WisDOT contract 20261110033 bid tabulation

T Clifton, CTH M; CTH F to River Falls (CTH M, Pierce County T Clifton, CTH M). Let by Wisconsin DOT on November 10, 2026, Pierce. 2 bids received; low bid $94,023 by Century Traffic, LLC.

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
14
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Century Traffic, LLC$94,023Low
2Forward Traffic & Marking LLC$95,353+1.0%
WisDOT contract 20261110033: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Century Traffic, LLC2. Forward Traffic & Marking LLC
1Finishing roadway (project) 01. 7887-00-70 (213.0100)EACH1$2,500.00$1,250.00
2Asphaltic rumble strips, shoulder (465.0520)LF30,233$0.25$0.20
3Maintenance and repair of haul roads (project) 01. 7887-00-70 (618.0100)EACH1$1.00$1,250.00
4Mobilization (619.1000)EACH1$7,890.00$13,725
5Posts wood 4X6-inch X 14-FT (634.0614)EACH10$110.00$110.00
6Posts wood 4X6-inch X 16-FT (634.0616)EACH3$120.00$110.00
7Signs type II reflective F (637.2230)SF89$20.00$30.00
8Removing signs type II (638.2602)EACH2$40.00$35.00
9Traffic control signs (643.0900)DAY418$0.30$0.50
10Traffic control (643.5000)EACH1$2,100.00$3,700.00
11Marking line grooved wet ref epoxy 6-inch (646.2040)LF55,323$1.25$1.15
12Marking stop line epoxy 18-inch (646.6120)LF25$15.00$15.25
13On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS100$5.00$5.00
14On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS100$5.00$5.00
WisDOT contract 20261110033: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy