WisDOT contract 20261110027 bid tabulation
Merrill - Antigo; Zima Road to USH 45 (STH 064, Langlade County Merrill - Antigo; Zima Rd to USH 45). Let by Wisconsin DOT on November 10, 2026, Langlade. 2 bids received; low bid $1,534,822 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 39
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $1,534,822 | Low |
| 2 | American Asphalt of Wisconsin | $1,595,498 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. American Asphalt of Wisconsin |
|---|---|---|---|---|---|
| 1 | Removing asphaltic surface butt joints (204.0115) | SY | 587 | $6.81 | $8.95 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 67,208 | $1.00 | $2.05 |
| 3 | Removing (item description) 01. asphaltic flume (204.9060.S) | EACH | 1 | $1,510.00 | $279.65 |
| 4 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 36 | $50.25 | $17.92 |
| 5 | Finishing roadway (project) 01. 9015-12-71 (213.0100) | EACH | 1 | $1,500.00 | $500.00 |
| 6 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,080 | $24.10 | $35.75 |
| 7 | Shaping shoulders (305.0500) | STA | 140 | $91.00 | $35.90 |
| 8 | HMA pavement 4 MT 58-28 S (450.6224) | TON | 14,636 | $72.70 | $66.40 |
| 9 | Tack coat (455.0605) | GAL | 4,752 | $3.20 | $6.00 |
| 10 | Asphaltic surface patching (465.0110) | TON | 50 | $140.00 | $155.44 |
| 11 | Asphaltic flumes (465.0315) | SY | 18 | $61.50 | $66.00 |
| 12 | Asphaltic rumble strips, shoulder (465.0520) | LF | 24,414 | $0.35 | $0.68 |
| 13 | Asphaltic rumble strips, centerline (465.0560) | LF | 12,314 | $0.35 | $0.58 |
| 14 | Maintenance and repair of haul roads (project) 01. 9015-12-71 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 15 | Mobilization (619.1000) | EACH | 1 | $87,735 | $135,575 |
| 16 | Water (624.0100) | MGAL | 31 | $34.50 | $50.00 |
| 17 | Field office type B (642.5001) | EACH | 1 | $12,190 | $8,500.00 |
| 18 | Traffic control signs (643.0900) | DAY | 644 | $0.30 | $0.30 |
| 19 | Temporary marking line paint 6- inch (643.3165) | LF | 61,389 | $0.45 | $0.35 |
| 20 | Traffic control (643.5000) | EACH | 1 | $2,300.00 | $2,300.00 |
| 21 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 61,389 | $1.10 | $1.10 |
| 22 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,399 | $2.00 | $2.00 |
| 23 | Marking arrow epoxy (646.5020) | EACH | 17 | $300.00 | $300.00 |
| 24 | Marking word epoxy (646.5120) | EACH | 16 | $330.00 | $330.00 |
| 25 | Marking stop line epoxy 18-inch (646.6120) | LF | 48 | $15.00 | $15.00 |
| 26 | Marking diagonal epoxy 12-inch (646.7120) | LF | 633 | $9.00 | $9.00 |
| 27 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 135 | $15.00 | $15.00 |
| 28 | Construction staking resurfacing reference (650.8000) | LF | 16,104 | $0.10 | $0.05 |
| 29 | Construction staking supplemental control (project) 01. 9015-12-71 (650.9911) | EACH | 1 | $0.01 | $100.80 |
| 30 | HMA percent within limits (PWL) test strip volumetrics (706.0105) | EACH | 1 | $3,250.00 | $5,000.00 |
| 31 | Nuclear gauge correlation strip - HMA, SMA (706.0110) | EACH | 2 | $3,975.00 | $5,000.00 |
| 32 | Incentive density PWL HMA pavement (706.2005) | DOL | 12,120 | $1.00 | $1.00 |
| 33 | Incentive density HMA pavement longitudinal joints (706.2007) | DOL | 3,230 | $1.00 | $1.00 |
| 34 | Incentive air voids HMA pavement (706.2010) | DOL | 14,650 | $1.00 | $1.00 |
| 35 | Incentive iri ride (740.0440) | DOL | 6,100 | $1.00 | $1.00 |
| 36 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 1,386 | $4.00 | $2.80 |
| 37 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 38 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 |
| 39 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 345 | $7.85 | $16.15 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.