WisDOT contract 20261110029 bid tabulation
Ashland - Saxon; 36th Ave to Government Rd (USH 002, Ashland County Ashland - Saxon). Let by Wisconsin DOT on November 10, 2026, Ashland. 1 bid received; low bid $4,933,265 by Northwoods Paving, A Div. of Mathy Construction610.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 42
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northwoods Paving, A Div. of Mathy Construction610 | $4,933,265 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northwoods Paving, A Div. of Mathy Construction610 |
|---|---|---|---|---|
| 1 | Removing asphaltic surface butt joints (204.0115) | SY | 1,000 | $20.72 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 148,377 | $3.71 |
| 3 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 36,096 | $1.05 |
| 4 | Prepare foundation for asphaltic paving (project) 01. 1180-00-82 (211.0101) | EACH | 1 | $3,604.04 |
| 5 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 2 | $681.02 |
| 6 | Finishing roadway (project) 01. 1180-00-82 (213.0100) | EACH | 1 | $3,023.03 |
| 7 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,840 | $42.74 |
| 8 | HMA pavement 4 MT 58-28 S (450.6224) | TON | 22,562 | $90.28 |
| 9 | HMA pavement 4 SMA 58-34 V (450.8644) | TON | 10,780 | $114.85 |
| 10 | Tack coat (455.0605) | GAL | 17,927 | $2.83 |
| 11 | Material transfer vehicle (460.9000.S) | EACH | 1 | $37,250 |
| 12 | Asphaltic surface (465.0105) | TON | 350 | $107.63 |
| 13 | Asphaltic surface patching (465.0110) | TON | 150 | $168.35 |
| 14 | Asphaltic surface driveways and field entrances (465.0120) | TON | 95 | $146.96 |
| 15 | Asphaltic rumble strips, shoulder (465.0520) | LF | 63,970 | $0.29 |
| 16 | Asphaltic rumble strips, centerline (465.0560) | LF | 29,910 | $0.46 |
| 17 | Adjusting steel plate beam guard (614.0400) | LF | 668.75 | $9.00 |
| 18 | Replacing guardrail posts and blocks (614.0950) | EACH | 34 | $89.00 |
| 19 | Replacing guardrail rail and hardware (614.0951) | LF | 780.50 | $16.00 |
| 20 | Maintenance and repair of haul roads (project) 01. 1180-00-82 (618.0100) | EACH | 1 | $100.00 |
| 21 | Mobilization (619.1000) | EACH | 1 | $444,668 |
| 22 | Water (624.0100) | MGAL | 20 | $66.38 |
| 23 | Field office type B (642.5001) | EACH | 1 | $11,399 |
| 24 | Traffic control drums (643.0300) | DAY | 400 | $0.75 |
| 25 | Traffic control signs (643.0900) | DAY | 5,260 | $1.55 |
| 26 | Traffic control signs fixed message (643.1000) | SF | 36 | $10.50 |
| 27 | Temporary marking line paint 6- inch (643.3165) | LF | 48,530 | $0.68 |
| 28 | Traffic control (643.5000) | EACH | 1 | $1,722.00 |
| 29 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 87,690 | $1.21 |
| 30 | Construction staking resurfacing reference (650.8000) | LF | 36,136 | $0.13 |
| 31 | Construction staking supplemental control (project) 01. 1180-00-82 (650.9911) | EACH | 1 | $0.01 |
| 32 | Public land survey monument verify and reset (680.0100) | EACH | 5 | $800.00 |
| 33 | Sawing asphalt (690.0150) | LF | 590 | $2.17 |
| 34 | HMA percent within limits (PWL) test strip volumetrics (706.0105) | EACH | 1 | $6,030.97 |
| 35 | Nuclear gauge correlation strip - HMA, SMA (706.0110) | EACH | 2 | $2,250.00 |
| 36 | SMA pavement test strip volumetrics (706.0115) | EACH | 1 | $13,431 |
| 37 | Incentive density PWL HMA pavement (706.2005) | DOL | 21,560 | $1.00 |
| 38 | Incentive air voids HMA pavement (706.2010) | DOL | 33,340 | $1.00 |
| 39 | Incentive iri ride (740.0440) | DOL | 27,376 | $1.00 |
| 40 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,500 | $5.00 |
| 41 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 990 | $5.00 |
| 42 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 1,320 | $6.08 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.