WisDOT contract 20261110039 bid tabulation
STH 70 - CTH B; Norwis Road to CTH B (CTH E, Sawyer County STH 70 - CTH B). Let by Wisconsin DOT on November 10, 2026, Sawyer. 5 bids received; low bid $2,864,220 by McCabe Construction, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 93
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCabe Construction, Inc. | $2,864,220 | Low |
| 2 | Haas Sons, Inc. | $3,033,630 | +6.0% |
| 3 | Stout Construction, Inc. | $3,275,669 | +14% |
| 4 | A-1 Excavating LLC | $3,448,449 | +20% |
| 5 | James Peterson Sons, Inc. | $3,978,862 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCabe Construction, Inc. | 2. Haas Sons, Inc. | 3. Stout Construction, Inc. | 4. A-1 Excavating LLC | 5. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 129 | $1,100.00 | $1,065.00 | $1,125.00 | $500.00 | $1,065.00 |
| 2 | Grubbing (201.0205) | STA | 129 | $566.00 | $550.00 | $775.00 | $1,200.00 | $550.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 14 | $433.00 | $475.00 | $1,400.00 | $775.00 | $800.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 103 | $6.00 | $5.00 | $12.55 | $11.00 | $30.00 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 7,360 | $2.00 | $3.46 | $3.65 | $3.50 | $3.46 |
| 6 | Removing guardrail (204.0165) | LF | 462 | $2.60 | $2.40 | $2.65 | $3.00 | $2.50 |
| 7 | Excavation common (205.0100) | CY | 29,784 | $11.45 | $16.00 | $10.45 | $15.50 | $25.26 |
| 8 | Backfill granular grade 2 (209.2500) | TON | 3,737 | $9.95 | $20.00 | $25.90 | $16.00 | $44.00 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 8773-00-72 (211.0101) | EACH | 1 | $20,000 | $500.00 | $59,000 | $50,000 | $50,686 |
| 10 | Finishing roadway (project) 01. 8773-00-72 (213.0100) | EACH | 1 | $4,170.00 | $500.00 | $29,000 | $1,000.00 | $5,000.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,344 | $28.60 | $25.00 | $32.75 | $32.00 | $47.49 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 22,961 | $17.50 | $17.00 | $18.60 | $21.00 | $22.20 |
| 13 | Tack coat (455.0605) | GAL | 2,680 | $3.50 | $3.41 | $3.60 | $3.50 | $3.41 |
| 14 | Incentive density HMA pavement (460.2000) | DOL | 6,390 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 5,754 | $89.70 | $87.07 | $91.40 | $88.00 | $87.07 |
| 16 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 4,231 | $100.00 | $97.06 | $101.95 | $98.00 | $97.06 |
| 17 | Asphaltic surface driveways and field entrances (465.0120) | TON | 55 | $227.40 | $220.78 | $232.00 | $250.00 | $220.78 |
| 18 | Asphaltic flumes (465.0315) | SY | 63 | $57.15 | $55.46 | $58.25 | $66.00 | $65.46 |
| 19 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 4 | $252.20 | $450.00 | $415.00 | $650.00 | $279.00 |
| 20 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 2 | $477.00 | $750.00 | $595.00 | $850.00 | $300.00 |
| 21 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 438 | $128.00 | $135.00 | $156.75 | $135.00 | $205.00 |
| 22 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,353.00 | $1,550.00 | $1,100.00 | $1,300.00 | $1,356.00 |
| 23 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 21 | $1,702.00 | $2,100.00 | $2,275.00 | $2,200.00 | $1,872.00 |
| 24 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 52 | $530.00 | $215.00 | $230.25 | $500.00 | $292.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,551.00 | $3,350.00 | $2,825.00 | $2,700.00 | $2,411.00 |
| 26 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 54 | $46.00 | $72.00 | $78.00 | $66.00 | $75.00 |
| 27 | Culvert pipe corrugated polyethylene 24-inch (530.0124) | LF | 78 | $71.50 | $96.00 | $80.00 | $79.00 | $147.00 |
| 28 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 2,295 | $26.10 | $25.35 | $31.10 | $28.00 | $25.35 |
| 29 | Riprap light (606.0100) | CY | 20 | $150.00 | $200.00 | $180.00 | $166.00 | $176.00 |
| 30 | Riprap medium (606.0200) | CY | 10 | $155.00 | $220.00 | $185.00 | $185.00 | $156.00 |
| 31 | Riprap heavy (606.0300) | CY | 9 | $155.00 | $260.00 | $190.00 | $185.00 | $156.00 |
| 32 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 7 | $145.00 | $100.00 | $190.00 | $130.00 | $292.00 |
| 33 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 34 | $140.00 | $150.00 | $195.00 | $138.00 | $268.00 |
| 34 | Inlet covers type H-S (611.0639) | EACH | 1 | $1,160.00 | $925.00 | $1,565.00 | $1,800.00 | $1,262.00 |
| 35 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,200.00 | $2,750.00 | $3,100.00 | $3,700.00 | $3,609.00 |
| 36 | Cover plates temporary (611.8120.S) | EACH | 1 | $140.00 | $275.00 | $180.00 | $250.00 | $350.00 |
| 37 | Maintenance and repair of haul roads (project) 01. 8773-00-72 (618.0100) | EACH | 1 | $2,575.00 | $750.00 | $24,000 | $500.00 | $150.00 |
| 38 | Mobilization (619.1000) | EACH | 1 | $212,003 | $217,000 | $243,000 | $297,388 | $519,770 |
| 39 | Water (624.0100) | MGAL | 247 | $37.00 | $50.00 | $84.00 | $10.00 | $60.00 |
| 40 | Topsoil (625.0100) | SY | 21,155 | $3.80 | $5.95 | $5.50 | $7.50 | $4.89 |
| 41 | Salvaged topsoil (625.0500) | SY | 21,155 | $2.40 | $1.55 | $5.60 | $7.50 | $4.89 |
| 42 | Silt fence (628.1504) | LF | 17,545 | $1.60 | $1.85 | $1.60 | $1.70 | $1.53 |
| 43 | Silt fence maintenance (628.1520) | LF | 17,545 | $0.03 | $0.01 | $0.05 | $0.04 | $0.03 |
| 44 | Mobilizations erosion control (628.1905) | EACH | 12 | $137.00 | $980.00 | $150.00 | $150.00 | $133.00 |
| 45 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $210.00 | $10.00 | $250.00 | $220.00 | $203.00 |
| 46 | Erosion mat class I type B (628.2004) | SY | 41,100 | $1.00 | $1.02 | $1.00 | $1.00 | $0.95 |
| 47 | Erosion mat class II type C (628.2027) | SY | 610 | $4.10 | $4.00 | $4.20 | $5.00 | $4.00 |
| 48 | Erosion mat class III type D (628.2039) | SY | 612 | $9.30 | $25.00 | $9.45 | $10.00 | $9.00 |
| 49 | Turbidity barriers (628.6005) | SY | 86 | $39.15 | $44.40 | $40.00 | $40.00 | $38.00 |
| 50 | Soil stabilizer type A (628.6505) | ACRE | 0.10 | $5,150.00 | $9,085.00 | $5,250.00 | $5,250.00 | $5,000.00 |
| 51 | Inlet protection type A (628.7005) | EACH | 1 | $103.00 | $240.00 | $105.00 | $105.00 | $100.00 |
| 52 | Inlet protection type C (628.7015) | EACH | 1 | $103.00 | $95.00 | $105.00 | $105.00 | $100.00 |
| 53 | Temporary ditch checks (628.7504) | LF | 290 | $7.20 | $7.00 | $7.35 | $7.50 | $7.00 |
| 54 | Culvert pipe checks (628.7555) | EACH | 80 | $20.60 | $15.50 | $21.00 | $21.00 | $20.00 |
| 55 | Tracking pads (628.7560) | EACH | 2 | $1,500.00 | $500.00 | $2,100.00 | $500.00 | $3,000.00 |
| 56 | Rock bags (628.7570) | EACH | 280 | $6.20 | $15.50 | $6.30 | $7.00 | $6.00 |
| 57 | Fertilizer type A (629.0205) | CWT | 27 | $97.85 | $85.00 | $100.00 | $100.00 | $95.00 |
| 58 | Seeding mixture no. 20 (630.0120) | LB | 1,900 | $6.20 | $7.45 | $6.35 | $7.00 | $6.03 |
| 59 | Seeding temporary (630.0200) | LB | 1,140 | $4.45 | $2.15 | $4.55 | $5.00 | $4.33 |
| 60 | Seed water (630.0500) | MGAL | 480 | $5.00 | $1.00 | $5.25 | $5.00 | $5.00 |
| 61 | Markers culvert end (633.5200) | EACH | 21 | $72.00 | $61.00 | $75.00 | $75.00 | $70.00 |
| 62 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 24 | $98.00 | $85.00 | $100.00 | $100.00 | $95.00 |
| 63 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 15 | $101.00 | $95.00 | $105.00 | $105.00 | $98.00 |
| 64 | Signs type II reflective H (637.2210) | SF | 53.91 | $22.65 | $19.45 | $25.00 | $25.00 | $22.00 |
| 65 | Signs type II reflective F (637.2230) | SF | 211 | $23.70 | $23.25 | $25.00 | $25.00 | $23.00 |
| 66 | Moving signs type II (638.2102) | EACH | 27 | $103.00 | $77.00 | $105.00 | $105.00 | $100.00 |
| 67 | Removing signs type II (638.2602) | EACH | 56 | $20.60 | $25.65 | $25.00 | $21.00 | $20.00 |
| 68 | Removing small sign supports (638.3000) | EACH | 39 | $20.60 | $15.40 | $25.00 | $21.00 | $20.00 |
| 69 | Moving small sign supports (638.4000) | EACH | 21 | $103.00 | $77.00 | $105.00 | $105.00 | $100.00 |
| 70 | Field office type C (642.5201) | EACH | 1 | $7,500.00 | $15,000 | $10,500 | $10,000 | $15,000 |
| 71 | Traffic control drums (643.0300) | DAY | 140 | $0.52 | $0.50 | $0.55 | $0.55 | $0.50 |
| 72 | Traffic control barricades type III (643.0420) | DAY | 1,540 | $1.03 | $1.00 | $1.05 | $1.05 | $1.00 |
| 73 | Traffic control warning lights type A (643.0705) | DAY | 3,080 | $0.26 | $0.25 | $0.30 | $0.30 | $0.25 |
| 74 | Traffic control signs (643.0900) | DAY | 9,680 | $0.62 | $0.60 | $0.65 | $0.70 | $0.60 |
| 75 | Traffic control covering signs type II (643.0920) | EACH | 6 | $30.90 | $30.00 | $35.00 | $32.00 | $30.00 |
| 76 | Traffic control signs PCMS (643.1050) | DAY | 14 | $77.26 | $75.00 | $80.00 | $80.00 | $75.00 |
| 77 | Traffic control (643.5000) | EACH | 1 | $3,090.46 | $3,000.00 | $3,150.00 | $22,000 | $3,000.00 |
| 78 | Geotextile type HR (645.0120) | SY | 89 | $5.00 | $3.00 | $5.25 | $7.00 | $12.50 |
| 79 | Marking line epoxy 4-inch (646.1020) | LF | 68,605 | $0.37 | $0.36 | $0.40 | $0.40 | $0.36 |
| 80 | Locating no-passing zones (648.0100) | MI | 3.25 | $927.14 | $900.00 | $945.00 | $945.00 | $900.00 |
| 81 | Construction staking storm sewer (650.4000) | EACH | 3 | $309.05 | $300.00 | $315.00 | $315.00 | $300.00 |
| 82 | Construction staking subgrade (650.4500) | LF | 14,158 | $0.01 | $0.01 | $0.55 | $0.01 | $0.01 |
| 83 | Construction staking base (650.5000) | LF | 14,158 | $1.03 | $1.00 | $1.05 | $1.05 | $1.00 |
| 84 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,295 | $1.30 | $1.25 | $1.30 | $1.35 | $1.25 |
| 85 | Construction staking pipe culverts (650.6000) | EACH | 11 | $309.05 | $300.00 | $315.00 | $315.00 | $300.00 |
| 86 | Construction staking resurfacing reference (650.8000) | LF | 3,025 | $0.52 | $0.50 | $0.55 | $0.55 | $0.50 |
| 87 | Construction staking supplemental control (project) 01. 8773-00-72 (650.9911) | EACH | 1 | $1,545.23 | $1,500.00 | $1,575.00 | $1,575.00 | $1,500.00 |
| 88 | Construction staking slope stakes (650.9920) | LF | 14,158 | $1.03 | $1.00 | $1.05 | $1.60 | $1.00 |
| 89 | Sawing asphalt (690.0150) | LF | 350 | $5.00 | $3.50 | $2.50 | $3.00 | $2.25 |
| 90 | Incentive iri ride (740.0440) | DOL | 13,017 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 91 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 92 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 93 | Special 01. temporary mailbox station (SPV.0060) | EACH | 1 | $1,700.00 | $1,250.00 | $750.00 | $4,000.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.