| 1 | Roadside clearing (202.0105) | STA | 96 | $135.95 | $399.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 2 | $552.00 | $1,600.00 |
| 3 | Debris containment over waterway (structure) 01. B-16-79 (203.0335) | EACH | 1 | $2,275.00 | $2,275.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 190 | $37.05 | $50.00 |
| 5 | Removing concrete pavement butt joints (204.0105) | SY | 1,738 | $21.61 | $21.61 |
| 6 | Removing asphaltic surface (204.0110) | SY | 621 | $6.37 | $20.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 1,335 | $11.96 | $11.96 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 13,540 | $5.02 | $5.02 |
| 9 | Removing curb & gutter (204.0150) | LF | 486 | $12.00 | $30.00 |
| 10 | Removing guardrail (204.0165) | LF | 1,093 | $2.88 | $2.25 |
| 11 | Excavation common (205.0100) | CY | 285 | $39.60 | $100.00 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 1196-00-60 (211.0101) | EACH | 1 | $123,250 | $123,250 |
| 13 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 30 | $355.50 | $355.50 |
| 14 | Finishing roadway (project) 01. 1196-00-60 (213.0100) | EACH | 1 | $2,835.00 | $1,000.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,400 | $28.77 | $28.77 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,290 | $39.12 | $31.00 |
| 17 | Concrete pavement 9-inch (415.0090) | SY | 80 | $201.27 | $300.00 |
| 18 | Concrete pavement approach slab (415.0410) | SY | 111 | $336.33 | $300.00 |
| 19 | Drilled tie bars (416.0610) | EACH | 1,100 | $11.03 | $15.00 |
| 20 | Drilled dowel bars (416.0620) | EACH | 1,300 | $15.05 | $30.00 |
| 21 | Tack coat (455.0605) | GAL | 13,030 | $2.68 | $2.68 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $8,600.00 | $8,600.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $2,250.00 | $2,250.00 |
| 24 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $8,000.00 | $8,000.00 |
| 25 | HMA test strip density (460.0120.S) | EACH | 1 | $2,250.00 | $2,250.00 |
| 26 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 12,216 | $102.77 | $102.77 |
| 27 | HMA pavement 4 SMA 58-34 V (460.8644) | TON | 7,240 | $116.50 | $116.50 |
| 28 | Material transfer vehicle (460.9000.S) | EACH | 1 | $18,360 | $18,360 |
| 29 | Asphaltic surface (465.0105) | TON | 2,085 | $115.65 | $115.65 |
| 30 | Asphaltic surface patching (465.0110) | TON | 390 | $103.25 | $103.25 |
| 31 | Asphaltic flumes (465.0315) | SY | 58 | $76.35 | $76.35 |
| 32 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 38,160 | $0.29 | $0.18 |
| 33 | Preparation decks type 1 (509.0301) | SY | 6 | $315.00 | $315.00 |
| 34 | Preparation decks type 2 (509.0302) | SY | 6 | $385.00 | $385.00 |
| 35 | Sawing pavement deck preparation areas (509.0310.S) | LF | 180 | $9.90 | $9.90 |
| 36 | Concrete masonry deck repair (509.2100.S) | CY | 2 | $4,770.00 | $4,770.00 |
| 37 | Cleaning culvert pipes (520.8700) | EACH | 7 | $250.00 | $650.00 |
| 38 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 3 | $500.00 | $1,000.00 |
| 39 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 84 | $119.10 | $300.00 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 434 | $57.56 | $90.00 |
| 41 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 32 | $101.16 | $90.00 |
| 42 | Concrete barrier temporary precast delivered (603.8000) | LF | 563 | $9.99 | $22.50 |
| 43 | Concrete barrier temporary precast installed (603.8125) | LF | 1,126 | $6.47 | $9.00 |
| 44 | Adjusting inlet covers (611.8115) | EACH | 2 | $842.00 | $1,000.00 |
| 45 | MGS guardrail 3 (614.2300) | LF | 500 | $25.30 | $27.00 |
| 46 | MGS thrie beam transition (614.2500) | LF | 118.20 | $104.40 | $89.00 |
| 47 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $3,576.00 | $3,403.00 |
| 48 | Maintenance and repair of haul roads (project) 01. 1196-00-60 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 49 | Mobilization (619.1000) | EACH | 1 | $425,450 | $1,003,000 |
| 50 | Water (624.0100) | MGAL | 58 | $59.10 | $59.10 |
| 51 | Topsoil (625.0100) | SY | 2,070 | $5.20 | $20.00 |
| 52 | Silt fence (628.1504) | LF | 3,250 | $1.95 | $2.00 |
| 53 | Silt fence maintenance (628.1520) | LF | 3,250 | $0.01 | $0.03 |
| 54 | Mobilizations erosion control (628.1905) | EACH | 4 | $1,135.00 | $253.00 |
| 55 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $383.00 |
| 56 | Erosion mat urban class I type B (628.2008) | SY | 2,070 | $2.00 | $2.00 |
| 57 | Inlet protection type A (628.7005) | EACH | 2 | $158.00 | $125.00 |
| 58 | Inlet protection type C (628.7015) | EACH | 3 | $67.25 | $75.00 |
| 59 | Temporary ditch checks (628.7504) | LF | 45 | $6.15 | $10.00 |
| 60 | Culvert pipe checks (628.7555) | EACH | 23 | $10.00 | $20.00 |
| 61 | Rock bags (628.7570) | EACH | 215 | $10.00 | $7.00 |
| 62 | Fertilizer type B (629.0210) | CWT | 2 | $182.25 | $100.00 |
| 63 | Seeding mixture no. 30 (630.0130) | LB | 92 | $14.85 | $11.00 |
| 64 | Seed water (630.0500) | MGAL | 120 | $0.01 | $5.00 |
| 65 | Markers culvert end (633.5200) | EACH | 20 | $62.75 | $75.00 |
| 66 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 5 | $99.25 | $105.00 |
| 67 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 2 | $122.50 | $125.00 |
| 68 | Moving signs type II (638.2102) | EACH | 7 | $77.25 | $150.00 |
| 69 | Removing small sign supports (638.3000) | EACH | 7 | $22.00 | $50.00 |
| 70 | Moving small sign supports (638.4000) | EACH | 4 | $77.25 | $150.00 |
| 71 | Field office type B (642.5001) | EACH | 1 | $15,100 | $30,000 |
| 72 | Traffic control drums (643.0300) | DAY | 113,860 | $0.15 | $0.15 |
| 73 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 520 | $14.75 | $14.75 |
| 74 | Traffic control barricades type III (643.0420) | DAY | 1,480 | $0.40 | $0.40 |
| 75 | Traffic control warning lights type A (643.0705) | DAY | 2,700 | $0.20 | $0.20 |
| 76 | Traffic control warning lights type C (643.0715) | DAY | 3,050 | $0.20 | $0.20 |
| 77 | Traffic control connected arrow boards (643.0810) | DAY | 170 | $9.60 | $9.60 |
| 78 | Traffic control signs (643.0900) | DAY | 7,890 | $0.16 | $0.16 |
| 79 | Traffic control covering signs type II (643.0920) | EACH | 6 | $110.00 | $110.00 |
| 80 | Traffic control signs fixed message (643.1000) | SF | 32 | $14.75 | $14.75 |
| 81 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 170 | $6.00 | $6.00 |
| 82 | Temporary marking line paint 6- inch (643.3165) | LF | 2,000 | $0.85 | $0.85 |
| 83 | Temporary marking line removable tape 6-inch (643.3180) | LF | 27,700 | $2.25 | $2.25 |
| 84 | Temporary marking line removable tape 10-inch (643.3280) | LF | 800 | $4.00 | $4.00 |
| 85 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 10,900 | $2.90 | $2.90 |
| 86 | Traffic control (643.5000) | EACH | 1 | $110,030 | $67,500 |
| 87 | Marking line epoxy 6-inch (646.2020) | LF | 1,210 | $0.60 | $0.60 |
| 88 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 5,200 | $1.00 | $1.00 |
| 89 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 46,007 | $1.50 | $1.50 |
| 90 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,253 | $3.25 | $3.25 |
| 91 | Marking arrow epoxy (646.5020) | EACH | 15 | $252.00 | $252.00 |
| 92 | Marking word epoxy (646.5120) | EACH | 6 | $336.25 | $336.25 |
| 93 | Marking stop line epoxy 18-inch (646.6120) | LF | 67 | $20.50 | $20.50 |
| 94 | Marking yield line epoxy 18-inch (646.6220) | EACH | 14 | $49.00 | $49.00 |
| 95 | Cold weather marking epoxy 6-inch (646.6466) | LF | 52,417 | $0.60 | $0.60 |
| 96 | Cold weather marking epoxy 10- inch (646.6470) | LF | 2,253 | $1.35 | $1.35 |
| 97 | Marking diagonal epoxy 12-inch (646.7120) | LF | 190 | $19.95 | $19.95 |
| 98 | Marking removal line 6-inch (646.9002) | LF | 500 | $5.00 | $5.00 |
| 99 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 466 | $2.00 | $5.00 |
| 100 | Construction staking pipe culverts (650.6000) | EACH | 2 | $325.50 | $300.00 |
| 101 | Construction staking resurfacing reference (650.8000) | LF | 20,983 | $0.07 | $0.12 |
| 102 | Construction staking supplemental control (project) 01. 1196-00-60 (650.9911) | EACH | 1 | $570.19 | $1,000.00 |
| 103 | Construction staking slope stakes (650.9920) | LF | 878 | $1.00 | $1.25 |
| 104 | Sawing asphalt (690.0150) | LF | 4,530 | $1.95 | $1.95 |
| 105 | Sawing concrete (690.0250) | LF | 14,500 | $2.55 | $2.55 |
| 106 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 107 | Incentive iri ride (740.0440) | DOL | 7,800 | $1.00 | $1.00 |
| 108 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 14,940 | $1.00 | $1.00 |
| 109 | Special 02. incentive air voids HMA pavement (SPV.0055) | DOL | 19,460 | $1.00 | $1.00 |
| 110 | Special 03. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 6,280 | $1.00 | $1.00 |
| 111 | Special 01. concrete pavement repair doweled (SPV.0180) | SY | 1,200 | $124.45 | $123.00 |
| 112 | Special 02. concrete pavement replacement doweled (SPV.0180) | SY | 2,300 | $124.45 | $125.00 |
| 113 | Special 03. concrete pavement centerline joint repair (SPV.0180) | SY | 500 | $124.45 | $123.00 |