WisDOT contract 20261013025 bid tabulation

Minong - Solon Springs; CTH Y to CTH M (Sb) (USH 053, Douglas County Minong - Solon Springs; CTH Y to CTH M (SB)). Let by Wisconsin DOT on October 13, 2026, Douglas. 2 bids received; low bid $4,592,087 by Monarch Paving Company.

Owner
Wisconsin DOT
Letting
13 OCT 2026
Pay items
113
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Monarch Paving Company$4,592,087Low
2Zignego Company, Inc.$5,289,268+15%
WisDOT contract 20261013025: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Monarch Paving Company2. Zignego Company, Inc.
1Roadside clearing (202.0105)STA96$135.95$399.00
2Removing small pipe culverts (203.0100)EACH2$552.00$1,600.00
3Debris containment over waterway (structure) 01. B-16-79 (203.0335)EACH1$2,275.00$2,275.00
4Removing concrete pavement (204.0100)SY190$37.05$50.00
5Removing concrete pavement butt joints (204.0105)SY1,738$21.61$21.61
6Removing asphaltic surface (204.0110)SY621$6.37$20.00
7Removing asphaltic surface butt joints (204.0115)SY1,335$11.96$11.96
8Removing asphaltic surface milling (204.0120)SY13,540$5.02$5.02
9Removing curb & gutter (204.0150)LF486$12.00$30.00
10Removing guardrail (204.0165)LF1,093$2.88$2.25
11Excavation common (205.0100)CY285$39.60$100.00
12Prepare foundation for asphaltic paving (project) 01. 1196-00-60 (211.0101)EACH1$123,250$123,250
13Prepare foundation for asphaltic shoulders (211.0400)STA30$355.50$355.50
14Finishing roadway (project) 01. 1196-00-60 (213.0100)EACH1$2,835.00$1,000.00
15Base aggregate dense 3/4-inch (305.0110)TON4,400$28.77$28.77
16Base aggregate dense 1 1/4-inch (305.0120)TON1,290$39.12$31.00
17Concrete pavement 9-inch (415.0090)SY80$201.27$300.00
18Concrete pavement approach slab (415.0410)SY111$336.33$300.00
19Drilled tie bars (416.0610)EACH1,100$11.03$15.00
20Drilled dowel bars (416.0620)EACH1,300$15.05$30.00
21Tack coat (455.0605)GAL13,030$2.68$2.68
22HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$8,600.00$8,600.00
23HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$2,250.00$2,250.00
24HMA pavement test strip volumetrics (460.0115.S)EACH1$8,000.00$8,000.00
25HMA test strip density (460.0120.S)EACH1$2,250.00$2,250.00
26HMA pavement 4 MT 58-34 S (460.6244)TON12,216$102.77$102.77
27HMA pavement 4 SMA 58-34 V (460.8644)TON7,240$116.50$116.50
28Material transfer vehicle (460.9000.S)EACH1$18,360$18,360
29Asphaltic surface (465.0105)TON2,085$115.65$115.65
30Asphaltic surface patching (465.0110)TON390$103.25$103.25
31Asphaltic flumes (465.0315)SY58$76.35$76.35
32Asphaltic rumble strips, shoulder divided roadway (465.0510)LF38,160$0.29$0.18
33Preparation decks type 1 (509.0301)SY6$315.00$315.00
34Preparation decks type 2 (509.0302)SY6$385.00$385.00
35Sawing pavement deck preparation areas (509.0310.S)LF180$9.90$9.90
36Concrete masonry deck repair (509.2100.S)CY2$4,770.00$4,770.00
37Cleaning culvert pipes (520.8700)EACH7$250.00$650.00
38Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH3$500.00$1,000.00
39Culvert pipe corrugated steel 18- inch (521.3118)LF84$119.10$300.00
40Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF434$57.56$90.00
41Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF32$101.16$90.00
42Concrete barrier temporary precast delivered (603.8000)LF563$9.99$22.50
43Concrete barrier temporary precast installed (603.8125)LF1,126$6.47$9.00
44Adjusting inlet covers (611.8115)EACH2$842.00$1,000.00
45MGS guardrail 3 (614.2300)LF500$25.30$27.00
46MGS thrie beam transition (614.2500)LF118.20$104.40$89.00
47MGS guardrail terminal eat (614.2610)EACH3$3,576.00$3,403.00
48Maintenance and repair of haul roads (project) 01. 1196-00-60 (618.0100)EACH1$1.00$1.00
49Mobilization (619.1000)EACH1$425,450$1,003,000
50Water (624.0100)MGAL58$59.10$59.10
51Topsoil (625.0100)SY2,070$5.20$20.00
52Silt fence (628.1504)LF3,250$1.95$2.00
53Silt fence maintenance (628.1520)LF3,250$0.01$0.03
54Mobilizations erosion control (628.1905)EACH4$1,135.00$253.00
55Mobilizations emergency erosion control (628.1910)EACH2$200.00$383.00
56Erosion mat urban class I type B (628.2008)SY2,070$2.00$2.00
57Inlet protection type A (628.7005)EACH2$158.00$125.00
58Inlet protection type C (628.7015)EACH3$67.25$75.00
59Temporary ditch checks (628.7504)LF45$6.15$10.00
60Culvert pipe checks (628.7555)EACH23$10.00$20.00
61Rock bags (628.7570)EACH215$10.00$7.00
62Fertilizer type B (629.0210)CWT2$182.25$100.00
63Seeding mixture no. 30 (630.0130)LB92$14.85$11.00
64Seed water (630.0500)MGAL120$0.01$5.00
65Markers culvert end (633.5200)EACH20$62.75$75.00
66Posts wood 4X6-inch X 16-FT (634.0616)EACH5$99.25$105.00
67Posts wood 4X6-inch X 20-FT (634.0620)EACH2$122.50$125.00
68Moving signs type II (638.2102)EACH7$77.25$150.00
69Removing small sign supports (638.3000)EACH7$22.00$50.00
70Moving small sign supports (638.4000)EACH4$77.25$150.00
71Field office type B (642.5001)EACH1$15,100$30,000
72Traffic control drums (643.0300)DAY113,860$0.15$0.15
73Digital speed reduction system (DSRS) (643.0370.S)DAY520$14.75$14.75
74Traffic control barricades type III (643.0420)DAY1,480$0.40$0.40
75Traffic control warning lights type A (643.0705)DAY2,700$0.20$0.20
76Traffic control warning lights type C (643.0715)DAY3,050$0.20$0.20
77Traffic control connected arrow boards (643.0810)DAY170$9.60$9.60
78Traffic control signs (643.0900)DAY7,890$0.16$0.16
79Traffic control covering signs type II (643.0920)EACH6$110.00$110.00
80Traffic control signs fixed message (643.1000)SF32$14.75$14.75
81Traffic control connected work zone start and end location markers (643.1220)DAY170$6.00$6.00
82Temporary marking line paint 6- inch (643.3165)LF2,000$0.85$0.85
83Temporary marking line removable tape 6-inch (643.3180)LF27,700$2.25$2.25
84Temporary marking line removable tape 10-inch (643.3280)LF800$4.00$4.00
85Temporary marking removable mask out tape 6-inch (643.3960)LF10,900$2.90$2.90
86Traffic control (643.5000)EACH1$110,030$67,500
87Marking line epoxy 6-inch (646.2020)LF1,210$0.60$0.60
88Marking line grooved black epoxy 6-inch (646.2025)LF5,200$1.00$1.00
89Marking line grooved wet ref epoxy 6-inch (646.2040)LF46,007$1.50$1.50
90Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,253$3.25$3.25
91Marking arrow epoxy (646.5020)EACH15$252.00$252.00
92Marking word epoxy (646.5120)EACH6$336.25$336.25
93Marking stop line epoxy 18-inch (646.6120)LF67$20.50$20.50
94Marking yield line epoxy 18-inch (646.6220)EACH14$49.00$49.00
95Cold weather marking epoxy 6-inch (646.6466)LF52,417$0.60$0.60
96Cold weather marking epoxy 10- inch (646.6470)LF2,253$1.35$1.35
97Marking diagonal epoxy 12-inch (646.7120)LF190$19.95$19.95
98Marking removal line 6-inch (646.9002)LF500$5.00$5.00
99Construction staking curb gutter and curb & gutter (650.5500)LF466$2.00$5.00
100Construction staking pipe culverts (650.6000)EACH2$325.50$300.00
101Construction staking resurfacing reference (650.8000)LF20,983$0.07$0.12
102Construction staking supplemental control (project) 01. 1196-00-60 (650.9911)EACH1$570.19$1,000.00
103Construction staking slope stakes (650.9920)LF878$1.00$1.25
104Sawing asphalt (690.0150)LF4,530$1.95$1.95
105Sawing concrete (690.0250)LF14,500$2.55$2.55
106Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00
107Incentive iri ride (740.0440)DOL7,800$1.00$1.00
108Special 01. incentive density PWL HMA pavement (SPV.0055)DOL14,940$1.00$1.00
109Special 02. incentive air voids HMA pavement (SPV.0055)DOL19,460$1.00$1.00
110Special 03. incentive density HMA pavement longitudinal joints (SPV.0055)DOL6,280$1.00$1.00
111Special 01. concrete pavement repair doweled (SPV.0180)SY1,200$124.45$123.00
112Special 02. concrete pavement replacement doweled (SPV.0180)SY2,300$124.45$125.00
113Special 03. concrete pavement centerline joint repair (SPV.0180)SY500$124.45$123.00
WisDOT contract 20261013025: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy