ARDOT contract A30044 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO PERFORM PATCHING AND RE-SEAL JOINTS ON APPROXIMATELY 1.111 MILES OF HIGHWAY 151 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT FOR PATCHING, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT PATCHING, JOINT REHABILITATION, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, CRACK ROUT AND SEAL, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on May 20, 2026, Miller. 2 bids received; low bid $1,700,755 by Diamond Surface, Inc..

Owner
Arkansas DOT
Letting
20 MAY 2026
Pay items
23
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Diamond Surface, Inc.$1,700,755Low
2Weaver-Bailey Contractors, Inc.$1,797,015+6.0%
ARDOT contract A30044: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Diamond Surface, Inc.2. Weaver-Bailey Contractors, Inc.
0001Achm patching of existing roadway (415011)TON100$450.00$268.57
0002Removal and disposal of concrete pavement for patching (507002)SY562$51.25$178.70
0003Removal and disposal of continuously reinforced concrete pavement for patching (507013)SY1,524$69.85$231.17
0004Portland cement concrete pavement patching (12" uniform thickness) (507232)SY562$385.25$345.77
0005Continuously reinforced concrete pavement patching (12" uniform thickness) (507310)SY1,524$551.50$379.18
0006Joint rehabilitation (type A) (509001)LF1,192$15.20$10.49
0007Maintenance of traffic (603009)LS1$74,115$153,214
0008Signs (604003)SF1,209$15.00$14.30
0009Traffic drums (604023)EACH300$62.50$57.20
0010Construction pavement markings (604041)LF4,262$1.82$0.57
0011Advance warning arrow panel (604071)DAY48$18.75$14.30
0012Portable changeable message sign (604078)WEEK8$437.50$418.00
0013Mobile speed notification system (special) (604160)EACH1$11,875$11,000
0014Roadway construction control (635011)LS1$6,250.00$3,621.19
0015Rumble strips in portland cement concrete shoulders (642002)LF84$31.25$27.50
0016Enhanced thermoplastic pavement marking white (6") (719502)LF18,902$1.88$1.06
0017Enhanced thermoplastic pavement marking white (12") (719505)LF2,602$3.75$15.40
0018Enhanced thermoplastic pavement marking yellow (6") (719602)LF17,268$1.88$1.03
0019Raised pavement markers (type II) (721002)EACH499$12.50$8.80
0020Class S concrete-roadway (802012)CY9.34$1,415.00$1,171.32
0021Reinforcing steel-roadway (grade 60) (804003)LB210$16.25$15.07
0022Crack rout and seal (916027)LF26,496$4.75$5.30
0023Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$75,000$84,857
ARDOT contract A30044: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy