonal epoxy 12-inch (646.7120) | LF | 2,069 | $12.00 | $11.26 |
| 8 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 4,513 | $10.50 | $9.57 |
| 9 | Special 01. traffic control (SPV.0060) | EACH | 1 | $7,500.00 | $15,000 |
| 10 | Special 02. striper computerized data logging system (SPV.0060) | EACH | 1 | $5,000.00 | $7,336.00 |
| 11 | Special 01. marking line double drop epoxy 6-inch (SPV.0090) | LF | 4,503,158 | $0.43 | $0.48 |
| 12 | Special 02. marking line double drop epoxy 10-inch (SPV.0090) | LF | 62,273 | $0.77 | $1.87 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.