ALDOT contract 20260424035 bid tabulation
TRAFFIC SIGNAL UPGRADES AT SIGNALIZED INTERSECTIONS ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (MOBILE AREA) AS INDICATED IN THE PLANS. Let by Alabama DOT on April 24, 2026, Mobile, 0901. 3 bids received; low bid $100,000 by Bagby & Russell Electric Company, Inc..
- Owner
- Alabama DOT
- Letting
- 24 APR 2026
- Pay items
- 24
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bagby & Russell Electric Company, Inc. | $100,000 | Low |
| 2 | Big River Electric, Inc. | $127,459 | +27% |
| 3 | Temple J Electric, LLC | $154,925 | +55% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bagby & Russell Electric Company, Inc. | 2. Big River Electric, Inc. | 3. Temple J Electric, LLC |
|---|---|---|---|---|---|---|
| 0010 | Mobilization (600A000) | LS | 1 | $12,126 | $5,000.00 | $15,000 |
| 0020 | Construction fuel (maximum bid limited to $ 4,000.00) (698A000) | LS | 1 | $0.00 | $1.00 | $0.00 |
| 0030 | Furnishing and installing traffic control unit ( mccrary road at spice pond road extension) (730C000) | LS | 1 | $4,000.00 | $7,000.00 | $6,000.00 |
| 0040 | Furnishing and installing traffic control unit ( snow road at wulff road) (730C001) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0050 | Furnishing and installing traffic control unit ( snow road at howells ferry road) (730C002) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0060 | Furnishing and installing traffic control unit ( CR-90 (tanner williams road) at mariner drive) (730C003) | LS | 1 | $4,000.00 | $7,000.00 | $6,000.00 |
| 0070 | Furnishing and installing traffic control unit ( CR-56 (airport boulevard) at air terminal drive) (730C004) | LS | 1 | $4,000.00 | $7,000.00 | $6,000.00 |
| 0080 | Furnishing and installing traffic control unit ( CR-56 (airport boulevard) at flave pierce road) (730C005) | LS | 1 | $4,000.00 | $7,000.00 | $6,000.00 |
| 0090 | Furnishing and installing traffic control unit ( mcfarland road/snow road at jeff hamilton road) (730C006) | LS | 1 | $5,000.00 | $6,500.00 | $6,000.00 |
| 0100 | Furnishing and installing traffic control unit ( dawes road at scott dairy loop road south) (730C007) | LS | 1 | $4,000.00 | $7,000.00 | $6,000.00 |
| 0110 | Furnishing and installing traffic control unit ( CR-32 (three notch- kroner road) at CR-39 (mcdonald road)/gold mine road) (730C008) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0120 | Furnishing and installing traffic control unit ( three notch-kroner road at hillcrest road) (730C009) | LS | 1 | $4,000.00 | $6,500.00 | $6,000.00 |
| 0130 | Furnishing and installing traffic control unit ( schillinger road/theodore dawes road at CR- 30 (theodore dawes road west)) (730C010) | LS | 1 | $4,000.00 | $6,000.00 | $6,000.00 |
| 0140 | Furnishing and installing traffic control unit ( theodore dawes road at old pascagoula road) (730C011) | LS | 1 | $5,000.00 | $6,500.00 | $6,000.00 |
| 0150 | Furnishing and installing traffic control unit ( theodore dawes road at nan gray davis road) (730C012) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0160 | Furnishing and installing traffic control unit ( theodore dawes road at carol plantation road) (730C013) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0170 | Furnishing and installing traffic control unit ( CR-39 (mcdonald road) at county farm road) (730C014) | LS | 1 | $5,000.00 | $6,500.00 | $6,000.00 |
| 0180 | Furnishing and installing traffic control unit ( padgett switch road at half mile road) (730C015) | LS | 1 | $5,000.00 | $7,000.00 | $6,000.00 |
| 0190 | Wood traffic signal strain pole (730G005) | EACH | 1 | $8,930.00 | $2,000.00 | $6,000.00 |
| 0200 | 2", non-metallic, conduit (730L005) | LF | 100 | $50.00 | $5.00 | $50.00 |
| 0210 | Construction signs (740B000) | SF | 868 | $1.00 | $6.00 | $6.25 |
| 0220 | Channelizing drums (740D000) | EACH | 25 | $1.00 | $60.00 | $20.00 |
| 0230 | Cones (36 inches high) (740E000) | EACH | 50 | $1.00 | $35.00 | $40.00 |
| 0240 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $1.00 | $2,500.00 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.