WisDOT contract 20261110039 bid tabulation

STH 70 - CTH B; Norwis Road to CTH B (CTH E, Sawyer County STH 70 - CTH B). Let by Wisconsin DOT on November 10, 2026, Sawyer. 5 bids received; low bid $2,864,220 by McCabe Construction, Inc..

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
93
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1McCabe Construction, Inc.$2,864,220Low
2Haas Sons, Inc.$3,033,630+6.0%
3Stout Construction, Inc.$3,275,669+14%
4A-1 Excavating LLC$3,448,449+20%
5James Peterson Sons, Inc.$3,978,862+39%
WisDOT contract 20261110039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. McCabe Construction, Inc.2. Haas Sons, Inc.3. Stout Construction, Inc.4. A-1 Excavating LLC5. James Peterson Sons, Inc.
1Clearing (201.0105)STA129$1,100.00$1,065.00$1,125.00$500.00$1,065.00
2Grubbing (201.0205)STA129$566.00$550.00$775.00$1,200.00$550.00
3Removing small pipe culverts (203.0100)EACH14$433.00$475.00$1,400.00$775.00$800.00
4Removing asphaltic surface (204.0110)SY103$6.00$5.00$12.55$11.00$30.00
5Removing asphaltic surface milling (204.0120)SY7,360$2.00$3.46$3.65$3.50$3.46
6Removing guardrail (204.0165)LF462$2.60$2.40$2.65$3.00$2.50
7Excavation common (205.0100)CY29,784$11.45$16.00$10.45$15.50$25.26
8Backfill granular grade 2 (209.2500)TON3,737$9.95$20.00$25.90$16.00$44.00
9Prepare foundation for asphaltic paving (project) 01. 8773-00-72 (211.0101)EACH1$20,000$500.00$59,000$50,000$50,686
10Finishing roadway (project) 01. 8773-00-72 (213.0100)EACH1$4,170.00$500.00$29,000$1,000.00$5,000.00
11Base aggregate dense 3/4-inch (305.0110)TON1,344$28.60$25.00$32.75$32.00$47.49
12Base aggregate dense 1 1/4-inch (305.0120)TON22,961$17.50$17.00$18.60$21.00$22.20
13Tack coat (455.0605)GAL2,680$3.50$3.41$3.60$3.50$3.41
14Incentive density HMA pavement (460.2000)DOL6,390$1.00$1.00$1.00$1.00$1.00
15HMA pavement 3 MT 58-28 S (460.6223)TON5,754$89.70$87.07$91.40$88.00$87.07
16HMA pavement 4 MT 58-34 S (460.6244)TON4,231$100.00$97.06$101.95$98.00$97.06
17Asphaltic surface driveways and field entrances (465.0120)TON55$227.40$220.78$232.00$250.00$220.78
18Asphaltic flumes (465.0315)SY63$57.15$55.46$58.25$66.00$65.46
19Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH4$252.20$450.00$415.00$650.00$279.00
20Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH2$477.00$750.00$595.00$850.00$300.00
21Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF438$128.00$135.00$156.75$135.00$205.00
22Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,353.00$1,550.00$1,100.00$1,300.00$1,356.00
23Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH21$1,702.00$2,100.00$2,275.00$2,200.00$1,872.00
24Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF52$530.00$215.00$230.25$500.00$292.00
25Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH2$2,551.00$3,350.00$2,825.00$2,700.00$2,411.00
26Culvert pipe corrugated polyethylene 12-inch (530.0112)LF54$46.00$72.00$78.00$66.00$75.00
27Culvert pipe corrugated polyethylene 24-inch (530.0124)LF78$71.50$96.00$80.00$79.00$147.00
28Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF2,295$26.10$25.35$31.10$28.00$25.35
29Riprap light (606.0100)CY20$150.00$200.00$180.00$166.00$176.00
30Riprap medium (606.0200)CY10$155.00$220.00$185.00$185.00$156.00
31Riprap heavy (606.0300)CY9$155.00$260.00$190.00$185.00$156.00
32Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF7$145.00$100.00$190.00$130.00$292.00
33Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF34$140.00$150.00$195.00$138.00$268.00
34Inlet covers type H-S (611.0639)EACH1$1,160.00$925.00$1,565.00$1,800.00$1,262.00
35Inlets 4-FT diameter (611.3004)EACH1$3,200.00$2,750.00$3,100.00$3,700.00$3,609.00
36Cover plates temporary (611.8120.S)EACH1$140.00$275.00$180.00$250.00$350.00
37Maintenance and repair of haul roads (project) 01. 8773-00-72 (618.0100)EACH1$2,575.00$750.00$24,000$500.00$150.00
38Mobilization (619.1000)EACH1$212,003$217,000$243,000$297,388$519,770
39Water (624.0100)MGAL247$37.00$50.00$84.00$10.00$60.00
40Topsoil (625.0100)SY21,155$3.80$5.95$5.50$7.50$4.89
41Salvaged topsoil (625.0500)SY21,155$2.40$1.55$5.60$7.50$4.89
42Silt fence (628.1504)LF17,545$1.60$1.85$1.60$1.70$1.53
43Silt fence maintenance (628.1520)LF17,545$0.03$0.01$0.05$0.04$0.03
44Mobilizations erosion control (628.1905)EACH12$137.00$980.00$150.00$150.00$133.00
45Mobilizations emergency erosion control (628.1910)EACH6$210.00$10.00$250.00$220.00$203.00
46Erosion mat class I type B (628.2004)SY41,100$1.00$1.02$1.00$1.00$0.95
47Erosion mat class II type C (628.2027)SY610$4.10$4.00$4.20$5.00$4.00
48Erosion mat class III type D (628.2039)SY612$9.30$25.00$9.45$10.00$9.00
49Turbidity barriers (628.6005)SY86$39.15$44.40$40.00$40.00$38.00
50Soil stabilizer type A (628.6505)ACRE0.10$5,150.00$9,085.00$5,250.00$5,250.00$5,000.00
51Inlet protection type A (628.7005)EACH1$103.00$240.00$105.00$105.00$100.00
52Inlet protection type C (628.7015)EACH1$103.00$95.00$105.00$105.00$100.00
53Temporary ditch checks (628.7504)LF290$7.20$7.00$7.35$7.50$7.00
54Culvert pipe checks (628.7555)EACH80$20.60$15.50$21.00$21.00$20.00
55Tracking pads (628.7560)EACH2$1,500.00$500.00$2,100.00$500.00$3,000.00
56Rock bags (628.7570)EACH280$6.20$15.50$6.30$7.00$6.00
57Fertilizer type A (629.0205)CWT27$97.85$85.00$100.00$100.00$95.00
58Seeding mixture no. 20 (630.0120)LB1,900$6.20$7.45$6.35$7.00$6.03
59Seeding temporary (630.0200)LB1,140$4.45$2.15$4.55$5.00$4.33
60Seed water (630.0500)MGAL480$5.00$1.00$5.25$5.00$5.00
61Markers culvert end (633.5200)EACH21$72.00$61.00$75.00$75.00$70.00
62Posts wood 4X6-inch X 16-FT (634.0616)EACH24$98.00$85.00$100.00$100.00$95.00
63Posts wood 4X6-inch X 18-FT (634.0618)EACH15$101.00$95.00$105.00$105.00$98.00
64Signs type II reflective H (637.2210)SF53.91$22.65$19.45$25.00$25.00$22.00
65Signs type II reflective F (637.2230)SF211$23.70$23.25$25.00$25.00$23.00
66Moving signs type II (638.2102)EACH27$103.00$77.00$105.00$105.00$100.00
67Removing signs type II (638.2602)EACH56$20.60$25.65$25.00$21.00$20.00
68Removing small sign supports (638.3000)EACH39$20.60$15.40$25.00$21.00$20.00
69Moving small sign supports (638.4000)EACH21$103.00$77.00$105.00$105.00$100.00
70Field office type C (642.5201)EACH1$7,500.00$15,000$10,500$10,000$15,000
71Traffic control drums (643.0300)DAY140$0.52$0.50$0.55$0.55$0.50
72Traffic control barricades type III (643.0420)DAY1,540$1.03$1.00$1.05$1.05$1.00
73Traffic control warning lights type A (643.0705)DAY3,080$0.26$0.25$0.30$0.30$0.25
74Traffic control signs (643.0900)DAY9,680$0.62$0.60$0.65$0.70$0.60
75Traffic control covering signs type II (643.0920)EACH6$30.90$30.00$35.00$32.00$30.00
76Traffic control signs PCMS (643.1050)DAY14$77.26$75.00$80.00$80.00$75.00
77Traffic control (643.5000)EACH1$3,090.46$3,000.00$3,150.00$22,000$3,000.00
78Geotextile type HR (645.0120)SY89$5.00$3.00$5.25$7.00$12.50
79Marking line epoxy 4-inch (646.1020)LF68,605$0.37$0.36$0.40$0.40$0.36
80Locating no-passing zones (648.0100)MI3.25$927.14$900.00$945.00$945.00$900.00
81Construction staking storm sewer (650.4000)EACH3$309.05$300.00$315.00$315.00$300.00
82Construction staking subgrade (650.4500)LF14,158$0.01$0.01$0.55$0.01$0.01
83Construction staking base (650.5000)LF14,158$1.03$1.00$1.05$1.05$1.00
84Construction staking curb gutter and curb & gutter (650.5500)LF2,295$1.30$1.25$1.30$1.35$1.25
85Construction staking pipe culverts (650.6000)EACH11$309.05$300.00$315.00$315.00$300.00
86Construction staking resurfacing reference (650.8000)LF3,025$0.52$0.50$0.55$0.55$0.50
87Construction staking supplemental control (project) 01. 8773-00-72 (650.9911)EACH1$1,545.23$1,500.00$1,575.00$1,575.00$1,500.00
88Construction staking slope stakes (650.9920)LF14,158$1.03$1.00$1.05$1.60$1.00
89Sawing asphalt (690.0150)LF350$5.00$3.50$2.50$3.00$2.25
90Incentive iri ride (740.0440)DOL13,017$1.00$1.00$1.00$1.00$1.00
91On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00$5.00$5.00
92On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00
93Special 01. temporary mailbox station (SPV.0060)EACH1$1,700.00$1,250.00$750.00$4,000.00$2,500.00
WisDOT contract 20261110039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy