18" side drain unit price, Arkansas

Low bidders on ARDOT contracts carried a median of $91.00 per LF for item 606703, 18" side drain, over the 24 months to 04 NOV 2026, across 30 low bids. Half of all 132 bids fell between $79.46 and $120.00.

Owner
Arkansas DOT
Item
606703
Unit
LF
Latest letting
04 NOV 2026
$91.00Low bidder's median, per LF
$100.00Median of all bids, per LF
30Contracts in the window

By year of letting

18" side drain, ARDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221717$78.0048$84.50
20232323$85.0051$90.09
20242626$90.2262$92.34
20251313$92.0048$100.40
20261616$92.5081$100.00
18" side drain, ARDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By county

18" side drain, ARDOT: unit prices by county, last 24 months
CountyLow bidsLow-bid medianAll bidsMedian, all bids
Benton3$157.0013$112.00
Craighead4$126.0011$115.00
Crawford3$65.2511$79.02
18" side drain, ARDOT: unit prices by county, last 24 months

Countys with at least three low bids, over the last 24 months.

By quantity

18" side drain, ARDOT: low bidder's median by quantity band
Quantity (LF)Low bidsLow-bid median
24 to 457$90.00
60 to 848$105.00
92 to 1737$92.00
196 to 4988$67.72
18" side drain, ARDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ARDOT contracts carrying 18" side drain
LetContractCountyQuantityLow bidder's priceMedianBidsLow bidderSource
04 NOV 2026040904Crawford284$67.63$85.404CROSSLAND CONSTRUCTION CO., INC.ARDOT
04 NOV 2026050439Independence250$67.38$77.535WHITE RIVER MATERIALS, INC.ARDOT
23 SEP 2026070458Columbia236$83.30$83.307MOBLEY CONTRACTORS, INC.ARDOT
23 SEP 2026CB0401Benton84$179.12$118.506MOBLEY CONTRACTORS, INC.ARDOT
12 AUG 2026030531Little River60$66.05$114.876MCGEORGE CONTRACTING CO., INC.ARDOT
12 AUG 2026090702Benton94$157.00$100.003APAC-CENTRAL, INC.ARDOT
24 JUN 2026101189Craighead32$86.00$143.002WHITE RIVER MATERIALS, INC.ARDOT
24 JUN 2026BR2814Greene135$95.00$95.007ROBERTSON CONTRACTORS, INC.ARDOT
20 MAY 2026020802Jefferson68$105.00$120.0051911 CONSTRUCTION COMPANY, INC.ARDOT
08 APR 2026110751Lee40$53.21$97.508WHITE RIVER MATERIALS, INC.ARDOT
04 MAR 2026101003Randolph36$105.00$78.485ROBERTSON CONTRACTORS, INC.ARDOT
04 MAR 2026101100Greene82$105.00$110.064ROBERTSON CONTRACTORS, INC.ARDOT
21 JAN 2026061371Lonoke196$103.12$98.064WEAVER-BAILEY CONTRACTORS, INC.ARDOT
21 JAN 2026100881Craighead40$160.00$125.993ROGERS GROUP, INC.ARDOT
21 JAN 2026C19007Cross24$90.00$106.795SUGG CONSTRUCTION, INC.ARDOT
Latest ARDOT contracts carrying 18" side drain

Filter this item by your own quantity, county and period, or check your price against it, in the ARDOT explorer.

How these prices were read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ARDOT's own: this item is compared with ARDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy