24" side drain unit price, Arkansas

Low bidders on ARDOT contracts carried a median of $95.00 per LF for item 606704, 24" side drain, over the 24 months to 04 NOV 2026, across 25 low bids. Half of all 108 bids fell between $90.70 and $135.28.

Owner
Arkansas DOT
Item
606704
Unit
LF
Latest letting
04 NOV 2026
$95.00Low bidder's median, per LF
$114.19Median of all bids, per LF
25Contracts in the window

By year of letting

24" side drain, ARDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221212$86.0029$95.00
20231313$100.0034$106.31
20241919$103.4552$113.81
20251212$95.4643$117.60
20261111$95.0058$109.33
24" side drain, ARDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By quantity

24" side drain, ARDOT: low bidder's median by quantity band
Quantity (LF)Low bidsLow-bid median
28 to 546$85.88
56 to 856$117.50
88 to 1486$102.84
162 to 5207$85.88
24" side drain, ARDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ARDOT contracts carrying 24" side drain
LetContractCountyQuantityLow bidder's priceMedianBidsLow bidderSource
04 NOV 2026040904Crawford512$85.88$97.624CROSSLAND CONSTRUCTION CO., INC.ARDOT
04 NOV 2026FA0314Baxter56$95.00$95.003ROBERTSON CONTRACTORS, INC.ARDOT
23 SEP 2026110716Phillips166$80.00$108.5081911 CONSTRUCTION COMPANY, INC.ARDOT
12 AUG 2026030531Little River520$78.46$126.696MCGEORGE CONTRACTING CO., INC.ARDOT
24 JUN 2026101189Craighead148$191.00$170.502WHITE RIVER MATERIALS, INC.ARDOT
24 JUN 2026BR2814Greene65$110.00$110.007ROBERTSON CONTRACTORS, INC.ARDOT
08 APR 2026110832Cross52$62.73$111.838WHITE RIVER MATERIALS, INC.ARDOT
04 MAR 2026101003Randolph162$130.00$107.755ROBERTSON CONTRACTORS, INC.ARDOT
04 MAR 2026101100Greene60$125.00$129.454ROBERTSON CONTRACTORS, INC.ARDOT
21 JAN 2026061371Lonoke102$116.59$110.624WEAVER-BAILEY CONTRACTORS, INC.ARDOT
21 JAN 2026FA1108Clay88$89.08$89.077DELTA ASPHALT OF ARKANSAS, INC.ARDOT
15 OCT 2025040746Washington250$92.92$92.923APAC-CENTRAL, INC.ARDOT
17 SEP 2025090647Baxter110$80.00$125.006CROUSE CONSTRUCTION CO.ARDOT
17 SEP 2025101132Poinsett40$98.00$115.003SEAGRAVES CONSTRUCTION, INC.ARDOT
13 AUG 2025020628Jefferson62$180.87$165.022REDSTONE CONSTRUCTION GROUP, INC.ARDOT
Latest ARDOT contracts carrying 24" side drain

Filter this item by your own quantity, county and period, or check your price against it, in the ARDOT explorer.

How these prices were read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ARDOT's own: this item is compared with ARDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy