WisDOT contract 20261013020 bid tabulation

Sayner - CTH K; STH 155 to CTH K (CTH N, Vilas County Sayner - CTH K). Let by Wisconsin DOT on October 13, 2026, Vilas. 3 bids received; low bid $185,675 by Century Traffic, LLC.

Owner
Wisconsin DOT
Letting
13 OCT 2026
Pay items
15
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Century Traffic, LLC$185,675Low
2Northeast Asphalt, Inc$218,198+18%
3Forward Traffic & Marking LLC$272,056+47%
WisDOT contract 20261013020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Century Traffic, LLC2. Northeast Asphalt, Inc3. Forward Traffic & Marking LLC
1Finishing roadway (project) 01. 9509-02-70 (213.0100)EACH1$1,500.00$1,150.00$4,500.00
2Asphaltic rumble strips, centerline (465.0560)LF20,718$0.58$0.58$0.27
3Mobilization (619.1000)EACH1$21,470$54,950$60,000
4Posts wood 4X6-inch X 14-FT (634.0614)EACH62$80.00$80.00$370.00
5Posts wood 4X6-inch X 16-FT (634.0616)EACH12$90.00$90.00$390.00
6Posts wood 4X6-inch X 18-FT (634.0618)EACH14$95.00$95.00$400.00
7Signs type II reflective F (637.2230)SF647.36$22.00$22.00$26.85
8Removing signs type II (638.2602)EACH15$22.00$22.00$75.00
9Removing small sign supports (638.3000)EACH4$22.00$22.00$110.00
10Traffic control signs (643.0900)DAY1,400$0.25$3.00$0.25
11Traffic control (643.5000)EACH1$2,500.00$3,860.00$6,850.00
12Marking line grooved wet ref epoxy 6-inch (646.2040)LF116,336$1.00$0.95$1.16
13Locating no-passing zones (648.0100)MI5.85$850.00$850.00$537.72
14On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00
15On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00
WisDOT contract 20261013020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy