ARDOT contract A30044 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO PERFORM PATCHING AND RE-SEAL JOINTS ON APPROXIMATELY 1.111 MILES OF HIGHWAY 151 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT FOR PATCHING, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT PATCHING, JOINT REHABILITATION, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, CRACK ROUT AND SEAL, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on May 20, 2026, Miller. 2 bids received; low bid $1,700,755 by Diamond Surface, Inc..
- Owner
- Arkansas DOT
- Letting
- 20 MAY 2026
- Pay items
- 23
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Diamond Surface, Inc. | $1,700,755 | Low |
| 2 | Weaver-Bailey Contractors, Inc. | $1,797,015 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Diamond Surface, Inc. | 2. Weaver-Bailey Contractors, Inc. |
|---|---|---|---|---|---|
| 0001 | Achm patching of existing roadway (415011) | TON | 100 | $450.00 | $268.57 |
| 0002 | Removal and disposal of concrete pavement for patching (507002) | SY | 562 | $51.25 | $178.70 |
| 0003 | Removal and disposal of continuously reinforced concrete pavement for patching (507013) | SY | 1,524 | $69.85 | $231.17 |
| 0004 | Portland cement concrete pavement patching (12" uniform thickness) (507232) | SY | 562 | $385.25 | $345.77 |
| 0005 | Continuously reinforced concrete pavement patching (12" uniform thickness) (507310) | SY | 1,524 | $551.50 | $379.18 |
| 0006 | Joint rehabilitation (type A) (509001) | LF | 1,192 | $15.20 | $10.49 |
| 0007 | Maintenance of traffic (603009) | LS | 1 | $74,115 | $153,214 |
| 0008 | Signs (604003) | SF | 1,209 | $15.00 | $14.30 |
| 0009 | Traffic drums (604023) | EACH | 300 | $62.50 | $57.20 |
| 0010 | Construction pavement markings (604041) | LF | 4,262 | $1.82 | $0.57 |
| 0011 | Advance warning arrow panel (604071) | DAY | 48 | $18.75 | $14.30 |
| 0012 | Portable changeable message sign (604078) | WEEK | 8 | $437.50 | $418.00 |
| 0013 | Mobile speed notification system (special) (604160) | EACH | 1 | $11,875 | $11,000 |
| 0014 | Roadway construction control (635011) | LS | 1 | $6,250.00 | $3,621.19 |
| 0015 | Rumble strips in portland cement concrete shoulders (642002) | LF | 84 | $31.25 | $27.50 |
| 0016 | Enhanced thermoplastic pavement marking white (6") (719502) | LF | 18,902 | $1.88 | $1.06 |
| 0017 | Enhanced thermoplastic pavement marking white (12") (719505) | LF | 2,602 | $3.75 | $15.40 |
| 0018 | Enhanced thermoplastic pavement marking yellow (6") (719602) | LF | 17,268 | $1.88 | $1.03 |
| 0019 | Raised pavement markers (type II) (721002) | EACH | 499 | $12.50 | $8.80 |
| 0020 | Class S concrete-roadway (802012) | CY | 9.34 | $1,415.00 | $1,171.32 |
| 0021 | Reinforcing steel-roadway (grade 60) (804003) | LB | 210 | $16.25 | $15.07 |
| 0022 | Crack rout and seal (916027) | LF | 26,496 | $4.75 | $5.30 |
| 0023 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $75,000 | $84,857 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of May 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.