| 1 | Clearing (201.0105) | STA | 1 | $775.00 | $775.00 |
| 2 | Grubbing (201.0205) | STA | 1 | $775.00 | $775.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,410 | $10.00 | $10.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 370 | $14.55 | $8.20 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 14,400 | $6.95 | $4.05 |
| 6 | Removing curb & gutter (204.0150) | LF | 3,630 | $2.50 | $2.50 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 650 | $8.50 | $8.50 |
| 8 | Removing guardrail (204.0165) | LF | 620 | $2.00 | $2.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 2 | $975.00 | $975.00 |
| 10 | Excavation common (205.0100) | CY | 33 | $85.00 | $85.00 |
| 11 | Borrow (208.0100) | CY | 15 | $85.00 | $85.00 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 9877-00-72 (211.0101) | EACH | 1 | $2,500.00 | $22,350 |
| 13 | Finishing roadway (project) 01. 9877-00-72 (213.0100) | EACH | 1 | $8,500.00 | $4,370.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 420 | $35.00 | $35.00 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 550 | $40.00 | $40.00 |
| 16 | Tack coat (455.0605) | GAL | 2,110 | $4.50 | $3.75 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 2,180 | $1.00 | $1.00 |
| 18 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,900 | $99.75 | $97.70 |
| 19 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 1,500 | $107.50 | $118.20 |
| 20 | Asphaltic surface (465.0105) | TON | 22 | $250.00 | $187.25 |
| 21 | Asphaltic surface patching (465.0110) | TON | 470 | $156.00 | $187.25 |
| 22 | Asphaltic surface driveways and field entrances (465.0120) | TON | 90 | $156.00 | $195.70 |
| 23 | Asphaltic surface temporary (465.0125) | TON | 25 | $156.00 | $230.00 |
| 24 | Asphaltic flumes (465.0315) | SY | 10 | $60.00 | $78.45 |
| 25 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 1,470 | $23.83 | $23.83 |
| 26 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,244 | $26.62 | $26.62 |
| 27 | Concrete sidewalk 4-inch (602.0405) | SF | 4,290 | $8.79 | $8.79 |
| 28 | Concrete driveway 6-inch (602.0810) | SY | 170 | $87.26 | $87.26 |
| 29 | Adjusting inlet covers (611.8115) | EACH | 12 | $800.00 | $800.00 |
| 30 | MGS guardrail 3 (614.2300) | LF | 137.50 | $27.53 | $27.53 |
| 31 | MGS guardrail 3 K (614.2330) | LF | 425 | $42.53 | $42.53 |
| 32 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $3,333.00 | $3,333.00 |
| 33 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $2,833.00 | $2,833.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 9877-00-72 (618.0100) | EACH | 1 | $100.00 | $1.00 |
| 35 | Mobilization (619.1000) | EACH | 1 | $151,000 | $253,745 |
| 36 | Water (624.0100) | MGAL | 20 | $1.00 | $1.00 |
| 37 | Topsoil (625.0100) | SY | 1,450 | $2.50 | $2.50 |
| 38 | Silt fence (628.1504) | LF | 1,300 | $2.00 | $2.00 |
| 39 | Silt fence maintenance (628.1520) | LF | 2,600 | $0.03 | $0.03 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 4 | $173.00 | $173.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $303.00 | $303.00 |
| 42 | Erosion mat class I type B (628.2004) | SY | 990 | $1.00 | $1.00 |
| 43 | Erosion mat urban class I type B (628.2008) | SY | 460 | $3.00 | $3.00 |
| 44 | Inlet protection type A (628.7005) | EACH | 20 | $100.00 | $100.00 |
| 45 | Inlet protection type C (628.7015) | EACH | 20 | $70.00 | $70.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 10 | $100.00 | $100.00 |
| 47 | Seeding mixture no. 20 (630.0120) | LB | 46 | $12.00 | $12.00 |
| 48 | Seeding mixture no. 40 (630.0140) | LB | 23 | $12.00 | $12.00 |
| 49 | Seed water (630.0500) | MGAL | 300 | $5.00 | $5.00 |
| 50 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 5 | $100.00 | $100.00 |
| 51 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 1 | $100.00 | $100.00 |
| 52 | Moving signs type II (638.2102) | EACH | 5 | $175.00 | $175.00 |
| 53 | Removing small sign supports (638.3000) | EACH | 6 | $50.00 | $50.00 |
| 54 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $12,975 |
| 55 | Traffic control drums (643.0300) | DAY | 8,000 | $0.50 | $0.15 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 300 | $1.00 | $0.45 |
| 57 | Traffic control flexible tubular marker posts (643.0500) | EACH | 14 | $30.00 | $40.00 |
| 58 | Traffic control flexible tubular marker bases (643.0600) | EACH | 14 | $7.00 | $15.75 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 600 | $0.10 | $0.10 |
| 60 | Traffic control warning lights type C (643.0715) | DAY | 2,000 | $0.10 | $0.10 |
| 61 | Traffic control connected arrow boards (643.0810) | DAY | 70 | $18.00 | $15.50 |
| 62 | Traffic control signs (643.0900) | DAY | 1,800 | $2.00 | $0.25 |
| 63 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $45.00 |
| 64 | Temporary marking line paint 4- inch (643.3105) | LF | 17,290 | $0.40 | $0.22 |
| 65 | Temporary marking line paint 8- inch (643.3205) | LF | 870 | $0.90 | $0.75 |
| 66 | Temporary marking stop line paint 18-inch (643.3805) | LF | 108 | $5.25 | $1.75 |
| 67 | Traffic control (643.5000) | EACH | 1 | $2,894.00 | $23,750 |
| 68 | Marking line epoxy 4-inch (646.1020) | LF | 5,360 | $1.70 | $1.00 |
| 69 | Marking line epoxy 8-inch (646.3020) | LF | 290 | $3.75 | $3.00 |
| 70 | Marking arrow epoxy (646.5020) | EACH | 4 | $260.00 | $830.00 |
| 71 | Marking word epoxy (646.5120) | EACH | 2 | $350.00 | $840.00 |
| 72 | Marking stop line epoxy 18-inch (646.6120) | LF | 36 | $10.00 | $34.00 |
| 73 | Marking diagonal epoxy 12-inch (646.7120) | LF | 80 | $9.00 | $33.00 |
| 74 | Marking removal line water blasting wide (646.9210) | LF | 140 | $7.25 | $9.75 |
| 75 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,714 | $0.99 | $0.99 |
| 76 | Construction staking resurfacing reference (650.8000) | LF | 2,914 | $0.11 | $0.11 |
| 77 | Construction staking sidewalk (project) 01. 9877-00-72 (650.9500) | EACH | 1 | $1.00 | $1.00 |
| 78 | Construction staking supplemental control (project) 01. 9877-00-72 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 |
| 79 | Construction staking slope stakes (650.9920) | LF | 671 | $4.00 | $4.00 |
| 80 | Sawing asphalt (690.0150) | LF | 4,110 | $1.85 | $1.49 |
| 81 | Sawing concrete (690.0250) | LF | 160 | $3.00 | $2.24 |
| 82 | Incentive iri ride (740.0440) | DOL | 940 | $1.00 | $1.00 |
| 83 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 84 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 85 | Special 01. repairing inlets and manholes (SPV.0060) | EACH | 7 | $1,400.00 | $1,400.00 |
| 86 | Special 01. UV GRP cipp 48-inch (SPV.0090) | LF | 292 | $720.00 | $720.00 |
| 87 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 700 | $10.75 | $6.75 |